  #1621  
Old Posted Jun 14, 2019, 4:25 PM
Jawnadelphia's Avatar
Jawnadelphia Jawnadelphia is offline
Registered User
 
Join Date: May 2014
Location: Wilmington, Delaware
Posts: 2,854
Quote:
Originally Posted by Boku View Post
Construction permits were issued last week for 3001, 3003, 3025, and 3051 JFK for "site demolition of existing surface parking lot".
Excellent, just to visualize it -- here's the site plan:
https://schuylkillyards.com/development-schuylkill-yards
Reply With Quote
     
     
  #1622  
Old Posted Jun 14, 2019, 4:33 PM
boxbot's Avatar
boxbot boxbot is offline
Registered User
 
Join Date: Feb 2014
Location: Delco., Pa.
Posts: 842
Quote:
Originally Posted by Boku View Post
Construction permits were issued last week for 3001, 3003, 3025, and 3051 JFK for "site demolition of existing surface parking lot".
That's exciting. I had assumed this was simply a pipe dream.
Reply With Quote
     
     
  #1623  
Old Posted Jun 14, 2019, 6:43 PM
Boku Boku is offline
Registered User
 
Join Date: Jul 2014
Posts: 770
Quote:
Originally Posted by boxbot View Post
That's exciting. I had assumed this was simply a pipe dream.
You thought that about Dranoff's building too, so maybe just continue doubting everything so that everything gets built?
Reply With Quote
     
     
  #1624  
Old Posted Jun 14, 2019, 7:32 PM
Redddog Redddog is offline
Registered User
 
Join Date: Apr 2016
Location: Philadelphia
Posts: 1,532
Quote:
Originally Posted by Boku View Post
Construction permits were issued last week for 3001, 3003, 3025, and 3051 JFK for "site demolition of existing surface parking lot".
Is that the Megabus Pickup location?
Reply With Quote
     
     
  #1625  
Old Posted Jun 14, 2019, 8:11 PM
boxbot's Avatar
boxbot boxbot is offline
Registered User
 
Join Date: Feb 2014
Location: Delco., Pa.
Posts: 842
Quote:
Originally Posted by Boku View Post
You thought that about Dranoff's building too, so maybe just continue doubting everything so that everything gets built?
Calm down. It's been 5 1/2 years on that Dranoff project and they're only now breaking ground; and Dranoff appears to have made away with the state funds he had demanded for his hotel even though there is no longer a hotel.
Reply With Quote
     
     
  #1626  
Old Posted Jun 15, 2019, 12:51 PM
jsbrook jsbrook is offline
Registered User
 
Join Date: Aug 2014
Location: Bala Cynwyd
Posts: 3,658
Quote:
Originally Posted by Boku View Post
Construction permits were issued last week for 3001, 3003, 3025, and 3051 JFK for "site demolition of existing surface parking lot".
Links:

https://li.phila.gov/#summary?addres...nedy+boulevard

https://li.phila.gov/#summary?addres...nedy+boulevard

https://li.phila.gov/#summary?addres...nedy+boulevard

https://li.phila.gov/#summary?addres...nedy+boulevard

A lot of these are actually ancillary activity and say other permits will need to be granted for actual construction. But still great!

Last edited by jsbrook; Jun 15, 2019 at 1:11 PM.
Reply With Quote
     
     
  #1627  
Old Posted Jun 15, 2019, 4:36 PM
Urbanthusiat's Avatar
Urbanthusiat Urbanthusiat is offline
Registered User
 
Join Date: Dec 2015
Location: South Philly
Posts: 1,706
Good to see movement on the first step required for actual development here. Brandywine always said the plan was to finish Drexel Square before doing anything else, and it seems they're wasting no time after finishing.
Reply With Quote
     
     
  #1628  
Old Posted Jun 15, 2019, 4:51 PM
mcgrath618's Avatar
mcgrath618 mcgrath618 is offline
Moderator
 
Join Date: Jan 2017
Location: Clark Park, Philadelphia, PA
Posts: 3,749
Quote:
Originally Posted by Boku View Post
Construction permits were issued last week for 3001, 3003, 3025, and 3051 JFK for "site demolition of existing surface parking lot".
Awesome. Looks like we should in theory see actual, honest of god renderings of at least one of these by the end of the summer. I'm really looking forward to this development. This stretch of JFK is dead.

Quote:
Originally Posted by Redddog View Post
Is that the Megabus Pickup location?
Yes, yes it is.
__________________
Philadelphia Transportation Thread: http://forum.skyscraperpage.com/showthread.php?t=164129
Reply With Quote
     
     
  #1629  
Old Posted Jun 15, 2019, 4:53 PM
Philly Fan Philly Fan is offline
Registered User
 
Join Date: Feb 2013
Posts: 2,502
Quote:
Originally Posted by Urbanthusiat View Post
Good to see movement on the first step required for actual development here. Brandywine always said the plan was to finish Drexel Square before doing anything else, and it seems they're wasting no time after finishing.
Not to mention that they probably wouldn't be forsaking the revenue generated by these parking lots unless construction were imminent.
Reply With Quote
     
     
  #1630  
Old Posted Jun 16, 2019, 11:16 AM
Jawnadelphia's Avatar
Jawnadelphia Jawnadelphia is offline
Registered User
 
Join Date: May 2014
Location: Wilmington, Delaware
Posts: 2,854


I think interior work has started, unless Lowe's wallpapering is a thing now.




Why is this tree missing it's middle???
Reply With Quote
     
     
  #1631  
Old Posted Jun 16, 2019, 5:07 PM
Inquizative Inquizative is offline
Registered User
 
Join Date: Dec 2017
Posts: 119
Red face

Because it is, it's not perfect, such as the world. "It is, what it is."
Reply With Quote
     
     
  #1632  
Old Posted Jun 20, 2019, 3:21 PM
Jawnadelphia's Avatar
Jawnadelphia Jawnadelphia is offline
Registered User
 
Join Date: May 2014
Location: Wilmington, Delaware
Posts: 2,854
Inga's review on Drexel Park, and again mentions, "...Brandywine will break ground this winter on a 770,000-square foot office tower designed by PAU Studio. 4) It will also start work next door on a 344-unit apartment building with 200,000 square of office space.

https://www.inquirer.com/real-estate...-20190620.html

Very interested to see what PAU comes up with here for Brandywine, their founder Vishaan Chakrabarti is a fierce advocate for designing "timeless cities."
https://pau.studio/

https://pau.studio/wow/
Reply With Quote
     
     
  #1633  
Old Posted Jun 20, 2019, 3:24 PM
jsbrook jsbrook is offline
Registered User
 
Join Date: Aug 2014
Location: Bala Cynwyd
Posts: 3,658
Quote:
Originally Posted by Jawnadelphia View Post
Inga's review on Drexel Park, and again mentions, "...Brandywine will break ground this winter on a 770,000-square foot office tower designed by PAU Studio. 4) It will also start work next door on a 344-unit apartment building with 200,000 square of office space.

https://www.inquirer.com/real-estate...-20190620.html

Very interested to see what PAU comes up with here for Brandywine, their founder Vishaan Chakrabarti is a fierce advocate for designing "timeless cities."
https://pau.studio/

https://pau.studio/wow/
Me too! Where do people think the nice condo, townhome, and single family home developments will happen as this develops into another key business district? Outside but the boundaries of the Schuylkill Yards itself but nearby?
Reply With Quote
     
     
  #1634  
Old Posted Jul 10, 2019, 2:55 PM
mcgrath618's Avatar
mcgrath618 mcgrath618 is offline
Moderator
 
Join Date: Jan 2017
Location: Clark Park, Philadelphia, PA
Posts: 3,749
Entire front of the Bulletin Building is covered in scaffolding. Work has begun.
__________________
Philadelphia Transportation Thread: http://forum.skyscraperpage.com/showthread.php?t=164129
Reply With Quote
     
     
  #1635  
Old Posted Jul 24, 2019, 1:52 AM
PhillyDreamsReturns PhillyDreamsReturns is offline
User Since 2002
 
Join Date: Jun 2019
Posts: 61
From Brandywine Realty Trusts earnings call transcript:

The Bulletin Building renovation work has commenced and will be completed the first half of next year. As you know, the entire office component is leased to Spark Therapeutics and will remain in the 9.3% free and clear yield on cost upon full stabilization. We did provide a brief update in itself on Schuylkill Yards and Broadmoor, but to amplify a couple of points, we officially opened our public park on June 10th. Also during June, we received final approval for the remaining portions of Schuylkill Yards, which will enable us now to proceed on the entire 5.1 million square feet of a mixed use development. So that was a great accomplishment, we're very pleased with that.

Current design efforts, as we've outlined in this sup, really focus on our West Tower, which consists of retail parking, about 200,000 square feet of office and 326 apartment units, which is being done in conjunction with our residential partner, Gotham. Work on a primarily office-based East Tower is also progressing. And notably, planning is under way on a 300,000 to 400,000 dedicated life science tower that we're doing in conjunction with our life science partner, Longfellow. Our leasing pipeline is extremely healthy, including almost 500,000 square feet of life science uses. Given our read of the residential market and partnership with Gotham, we could be in a position to go on the West Tower by year-end 2019.


https://www.nasdaq.com/article/brand...ript-cm1181662
Reply With Quote
     
     
  #1636  
Old Posted Jul 24, 2019, 11:56 AM
Jawnadelphia's Avatar
Jawnadelphia Jawnadelphia is offline
Registered User
 
Join Date: May 2014
Location: Wilmington, Delaware
Posts: 2,854
^Very impressive news. Definitely sounds like an announcement/rendering for the West Tower is very close (200,000 sq. ft of office, 326 apartments...).

Just for fun, the Riverwalk taller tower will be 321 units (at 363 feet tall). So with 200,000 sq of office, and I guess some sort of parking garage podium, the West Tower should be pretty tall.
Reply With Quote
     
     
  #1637  
Old Posted Jul 24, 2019, 4:01 PM
RowanGrad RowanGrad is offline
Registered User
 
Join Date: Nov 2018
Location: Philly, PA (Fishtown/Northern Liberties)
Posts: 45
Quote:
Originally Posted by PhillyDreamsReturns View Post
From Brandywine Realty Trusts earnings call transcript:

The Bulletin Building renovation work has commenced and will be completed the first half of next year. As you know, the entire office component is leased to Spark Therapeutics and will remain in the 9.3% free and clear yield on cost upon full stabilization. We did provide a brief update in itself on Schuylkill Yards and Broadmoor, but to amplify a couple of points, we officially opened our public park on June 10th. Also during June, we received final approval for the remaining portions of Schuylkill Yards, which will enable us now to proceed on the entire 5.1 million square feet of a mixed use development. So that was a great accomplishment, we're very pleased with that.

Current design efforts, as we've outlined in this sup, really focus on our West Tower, which consists of retail parking, about 200,000 square feet of office and 326 apartment units, which is being done in conjunction with our residential partner, Gotham. Work on a primarily office-based East Tower is also progressing. And notably, planning is under way on a 300,000 to 400,000 dedicated life science tower that we're doing in conjunction with our life science partner, Longfellow. Our leasing pipeline is extremely healthy, including almost 500,000 square feet of life science uses. Given our read of the residential market and partnership with Gotham, we could be in a position to go on the West Tower by year-end 2019.


https://www.nasdaq.com/article/brand...ript-cm1181662
Anyone know what they mean by "West Tower" and "East Tower"? Could it be 3051 JFK West and East?
__________________
Philly Guy
Road Construction Inspector
Reply With Quote
     
     
  #1638  
Old Posted Jul 24, 2019, 4:35 PM
Boku Boku is offline
Registered User
 
Join Date: Jul 2014
Posts: 770
Quote:
Originally Posted by RowanGrad View Post
Anyone know what they mean by "West Tower" and "East Tower"? Could it be 3051 JFK West and East?
They are marketing 3001 JFK and 3025 JFK, so I think it's safe to assume 3001 is the East Tower and 3025 is the West Tower.

https://schuylkillyards.com/our-properties
Reply With Quote
     
     
  #1639  
Old Posted Jul 24, 2019, 4:39 PM
Aaamazarite's Avatar
Aaamazarite Aaamazarite is offline
Cory Trevor Leahy
 
Join Date: Aug 2009
Location: Wash West
Posts: 617
Quote:
Originally Posted by RowanGrad View Post
Anyone know what they mean by "West Tower" and "East Tower"? Could it be 3051 JFK West and East?
I believe they mean 3001 and 3025 JFK. Those are the ones they are pushing for lease on their website and those are the ones that have recently gotten permits for site prep. In the renderings, 3025 is taller than the FMC tower!
Reply With Quote
     
     
  #1640  
Old Posted Jul 24, 2019, 5:42 PM
jsbrook jsbrook is offline
Registered User
 
Join Date: Aug 2014
Location: Bala Cynwyd
Posts: 3,658
Quote:
Originally Posted by Aaamazarite View Post
I believe they mean 3001 and 3025 JFK. Those are the ones they are pushing for lease on their website and those are the ones that have recently gotten permits for site prep. In the renderings, 3025 is taller than the FMC tower!
:
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Global Projects & Construction > Proposals
Forum Jump



Forum Jump


All times are GMT. The time now is 8:19 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.