Old Posted Nov 1, 2018, 2:50 PM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,474
All i Know was the plans that i did see showed a two story apartment project above ground floor retail and parking in the steel structure..however that plan just dealt with the steal structure.. that building next to it thats torn down came for sale after and im guessing is now part of the overall project.. so who knows what the plan is now that thats part of the project it seems
Reply With Quote
     
     
  #14942  
Old Posted Nov 1, 2018, 6:17 PM
Jeau Jeau is offline
Registered User
 
Join Date: Sep 2018
Posts: 44
How’s construction going on the Odeon Tower? And do we know anything about the Domain companies 6th phase to there project?
Reply With Quote
     
     
  #14943  
Old Posted Nov 1, 2018, 6:50 PM
NOLAborn NOLAborn is offline
Registered User
 
Join Date: Jun 2018
Posts: 2
Quote:
Originally Posted by tennis1400 View Post



pic of some of the arrivals area
Does anyone have any idea where the taxi/ride share loading zone will be?

Also the chartered vehicle; sedans/limos,private motorcoaches, hotel shuttles, public buses, long term parking shuttle?

I really hope they have thought this through during the design period. There are so many airports that have taken theses vehicles into consideration (Las Vegas) and there are so many that haven’t...
Reply With Quote
     
     
  #14944  
Old Posted Nov 1, 2018, 10:11 PM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,474
Quote:
Originally Posted by Jeau View Post
How’s construction going on the Odeon Tower? And do we know anything about the Domain companies 6th phase to there project?
pile driving and no idea yet
Reply With Quote
     
     
  #14945  
Old Posted Nov 2, 2018, 1:52 AM
jjslonaker jjslonaker is offline
NOLA Razorback
 
Join Date: Jan 2012
Location: New Orleans, LA
Posts: 467
Quote:
Originally Posted by Jeau View Post
How’s construction going on the Odeon Tower? And do we know anything about the Domain companies 6th phase to there project?
Via one of the architects I follow on instagram they're nearly done with the 300ish concrete pilings and are about to do 300 more wood ones, but that shouldnt take as long.
Reply With Quote
     
     
  #14946  
Old Posted Nov 2, 2018, 2:43 AM
Jeau Jeau is offline
Registered User
 
Join Date: Sep 2018
Posts: 44
Quote:
Originally Posted by jjslonaker View Post
Via one of the architects I follow on instagram they're nearly done with the 300ish concrete pilings and are about to do 300 more wood ones, but that shouldnt take as long.
What is the architects Instagram name? I would like to follow him/her so I can see.
Reply With Quote
     
     
  #14947  
Old Posted Nov 2, 2018, 1:22 PM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,474
Quote:
Originally Posted by NOLAborn View Post
Does anyone have any idea where the taxi/ride share loading zone will be?

Also the chartered vehicle; sedans/limos,private motorcoaches, hotel shuttles, public buses, long term parking shuttle?

I really hope they have thought this through during the design period. There are so many airports that have taken theses vehicles into consideration (Las Vegas) and there are so many that haven’t...
There will be dedicated areas for these things
Reply With Quote
     
     
  #14948  
Old Posted Nov 2, 2018, 6:19 PM
jjslonaker jjslonaker is offline
NOLA Razorback
 
Join Date: Jan 2012
Location: New Orleans, LA
Posts: 467
Quote:
Originally Posted by Jeau View Post
What is the architects Instagram name? I would like to follow him/her so I can see.
@dirtycoastrunner He doesn't post too often but sometimes you'll get an interesting behind the scenes look at stuff
Reply With Quote
     
     
  #14949  
Old Posted Nov 3, 2018, 3:31 PM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,474
Reply With Quote
     
     
  #14950  
Old Posted Nov 3, 2018, 4:28 PM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,474
1700 Franklin Ave·Renovation (Non-Structural) · Ref Code: AX210T
Download (6) Print Summary Submit Add to Watch List
Type:
Renovation (Non-Structural)
Applicant:
Woods Ronn
Status:
Application Submitted
Date Filed:
11/1/2018
Closed:
No
Description
Change of Use from a vacant commercial to a take out restaurant.


djsnola
1903 Jefferson Ave·Renovation (Structural) · Ref Code: JYT18F
Print Summary Submit Add to Watch List
Type:
Renovation (Structural)
Applicant:
Blake Bergeron
Status:
Application Submitted
Date Filed:
11/2/2018
Closed:
No
Description
Renovation of Existing Fourth Floor to convert to Art Studios. Project Area is 4,000 sf.


djsnola
2740 St Louis St·Renovation (Non-Structural) · Ref Code: TVRAYR
Print Summary Submit Add to Watch List
Type:
Renovation (Non-Structural)
Applicant:
Jakob Rosenzweig
Status:
Application Submitted
Date Filed:
11/2/2018
Closed:
No
Description
Renovations and improvements for white box outfit of existing commercial building & partial tenant build-out.



1522 Baronne St·New Construction · Ref Code: GEYQBF
Download (2) Print Summary Submit Add to Watch List
Type:
New Construction
Applicant:
Pat Swelling
Status:
Application Submitted
Date Filed:
11/1/2018
Closed:
No
Description
New construction of multi-family, mixed use building as per plans.



400 Lafayette St·Attached Sign · Ref Code: JJF5TR
Print Summary Submit Add to Watch List
Type:
Attached Sign
Applicant:
Monica Moreira
Status:
Application Submitted
Date Filed:
11/1/2018
Closed:
No
Description
Gyu Kaku Projecting Sign




5330 St Claude Ave·Renovation (Structural) · Ref Code: NEKYK1
Print Summary Submit Add to Watch List
Type:
Renovation (Structural)
Applicant:
John Lambertson
Status:
Application Submitted
Date Filed:
10/31/2018
Closed:
No
Description
Proposed renovation of the existing structure at 5330 St. Claude Avenue. The existing building is approximately 10,080 SF. Proposed project is a grocery with a pharmacy that is approximately 4960 SF. The proposed project also consist of three (3) commercial rental spaces. We are seeking shell only permit for the commercial rental spaces. Build out permits will be filed separately.







1014 N Rampart St·Board of Building Standards and Appeals · Project #BBSA No. 18-66 · Ref Code: 68QRQ2
Download (3) Print Summary Submit Add to Watch List
Type:
Board of Building Standards and Appeals
Applicant:
1014 N Rampart LLC
Status:
Draft Application
Date Filed:
10/31/2018
Closed:
No
Description
The applicant is appealing the raising of a Historic Configuration of an existing building into a base flood elevation.













The Garage and The Julia:



Reply With Quote
     
     
  #14951  
Old Posted Nov 3, 2018, 4:58 PM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,474
Kickstarting November at New Orleans Museum of Art where great progress has been made at the Sydney and Walda Besthoff Sculpture Garden expansion site! As you can see, the oval shaped gallery building now has walls and a roof. We’ve started installing insulation, sheetrock, and MEP rough in. Framing for the boardwalk has started and the highly anticipated canal link bridge, also called a “Moses Bridge” for the unique experience of walking through water, is nearing completion. Additionally, aquatic soil and plants have been installed throughout the lagoon area, and cypress trees have been planted. Stay tuned for more project progress! #palmisanoprojects #sydneyandwaldabesthoffsculpturegarden










Union Street Renovations
Renovation of a 12,102 square foot existing building into 11 condo units. One of those will be a 4th-floor penthouse unit that will be added to the existing building.









Reply With Quote
     
     
  #14952  
Old Posted Nov 3, 2018, 5:12 PM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,474
214 Magazine St·Board of Building Standards and Appeals · Project #BBSA No. 18-68 · Ref Code: V3211V
Download (6) Print Summary Submit Add to Watch List
Type:
Board of Building Standards and Appeals
Applicant:
Shabtai Perl
Status:
Draft Application
Date Filed:
11/1/2018
Closed:
No
Description
The applicant is appealing IBC Section 102,Table 1021.2 . Due to the site configuration and restraints, as well as the existing conditions of the building it is not feasible to create any new exits therefore, In order to provide added measures of safety, the applicant wish to provide the following alternatives to above requirements to allow use of the fourth floor without adding a second exit





Reply With Quote
     
     
  #14953  
Old Posted Nov 3, 2018, 5:16 PM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,474
The Filmore











Reply With Quote
     
     
  #14954  
Old Posted Nov 3, 2018, 5:24 PM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,474
Sazerac House











Reply With Quote
     
     
  #14955  
Old Posted Nov 4, 2018, 7:40 PM
ardecila's Avatar
ardecila ardecila is offline
TL;DR
 
Join Date: Jun 2006
Location: the city o'wind
Posts: 16,475
Man, that Sazerac House is gonna be amazing. I gotta come back down when they open it... even if (god forbid) the liquor-focused concept fails, it’s like a move-in ready retail flagship for Uniqlo, H&M, Zara, etc. They’ve really done the work to make that building stand strong and useful for another century. Or if Rubenstein’s ever wanted to modernize and expand into something like a mini department store with licensed store-in-stores. A big retail presence on Canal St would do wonders.
__________________
la forme d'une ville change plus vite, hélas! que le coeur d'un mortel...
Reply With Quote
     
     
  #14956  
Old Posted Nov 5, 2018, 2:22 AM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,474
Quote:
Originally Posted by ardecila View Post
Man, that Sazerac House is gonna be amazing. I gotta come back down when they open it... even if (god forbid) the liquor-focused concept fails, it’s like a move-in ready retail flagship for Uniqlo, H&M, Zara, etc. They’ve really done the work to make that building stand strong and useful for another century. Or if Rubenstein’s ever wanted to modernize and expand into something like a mini department store with licensed store-in-stores. A big retail presence on Canal St would do wonders.
It is really beautiful... dont forget its also going to be new corporate headquarters for southern comfort too
Reply With Quote
     
     
  #14957  
Old Posted Nov 5, 2018, 3:00 PM
buckett5425 buckett5425 is offline
Registered User
 
Join Date: Mar 2008
Location: New Orleans - LGD
Posts: 154
Quote:
Originally Posted by ardecila View Post
Man, that Sazerac House is gonna be amazing. I gotta come back down when they open it... even if (god forbid) the liquor-focused concept fails, it’s like a move-in ready retail flagship for Uniqlo, H&M, Zara, etc. They’ve really done the work to make that building stand strong and useful for another century. Or if Rubenstein’s ever wanted to modernize and expand into something like a mini department store with licensed store-in-stores. A big retail presence on Canal St would do wonders.
The ground floor of the Ritz would be ideal for flagship retail. If demand were ever great enough, the Ritz would relocate the spa and conference rooms to another area of the hotel.
Reply With Quote
     
     
  #14958  
Old Posted Nov 5, 2018, 3:36 PM
C. C. is offline
Registered User
 
Join Date: Jan 2014
Posts: 3,091
Has the weird abandoned building at the foot of Canal started its rehab into a Marriott(?) hotel yet?
Reply With Quote
     
     
  #14959  
Old Posted Nov 5, 2018, 4:12 PM
jjslonaker jjslonaker is offline
NOLA Razorback
 
Join Date: Jan 2012
Location: New Orleans, LA
Posts: 467
Quote:
Originally Posted by CIA View Post
Has the weird abandoned building at the foot of Canal started its rehab into a Marriott(?) hotel yet?
You mean the World Trade Center? If so thats being currently renovated into a Four Seasons hotel and residences
Reply With Quote
     
     
  #14960  
Old Posted Nov 6, 2018, 12:09 AM
C. C. is offline
Registered User
 
Join Date: Jan 2014
Posts: 3,091
Quote:
Originally Posted by jjslonaker View Post
You mean the World Trade Center? If so thats being currently renovated into a Four Seasons hotel and residences
Really? Construction has started??
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Global Projects & Construction > City Compilations
Forum Jump



Forum Jump


All times are GMT. The time now is 2:58 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.