  #1441  
Old Posted Apr 29, 2025, 4:48 AM
Changing City's Avatar
Changing City Changing City is offline
Registered User
 
Join Date: Nov 2016
Posts: 8,181
Quote:
Originally Posted by Tvisforme View Post
The Wikipedia article on the Canada Line references a Daily Hive article from 2017 that highlights potential stations at YVR, Capstan, 57th and 33rd
I think the engineering to provide a possible future station was to create a level section of track, rather than following the contours of the street. I don't think any actual structures were built as part of the cut and cover tunnels. It's possible there's some sort of structure that allows the removal of a section of the wall, but I doubt that it would be obvious in any images of the construction.
__________________
Contemporary Vancouver development blog, https://changingcitybook.wordpress.com/ Then and now Vancouver blog https://changingvancouver.wordpress.com/
Reply With Quote
     
     
  #1442  
Old Posted Apr 29, 2025, 5:09 AM
madog222 madog222 is online now
Moderator
 
Join Date: Jan 2014
Posts: 4,156
There are no station boxs and AFAIK there are no structural or infrastructure difference fron the rest of the tunnels, only a flat and straight section of track.

My understanding is that if a station would be constructed the existing tunnel roof and wall(s?) would need to be completely removed before the new station structure is constructed.

Last edited by madog222; Apr 29, 2025 at 5:25 AM.
Reply With Quote
     
     
  #1443  
Old Posted Apr 29, 2025, 5:28 AM
logan5's Avatar
logan5 logan5 is offline
Registered User
 
Join Date: Feb 2011
Location: Mt.Pleasant - The New Downtown South
Posts: 8,157
Hmm, all this time I thought there was a roughed in station box - just the raw station with no mechanical, electrical, etc.
Reply With Quote
     
     
  #1444  
Old Posted Apr 29, 2025, 5:59 AM
Stainer Stainer is offline
Registered User
 
Join Date: Jan 2024
Posts: 57
Quote:
Originally Posted by Changing City View Post
I think the engineering to provide a possible future station was to create a level section of track, rather than following the contours of the street. I don't think any actual structures were built as part of the cut and cover tunnels. It's possible there's some sort of structure that allows the removal of a section of the wall, but I doubt that it would be obvious in any images of the construction.
Okay great that's what I was thinking as well. If there were completed station boxes ready to go, we would know about them, or at least Kenneth Chan would.
Reply With Quote
     
     
  #1445  
Old Posted Apr 29, 2025, 6:26 AM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,639
This CoV document about a 57th station seems to imply it's never going to happen. They had a ballpark $90 million figure back then so maybe 200-300 million now?

Search for this text on Google to find the document

City of Vancouver
https://council.vancouver.ca
PDF
Motion - Future Canada Line Station at 57 and Cambie: 2017 Nov 28
Reply With Quote
     
     
  #1446  
Old Posted Apr 29, 2025, 6:34 AM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,639
And this

Quote:
Affleck said he never got the clarity he sought about what happened with the 57th Avenue station and funds raised for it, but he thinks it’s unlikely to ever be built.

The city said this week it will continue to preserve the space to accommodate a possible 57th Avenue station in the future, “if TransLink includes it in a future plan.”

In the meantime, the $20 million contribution from Onni will be “reserved for a future station,” the city said, or reallocated to other uses if a station is not delivered. But, the city’s statement said, TransLink has no plans to build stations at either 57th or 33rd Avenue.
https://vancouversun.com/opinion/columni...transit-station-where-vancouver-stations
Reply With Quote
     
     
  #1447  
Old Posted Apr 29, 2025, 8:22 AM
madog222 madog222 is online now
Moderator
 
Join Date: Jan 2014
Posts: 4,156
Quote:
Originally Posted by jollyburger View Post
This CoV document about a 57th station seems to imply it's never going to happen. They had a ballpark $90 million figure back then so maybe 200-300 million now?

Search for this text on Google to find the document

City of Vancouver
https://council.vancouver.ca
PDF
Motion - Future Canada Line Station at 57 and Cambie: 2017 Nov 28
Also notable from that document that Translink estimates it would take 10 years to build.
Reply With Quote
     
     
  #1448  
Old Posted Apr 29, 2025, 3:28 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is online now
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,607
The Heather lands discussion should have included a station at 33rd. It could also serve the hospital complex there and QE park, Nat Bailey, VanDusen, etc. The most important additional station for that line and a lost opportunity IMO. All of those venues are PITA parking for the most part.
Reply With Quote
     
     
  #1449  
Old Posted Apr 29, 2025, 6:25 PM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
Registered User
 
Join Date: Oct 2015
Location: Kitsilano/Fairview
Posts: 10,121
I vaguely recall discussion about how the whole area is bedrock, just like QE Park - so 57th is at least on the table, but 33rd isn't.

SO many cut corners for the Olympics.
Reply With Quote
     
     
  #1450  
Old Posted Apr 29, 2025, 6:28 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is online now
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,607
Quote:
Originally Posted by Migrant_Coconut View Post
I vaguely recall discussion about how the whole area is bedrock, just like QE Park - so 57th is at least on the table, but 33rd isn't.

SO many cut corners for the Olympics.
Well nothing is impossible, but yeah the expense would be pretty high. It's too bad.
Reply With Quote
     
     
  #1451  
Old Posted Apr 30, 2025, 1:58 AM
ilikeredheads ilikeredheads is offline
Registered User
 
Join Date: Sep 2016
Location: west coast
Posts: 651
Just like with Capstan, the only thing that was done that leaves the option of future station is the placement of the power rail. Normally it's on the right side of the track but near 33rd and 57th, there are short stretches of track where the power rail is on the left side.
Reply With Quote
     
     
  #1452  
Old Posted Apr 30, 2025, 2:18 AM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,639
Quote:
Originally Posted by ilikeredheads View Post
Just like with Capstan, the only thing that was done that leaves the option of future station is the placement of the power rail. Normally it's on the right side of the track but near 33rd and 57th, there are short stretches of track where the power rail is on the left side.
Does that happen in both directions or just when the train is southbound? It doesn't have anything to do with sections where the tunnels are stacked versus side by side and placement of emergency exits in the tunnel?
Reply With Quote
     
     
  #1453  
Old Posted Apr 30, 2025, 4:13 AM
madog222 madog222 is online now
Moderator
 
Join Date: Jan 2014
Posts: 4,156
Quote:
Originally Posted by ilikeredheads View Post
Just like with Capstan, the only thing that was done that leaves the option of future station is the placement of the power rail. Normally it's on the right side of the track but near 33rd and 57th, there are short stretches of track where the power rail is on the left side.
That was certainly true for the Capstan Station location but definitely isn't for the 33rd and 57th locations inside the tunnels.
Reply With Quote
     
     
  #1454  
Old Posted Apr 30, 2025, 9:41 PM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,639
The Compass changes is $507 million (?) with a budget

2025 7.3
2026 67.0
2027 105.2
2028 92.8
2029 61.9
2030 111.4
2031 61.7

Compass Modernization – an account-based Compass system will create opportunities for more personalized payment plans and oferings.

https://www.translink.ca/-/media/transli...30-joint-board-and-mc-meeting-agenda.pdf
Reply With Quote
     
     
  #1455  
Old Posted Apr 30, 2025, 11:15 PM
Mac Write Mac Write is offline
Registered User
 
Join Date: Dec 2008
Posts: 1,423
does it show a timeline for when digital compass cards will come out? Being able to use my Apple Watch as a disabled user would drastically improve accessibility for tapping in.
Reply With Quote
     
     
  #1456  
Old Posted Apr 30, 2025, 11:23 PM
chowhou's Avatar
chowhou chowhou is online now
Registered User
 
Join Date: Sep 2019
Location: East Vancouver (No longer across the ocean!)
Posts: 3,738
I just want my distance based Skytrain and bus fares. Where are you getting that the Compass card modernization budget is for an account-based system? I can't see that in the infrastructure plan.
Reply With Quote
     
     
  #1457  
Old Posted Apr 30, 2025, 11:38 PM
madog222 madog222 is online now
Moderator
 
Join Date: Jan 2014
Posts: 4,156
Quote:
Originally Posted by chowhou View Post
I just want my distance based Skytrain and bus fares. Where are you getting that the Compass card modernization budget is for an account-based system? I can't see that in the infrastructure plan.
https://www.translink.ca/about-us/customer-service/customer-experience-action-plan
Reply With Quote
     
     
  #1458  
Old Posted May 1, 2025, 12:21 AM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is offline
Registered User
 
Join Date: May 2010
Posts: 4,784
I'd like them to stop selling Day Passes as a separate item where you have to choose in advance whether or not your planned trips will be cheaper using them or using individual fares. Day Passes should be implemented as a daily cap on the fares you pay - if you accumulate more than the cost of the Day Pass then you should be charged for the Day Pass and no more.
Reply With Quote
     
     
  #1459  
Old Posted May 1, 2025, 1:23 AM
Sheba Sheba is offline
Registered User
 
Join Date: Jan 2015
Location: BC
Posts: 4,589
Quote:
Originally Posted by Mac Write View Post
does it show a timeline for when digital compass cards will come out? Being able to use my Apple Watch as a disabled user would drastically improve accessibility for tapping in.
Making the wristband available for more groups (currently there's only the standard blue and orange versions available) would solve that problem - but they don't seem to be in any hurry to do it (I've asked multiple times).
Reply With Quote
     
     
  #1460  
Old Posted May 1, 2025, 2:19 AM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,639
(duplicate)

Last edited by jollyburger; May 1, 2025 at 2:35 AM.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 8:23 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.