HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan


Reply

 
Thread Tools Display Modes
     
     
  #141  
Old Posted Jun 29, 2018, 8:48 PM
Wpg_Guy's Avatar
Wpg_Guy Wpg_Guy is online now
Registered User
 
Join Date: Aug 2002
Location: Winnipeg, Manitoba
Posts: 5,537
Reply With Quote
     
     
  #142  
Old Posted Jul 4, 2018, 3:05 PM
h0twired's Avatar
h0twired h0twired is offline
Dynamic Positivity!
 
Join Date: Jul 2006
Location: Winnipeg
Posts: 2,914
Need to have a pool to predict how long those hydro poles will remain on the site.
Reply With Quote
     
     
  #143  
Old Posted Jul 4, 2018, 9:19 PM
cllew cllew is offline
Registered User
 
Join Date: Feb 2012
Posts: 4,229
Quote:
Originally Posted by h0twired View Post
Need to have a pool to predict how long those hydro poles will remain on the site.
All the wires are gone from the poles in the view I just looked at, so now it depends on if Brockstall wants to pay MB Hydro to remove the poles or if they want to take them down with their people to save money.

I bet they can get a subcontractor in to remove them for less than MB Hydro would charge. It may even be one of the Subs that hydro uses in Winnipeg but there won't be Hydro's overhead added to the bill.
Reply With Quote
     
     
  #144  
Old Posted Jul 4, 2018, 10:51 PM
Wpg_Guy's Avatar
Wpg_Guy Wpg_Guy is online now
Registered User
 
Join Date: Aug 2002
Location: Winnipeg, Manitoba
Posts: 5,537
Reply With Quote
     
     
  #145  
Old Posted Jul 5, 2018, 4:06 AM
buzzg buzzg is offline
Registered User
 
Join Date: Apr 2013
Posts: 7,810
Quote:
Originally Posted by cllew View Post
All the wires are gone from the poles in the view I just looked at, so now it depends on if Brockstall wants to pay MB Hydro to remove the poles or if they want to take them down with their people to save money.

I bet they can get a subcontractor in to remove them for less than MB Hydro would charge. It may even be one of the Subs that hydro uses in Winnipeg but there won't be Hydro's overhead added to the bill.
Wait, Bockstael can do demolition and construction, but can't remove some wood hydro poles?
Reply With Quote
     
     
  #146  
Old Posted Jul 5, 2018, 6:07 AM
trueviking's Avatar
trueviking trueviking is offline
surely you agree with me
 
Join Date: Sep 2004
Location: winnipeg
Posts: 13,747
Steel starts in three weeks.
Reply With Quote
     
     
  #147  
Old Posted Jul 5, 2018, 1:43 PM
cllew cllew is offline
Registered User
 
Join Date: Feb 2012
Posts: 4,229
Quote:
Originally Posted by buzzg View Post
Wait, Bockstael can do demolition and construction, but can't remove some wood hydro poles?
If the contractor is going to do the removal instead of paying Hydro to do it they would sub it out like most other things are subbed on construction site.
Reply With Quote
     
     
  #148  
Old Posted Jul 5, 2018, 2:59 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 14,316
Does Bockstael actually do any of the construction? Or do the sub it out? Maybe they do some of the concrete or steel erection. Even with concrete, lots of large contractors sub out the rebar install to the supplier or other contractor. It's very piece meal from my experiences.
Reply With Quote
     
     
  #149  
Old Posted Jul 5, 2018, 9:11 PM
trueviking's Avatar
trueviking trueviking is offline
surely you agree with me
 
Join Date: Sep 2004
Location: winnipeg
Posts: 13,747
hydro poles are gone....
Reply With Quote
     
     
  #150  
Old Posted Jul 5, 2018, 9:57 PM
Wpg_Guy's Avatar
Wpg_Guy Wpg_Guy is online now
Registered User
 
Join Date: Aug 2002
Location: Winnipeg, Manitoba
Posts: 5,537
Reply With Quote
     
     
  #151  
Old Posted Jul 6, 2018, 2:41 AM
1ajs's Avatar
1ajs 1ajs is offline
ʇɥƃıuʞ -*ʞpʇ*-
 
Join Date: Jul 2005
Location: lynn lake
Posts: 26,065
wow that was quick.
Reply With Quote
     
     
  #152  
Old Posted Jul 10, 2018, 3:30 PM
buzzg buzzg is offline
Registered User
 
Join Date: Apr 2013
Posts: 7,810
I'm no Hydro or construction expert... but why aren't streets like James having the lines put underground when the entire street is getting torn apart to the core? If it was this "easy" here, it seems ridiculous to not be doing it along with complete street renewals in the rest of the Exchange.
Reply With Quote
     
     
  #153  
Old Posted Jul 10, 2018, 6:32 PM
Jeff's Avatar
Jeff Jeff is offline
Registered User
 
Join Date: Oct 2002
Location: Winnipeg|MB
Posts: 2,266
the speed and efficiency of a project driven entirely by private dollars and the richest family in town is quite mind blowing.
__________________
instagram: @jeff_vernaus
Reply With Quote
     
     
  #154  
Old Posted Jul 10, 2018, 7:52 PM
ywgwalk ywgwalk is offline
Formerly rypinion
 
Join Date: Mar 2018
Location: Exchange District, Winnipeg
Posts: 389
Quote:
Originally Posted by Jeff View Post
the speed and efficiency of a project driven entirely by private dollars and the richest family in town is quite mind blowing.
I think the major difference is that years of planning and back and forth happened in private instead of in public.
Reply With Quote
     
     
  #155  
Old Posted Jul 10, 2018, 8:08 PM
esquire's Avatar
esquire esquire is offline
Registered User
 
Join Date: Oct 2001
Posts: 37,483
^ Yeah, good point. Hints were dropped about the project years ago. It had to have been at least 5 years since it first came up in discussion around here.
Reply With Quote
     
     
  #156  
Old Posted Jul 10, 2018, 9:18 PM
trueviking's Avatar
trueviking trueviking is offline
surely you agree with me
 
Join Date: Sep 2004
Location: winnipeg
Posts: 13,747
Fast for you....an eternity for me!

The job number on my computer is early 2014.

Here was the first schematic design way back when.

Reply With Quote
     
     
  #157  
Old Posted Jul 10, 2018, 9:33 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 14,316
Get your car in their for good measure! haha Where's your girlfriend? What's her name, married to Timberlake?
Reply With Quote
     
     
  #158  
Old Posted Jul 10, 2018, 9:50 PM
trueviking's Avatar
trueviking trueviking is offline
surely you agree with me
 
Join Date: Sep 2004
Location: winnipeg
Posts: 13,747
Jessica Biel....the Richardson's area a classy group...had to delete her.
Reply With Quote
     
     
  #159  
Old Posted Jul 30, 2018, 2:05 AM
Wpg_Guy's Avatar
Wpg_Guy Wpg_Guy is online now
Registered User
 
Join Date: Aug 2002
Location: Winnipeg, Manitoba
Posts: 5,537

Chris Dion Maxwell (@maxwell_entertainment) on Instagram
Reply With Quote
     
     
  #160  
Old Posted Jul 30, 2018, 6:56 PM
Wolf13 Wolf13 is offline
Registered User
 
Join Date: Apr 2016
Posts: 1,664
Quote:
Originally Posted by bomberjet View Post
Does Bockstael actually do any of the construction? Or do the sub it out? Maybe they do some of the concrete or steel erection. Even with concrete, lots of large contractors sub out the rebar install to the supplier or other contractor. It's very piece meal from my experiences.
They do more than most, as a lot of General Contractors sub out more. Typically, you're correct, concrete trades would install seperately installed rebar. Bockstael however also often acts as a concrete contractor, like on 300 Main.

As such, I'd imagine they don't have a need to sub it out when they're the GC.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump



Forum Jump


All times are GMT. The time now is 9:51 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.