Quote:
Originally Posted by red-paladin
I think Translink is going to have to install more faregates at Brentwood station when this project is complete.
|
This.
I actually predict an inevitable platform expansion.
This station is already busy in the morning, and this observation comes from when I used the system prior to SoLo, and obviously prior to completion of the Mall towers.
Assuming even only 10% of new residents use Skytrain, I see it being a problem in the morning.
This doesn't even include the multitude of smaller developments, and the few random buildings that will use the Brentwood station, like Milano.
And now that I'm typing, imagine when Concord Brentwood is up?
This station will be packed inside of 36 months.
And this is where there is a massive failure in any sort of leadership in this province/region.
Any community planner should be looking at the density increase to come in the next 36-48 months.
Extrapolate current ridership rates for the community, and see the use metrics.
There is no way that adding the 3 new communities of SoLo, Concord, and Amazing wont overload this station.
Rant over.