  #141  
Old Posted Nov 11, 2023, 6:41 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,999
They had their tree topping ceremony with the completion of some of the mechanical penthouse walls now poured. Still need to finish the roof slab on the west wing.
Reply With Quote
     
     
  #142  
Old Posted Dec 13, 2023, 6:03 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,999
Concrete forming team has now completed their work and they have started cleaning up and trucking away the forms and supports cleaning up the site. Looks like the roofing contractor is prepping for the flat roof install. For some reason there has been little progress on installing the window modules on the higher floors. Did notice a large delivery of drywall being unloaded so they are prepping for after the weather proof roofing is installed. It will be a cold winter hanging from a swing station finishing the exterior concrete for that team.
Reply With Quote
     
     
  #143  
Old Posted Dec 14, 2023, 4:44 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,999
The HVAC chiller units have been lifted to the roof now.
Reply With Quote
     
     
  #144  
Old Posted Jan 3, 2024, 2:42 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,999
For some reason they have not been installing window units from about the 7th floor up. Suspect they have run into supplier issues with deliveries from whomever was making the windows.
Reply With Quote
     
     
  #145  
Old Posted Jan 28, 2024, 5:08 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,999
Still no progress with the window unit installs above the 7th floor. Small team on a swing station are working on the exterior concrete finishing. Activity level has been low this month likely in part due to weather.
Reply With Quote
     
     
  #146  
Old Posted Feb 10, 2024, 1:29 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,999
Drewlo finally brought in a backhoe and dump truck and started to remove the concrete slag piled up on the south entrance way. Very little progress on exterior concrete finishing visible to date. Window installation still not happening.

Last edited by jammer139; Mar 11, 2024 at 9:21 PM.
Reply With Quote
     
     
  #147  
Old Posted Feb 13, 2024, 5:33 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,999
Looks like they got a delivery of window units as they have made progress installing windows on the north side.
Reply With Quote
     
     
  #148  
Old Posted Mar 13, 2024, 2:30 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,999
Have made good progress recently with installing the window units and are now up to the 15th floor. Swing station crew have been busy working on concrete finishing of the exterior south side walls in preparation for painters.
Reply With Quote
     
     
  #149  
Old Posted Apr 10, 2024, 2:19 AM
Djeffery Djeffery is offline
Registered User
 
Join Date: Oct 2017
Location: London
Posts: 4,702
Forgot I snapped a pic last week while sitting at the light at Oxford and Wharncliffe. I don't come eastbound on Oxford at that point very often and hadn't really taken the time to notice this building.

Reply With Quote
     
     
  #150  
Old Posted Apr 27, 2024, 12:10 AM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,999
Sign up on Talbot street about road closure the week of May 6th to 10th. No doubt Drewlo is taking down their tower crane from this building. Might be delivered directly to their new project at Highbury and Edgevalley. They have also now installed the last few windows remaining except for the garbage chutes.
Reply With Quote
     
     
  #151  
Old Posted Apr 28, 2024, 2:32 AM
rdaner rdaner is offline
Registered User
 
Join Date: May 2009
Posts: 167
Is this the next project to open in the central city?
Reply With Quote
     
     
  #152  
Old Posted Apr 29, 2024, 12:52 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,999
This 16s by Drewlo and the 13s on St James by Old Oak still have alot of exterior and interior finishing work to complete before the first tenants. Will likely see that by Aug. As i imagine both are targeting the back to school market in Sept.
Reply With Quote
     
     
  #153  
Old Posted May 6, 2024, 2:33 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,999
Talbot Street is now closed as they setup the heavy duty mobile crane to remove the tower crane from this 16s Drewlo building.
Reply With Quote
     
     
  #154  
Old Posted May 7, 2024, 3:10 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,999
Started disassembling the tower crane today. Should have it loaded on trucks by end of day. Work can then begin on the crane base and the passthru holes in the parking levels where the tower segment poked thru.
Reply With Quote
     
     
  #155  
Old Posted May 9, 2024, 12:12 AM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,999
Talbot St has reopened after the tower crane removal and the heavy lift mobile crane was packed up today. Still many months of exterior and interior finishing before the units will see the first tenants.
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > London > Projects & Construction Updates
Forum Jump



Forum Jump


All times are GMT. The time now is 7:47 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.