Old Posted May 6, 2016, 12:10 PM
cllew cllew is online now
Registered User
 
Join Date: Feb 2012
Posts: 4,766
Talking about tower cranes I just looked out my office window and it looks like the first truck of parts arrived. Looks like it could be the base frame and power supply panel. Over the last two days Manitoba Hydro was installing the feeder lines and a transformer to the site for heavy duty power.
Reply With Quote
     
     
  #1542  
Old Posted May 6, 2016, 1:29 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,099
Quote:
Originally Posted by cheswick View Post
I believe you're misunderstanding what he was saying. He's saying maybe they're just building the podium of tower two to facilitate the skywalk system. And in a decade or two or three build the tower on top of the podium.
Yes, that it was I was saying. If tower 2 is to be mostly condos. Since there's already a glut on the market, the tower could not go ahead right away. Like Cyro said, TN stated a 2019 opening, so maybe this is all for not.
Reply With Quote
     
     
  #1543  
Old Posted May 6, 2016, 1:31 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,099
And yes it looks like tower crane base sections being unloaded this morning. Yellow in colour. Where is the transformer installed? Can't really see it on the cam..
Reply With Quote
     
     
  #1544  
Old Posted May 6, 2016, 1:33 PM
cllew cllew is online now
Registered User
 
Join Date: Feb 2012
Posts: 4,766
Quote:
Originally Posted by bomberjet View Post
And yes it looks like tower crane base sections being unloaded this morning. Where is the transformer installed? Can't really see it on the cam..
Corner of Graham and Carlton. Hydro had some of the construction hording down on that corner on Wednesday to trench in some conduit to the u/g Manhole feed.
Reply With Quote
     
     
  #1545  
Old Posted May 6, 2016, 1:35 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,099
Oh okay. Down in the hole? There have been vac tucks and other people doing stuff down there. Wasn't quite sure what they were up to. But vac tucks are usually there for utilities, so would make sense.
Reply With Quote
     
     
  #1546  
Old Posted May 6, 2016, 1:57 PM
cllew cllew is online now
Registered User
 
Join Date: Feb 2012
Posts: 4,766
No, it's the sidewalk level next to the west of the water decanting tanks.

I guess the base plates came in early as I see that they have been moved into the compound where the old hotel was located.

Right now there is a vac truck sucking out the solids from the decanting tanks. Not sure if the slurry goes to Brady or if there is some private land that Vac-All puts it on? Maybe its going with the rest of the spoil that was excavated out of the pit.
Reply With Quote
     
     
  #1547  
Old Posted May 6, 2016, 2:03 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,099
Ah cool, thanks.
Reply With Quote
     
     
  #1548  
Old Posted May 6, 2016, 3:50 PM
oftheMoon's Avatar
oftheMoon oftheMoon is offline
Registered User
 
Join Date: May 2013
Location: East Exchanger
Posts: 675
^^^^ Or maybe there will be lots of excitement and interest in living at TNS? While there could be a glut of condos on the market, this definitely a very unique location which could generate interest.
Reply With Quote
     
     
  #1549  
Old Posted May 6, 2016, 3:58 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,099
Yup, could be. I'm, just being excited, thinking about the project. Haven't heard anything on tower 2, so speculating a bit IF it didn't go ahead. IF, being big capital letters. haha
Reply With Quote
     
     
  #1550  
Old Posted May 6, 2016, 6:52 PM
windypeg windypeg is offline
Registered User
 
Join Date: Jul 2013
Posts: 417
Quote:
Originally Posted by cheswick View Post
I believe you're misunderstanding what he was saying. He's saying maybe they're just building the podium of tower two to facilitate the skywalk system. And in a decade or two or three build the tower on top of the podium.
I think what carlos was saying is, someday when they start construction on tower 2, would it be an issue to have the crane in operation right beside an open skywalk
Reply With Quote
     
     
  #1551  
Old Posted May 15, 2016, 3:18 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,099
Construction site looks a bit different now. Crews moved everything to the SE corner, where they're done all the foundation work. Drill rig shacks are on blocks up the ramp.
Reply With Quote
     
     
  #1552  
Old Posted May 15, 2016, 9:25 PM
cllew cllew is online now
Registered User
 
Join Date: Feb 2012
Posts: 4,766
The drill shacks must have been moved on Saturday as there were still in the pit when I left work at midnight Friday.

they will have to move them out of the way first thing on Monday as they will be blocking the fuel truck that comes in the morning to fill up all the cranes and tracked drills.
Reply With Quote
     
     
  #1553  
Old Posted May 17, 2016, 5:21 PM
1ajs's Avatar
1ajs 1ajs is offline
ʇɥƃıuʞ -*ʞpʇ*-
 
Join Date: Jul 2005
Location: lynn lake
Posts: 26,506
from twitter
"Susan Joshi ‏@susanjoshiwin 14h14 hours ago
@TDK_Knight @truenorthsquare
2 tower cranes confirmed- as of tonight!
Coming soon!!!"
Reply With Quote
     
     
  #1554  
Old Posted May 17, 2016, 5:22 PM
bomberguy's Avatar
bomberguy bomberguy is offline
GQMF
 
Join Date: Jan 2007
Location: Winnipeg
Posts: 656

Last edited by Cyro; May 17, 2016 at 6:15 PM. Reason: Added Source to photo.
Reply With Quote
     
     
  #1555  
Old Posted May 17, 2016, 6:14 PM
Cyro's Avatar
Cyro Cyro is offline
Registered User
 
Join Date: Jan 2013
Posts: 5,197
Thx for the pic ^ Added source to photo. This one might change as it's a direct link..

2 cranes? The quicker the better, what's the timetable for them?
Reply With Quote
     
     
  #1556  
Old Posted May 17, 2016, 6:16 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,099
Uh oh. Another ever changing photo haha
Reply With Quote
     
     
  #1557  
Old Posted May 17, 2016, 6:21 PM
Cyro's Avatar
Cyro Cyro is offline
Registered User
 
Join Date: Jan 2013
Posts: 5,197
^ ehh, haha..So we have 2 cranes coming in, sounds like a tower I and II plan, both the office/residential moving forward.
Reply With Quote
     
     
  #1558  
Old Posted May 17, 2016, 6:28 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,099
That's the way it sounds. I'll just assume the residential is going ahead. They've never said it wouldn't, stated phase two tower timeline is opening 2019 and now two towers cranes basically confirmed (from a real estate agent).
Reply With Quote
     
     
  #1559  
Old Posted May 17, 2016, 6:38 PM
esquire's Avatar
esquire esquire is offline
Registered User
 
Join Date: Oct 2001
Posts: 37,480
Quote:
Originally Posted by Cyro View Post
^ ehh, haha..So we have 2 cranes coming in, sounds like a tower I and II plan, both the office/residential moving forward.
Well well well...
Reply With Quote
     
     
  #1560  
Old Posted May 17, 2016, 8:27 PM
cllew cllew is online now
Registered User
 
Join Date: Feb 2012
Posts: 4,766
the bases for the tower cranes came in a few weeks ago and are being stored on the old Beachcomber lot right now.

Manitoba Hydro was in installing a transformer on the Graham and Carlton sidewalk area over the last two weeks which I assume is to provide high voltate power to the cranes as the rest of the site already has 120v power coming from where the parking attendant shack was located.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump



Forum Jump


All times are GMT. The time now is 4:50 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.