210 State St, Building 1·Renovation (Structural) · Ref Code: EWPBMS
Print Summary Submit Add to Watch List
Type:
Renovation (Structural)
Applicant:
Edr Architects
Status:
Application Submitted
Date Filed:
11/12/2018
Closed:
No
Description
THIS IS PRIMARILY AN INTERIOR RENOVATION TO THE FIRST AND SECOND FLOORS OF THE NORTHEAST WING AT THE NEW ORLEANS ADOLESCENT HOSPITAL BUILDING ON CHILDREN’S HOSPITAL STATE STREET CAMPUS. THE EXISTING FIRST FLOOR OFFICE SPACE AND SECOND FLOOR VACANT SPACE, WILL BE RENOVATED TO SERVE THE PROGRAMMING NEEDS OF A PARENT CENTER. MODIFICATIONS OF EXISTING MECHANICAL, ELECTRICAL AND PLUMBING WILL BE REQUIRED. A NEW ENTRANCE, ADA-ACCESSIBLE ENTRY AND RAIN PROTECTION CANOPY WILL BE INTRODUCED TO THE FIRST FLOOR TO SERVE AS A MAIN ENTRANCE.
Letting for the NOLA airport Loyola exit i scheduled for next fiscal year.. this must mean they have settled on one of the concepts... budgets 100 million
4133 Banks St·New Construction · Ref Code: 7FGD64
Print Summary Submit Add to Watch List
Type:
New Construction
Applicant:
Scott Evans
Status:
Application Submitted
Date Filed:
11/14/2018
Closed:
No
Description
Construction of a new 1,460 SF pedestrian bridge over Banks St at Jesuit High School. Includes new doors at existing buildings on each end. Also new lighting on the bridge itself for pedestrian traffic only.
Crane is going up for The Odeon today:
Proposal for the upperfloors in the 800 block of canal street: