HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Downtown & Urban Ottawa


Reply

 
Thread Tools Display Modes
     
     
  #1401  
Old Posted Apr 28, 2016, 7:21 PM
Temperance Temperance is offline
Registered User
 
Join Date: Mar 2009
Location: Winnipeg
Posts: 471
Quote:
Originally Posted by Harley613 View Post
Wow, I wasn't expecting Rendezvous to win. While their bid was nice, it still amounts to little more than an arena and a lot of condos. The other proposal was a little out there, but it had some cool features.
Agreed. This is a bit better than the original NCC vision for Lebreton Flats but not much.
Reply With Quote
     
     
  #1402  
Old Posted Apr 28, 2016, 7:22 PM
phil235's Avatar
phil235 phil235 is offline
Registered User
 
Join Date: Sep 2006
Location: Ottawa
Posts: 4,577
Quote:
Originally Posted by AndyMEng View Post
NCC: Hey, so if you could just make the same as Lansdowne, but bigger, that'd be great.

Rendezvous: Sure thing, boss!

Ottawa: Yawn, sure fine, whatever.
Couldn't disagree more. The RV plan is excellent. Everyone I've talked to is really excited.
Reply With Quote
     
     
  #1403  
Old Posted Apr 28, 2016, 7:23 PM
Marshsparrow Marshsparrow is offline
Registered User
 
Join Date: Dec 2009
Posts: 1,679
2050 and it will still be nothing more than a dirt pile
Reply With Quote
     
     
  #1404  
Old Posted Apr 28, 2016, 7:24 PM
McC's Avatar
McC McC is offline
Registered User
 
Join Date: Apr 2010
Posts: 3,057
Quote:
Originally Posted by Marshsparrow View Post
2050 and it will still be nothing more than a dirt pile
that is also always a strong possibility.
Reply With Quote
     
     
  #1405  
Old Posted Apr 28, 2016, 7:26 PM
daud's Avatar
daud daud is offline
Registered User
 
Join Date: Jun 2012
Location: Ottawa
Posts: 762
Quote:
Originally Posted by AndyMEng View Post
NCC: Hey, so if you could just make the same as Lansdowne, but bigger, that'd be great.

Rendezvous: Sure thing, boss!

Ottawa: Yawn, sure fine, whatever.
I listened to the whole presentation. they considered Devcore's the bolder one for sure but were worried about long term viability. They went with the safe bet (calling the arena as "sufficient" for national attraction) and they went with the one with the strongest urban design features. That LRT splitting the Devcore proposal they felt created 2 separate sites.

Its interesting because the positive comments in this thread were echoed by the NCC and the shortcomings of each were also echoed by the NCC. They clearly stated both were great and both were capable of winning. They picked Rendez-Vous for urban design and security of being able to bring in the crowds in the near term.

On many levels, they made a wise choice.
Reply With Quote
     
     
  #1406  
Old Posted Apr 28, 2016, 7:26 PM
Temperance Temperance is offline
Registered User
 
Join Date: Mar 2009
Location: Winnipeg
Posts: 471
On the bright side this is good news for the Ottawa Senators.
Reply With Quote
     
     
  #1407  
Old Posted Apr 28, 2016, 7:28 PM
Capital Shaun Capital Shaun is offline
Registered User
 
Join Date: May 2012
Location: Ottawa
Posts: 862
Quote:
Originally Posted by Marshsparrow View Post
2050 and it will still be nothing more than a dirt pile
Even if this project moves forward, it'll take years, if not decades, for all those residential towers to get built.
Reply With Quote
     
     
  #1408  
Old Posted Apr 28, 2016, 7:32 PM
passwordisnt123 passwordisnt123 is offline
Registered User
 
Join Date: Mar 2015
Location: Ottawa (Centretown)
Posts: 643
Reason prevaled today.

The Rendezvous bid was clearly the stronger bid from a market-based perspective, from an urban design perspective (burying the Confederation Line tracks instead of chopping up the neighbourhood) and from a conceptual perspective (almost no question marks associated with the Rendezvous bid whereas the Devcore bid was riddled with question marks, the biggest two alone being the car museum and the stadium with no anchor tenant).

All of the attractions in the Devcore bid would have been geared towards daytime activities and probably would have closed at 5:30 pm on weekdays and on Sundays just further exacerbating the problem with central Ottawa. The Rendezvous bid also comes out on top in this measure too at least so far as I'm concerned.

This is a good day for Ottawa. As one of the panelists mentioned, any city in Canada would be proud to have a development like this in their downtowns.
Reply With Quote
     
     
  #1409  
Old Posted Apr 28, 2016, 7:40 PM
AndyMEng AndyMEng is offline
Registered User
 
Join Date: Jun 2015
Posts: 393
Quote:
Originally Posted by daud View Post
I listened to the whole presentation. they considered Devcore's the bolder one for sure but were worried about long term viability. They went with the safe bet (calling the arena as "sufficient" for national attraction) and they went with the one with the strongest urban design features. That LRT splitting the Devcore proposal they felt created 2 separate sites.

Its interesting because the positive comments in this thread were echoed by the NCC and the shortcomings of each were also echoed by the NCC. They clearly stated both were great and both were capable of winning. They picked Rendez-Vous for urban design and security of being able to bring in the crowds in the near term.

On many levels, they made a wise choice.
Everything you're saying is correct. This is the wise choice. I do look forward to going to a Sens game in the near future without sitting in traffic.

Its also the practical choice, the safe bet, the least to make waves, and kinda boring. Hope you like Milestones, Kelsey's, and Jack Astors for your non-hockey entertainment, because that's all we're gonna get here!

Also, my last bone to pick is the architecture. It's yawn-tastic and a group of square glass towers lacks imagination. Can we not get some interesting architecture going on here? (And I'm not talking variegated, primary colour pops of spandrel panels...)
Reply With Quote
     
     
  #1410  
Old Posted Apr 28, 2016, 7:45 PM
movebyleap movebyleap is offline
Registered User
 
Join Date: Aug 2007
Posts: 317
And it's a WIN for Condoland!

Sigh.
Reply With Quote
     
     
  #1411  
Old Posted Apr 28, 2016, 7:51 PM
phil235's Avatar
phil235 phil235 is offline
Registered User
 
Join Date: Sep 2006
Location: Ottawa
Posts: 4,577
Quote:
Originally Posted by AndyMEng View Post
Everything you're saying is correct. This is the wise choice. I do look forward to going to a Sens game in the near future without sitting in traffic.

Its also the practical choice, the safe bet, the least to make waves, and kinda boring. Hope you like Milestones, Kelsey's, and Jack Astors for your non-hockey entertainment, because that's all we're gonna get here!

Also, my last bone to pick is the architecture. It's yawn-tastic and a group of square glass towers lacks imagination. Can we not get some interesting architecture going on here? (And I'm not talking variegated, primary colour pops of spandrel panels...)
I think you're absolutely right about the type of tenant that will be part of this. But that would have been the case with either bid (somehow the detractors seem to forget the 2500 condo units included in the Devcore proposal). Not sure it is avoidable in a mega project.

As for the architecture, I wouldn't get too worked up about renderings. Those are likely to change 15 or 20 times before this is all built. What I like about the bid is that its buildings are oriented towards walkways along the canal, and that the street grid is maintained and enhanced with plazas. That ensures that it will be full of people day and night. The same can't be said about a nature walk and museum row.
Reply With Quote
     
     
  #1412  
Old Posted Apr 28, 2016, 7:52 PM
McC's Avatar
McC McC is offline
Registered User
 
Join Date: Apr 2010
Posts: 3,057
Quote:
Originally Posted by movebyleap View Post
And it's a WIN for Condoland!
RV was the consortium that had CCOC involved, so there will be a mix of market and subsidized rental housing, too.
Reply With Quote
     
     
  #1413  
Old Posted Apr 28, 2016, 7:54 PM
McC's Avatar
McC McC is offline
Registered User
 
Join Date: Apr 2010
Posts: 3,057
Quote:
Originally Posted by phil235 View Post
What I like about the bid is that its buildings are oriented towards walkways along the canal, and that the street grid is maintained and enhanced with plazas. That ensures that it will be full of people day and night.
all this, and the subway, which Mark Kristmanson seems to have highlighted as a clincher in his remarks afterwards.
Reply With Quote
     
     
  #1414  
Old Posted Apr 28, 2016, 8:24 PM
silvergate's Avatar
silvergate silvergate is offline
Registered User
 
Join Date: Apr 2014
Location: Ottawa
Posts: 629
Quote:
Originally Posted by AndyMEng View Post
Everything you're saying is correct. This is the wise choice. I do look forward to going to a Sens game in the near future without sitting in traffic.

Its also the practical choice, the safe bet, the least to make waves, and kinda boring. Hope you like Milestones, Kelsey's, and Jack Astors for your non-hockey entertainment, because that's all we're gonna get here!

Also, my last bone to pick is the architecture. It's yawn-tastic and a group of square glass towers lacks imagination. Can we not get some interesting architecture going on here? (And I'm not talking variegated, primary colour pops of spandrel panels...)
The thing about these major developments is that only establishes brands can afford to either take the risk or pay the price to enter. However, the RendezVous proposal was built on more solid urban design principles, which gives it a lot more room for organic growth after the fact. Unlike the Devcore one, which essentially closed off half the site with entertainment, allowing no human development on the north end.
Reply With Quote
     
     
  #1415  
Old Posted Apr 28, 2016, 8:39 PM
FutureWickedCity's Avatar
FutureWickedCity FutureWickedCity is offline
Registered User
 
Join Date: Mar 2016
Posts: 336
So disappointing but predictable. NCC has a chance to do something exciting but they end up going with the most generic option. Whether this is better than nothing remains to be seen.
Reply With Quote
     
     
  #1416  
Old Posted Apr 28, 2016, 8:57 PM
McC's Avatar
McC McC is offline
Registered User
 
Join Date: Apr 2010
Posts: 3,057
I don't find RV's proposals for the aqueduct or the subway generic at all. I've never understood the black and white views some express about one or the other of the two proposals. Both have merits and problems. The panel considered them carefully, and if you haven't already, you really should read a summary of their findings. Basically they felt that DCDLS's plan was too segmented between a public top and a private bottom, with too little integration or flow between them (not least of all because of the exposed rail line), and they had big concerns about the viability and sustainability of many of the DCDLS proposal's "most exciting" features.
Reply With Quote
     
     
  #1417  
Old Posted Apr 28, 2016, 9:17 PM
acottawa acottawa is offline
Registered User
 
Join Date: Aug 2009
Posts: 18,832
Quote:
Originally Posted by McC View Post
and they had big concerns about the viability and sustainability of many of the DCDLS proposal's "most exciting" features.
I think that was a lot of it. They sort of treated it like a student competition "hey, an aquarium would be cool" rather than a business proposal "here is our plan to build an aquarium, here is how we're going to pay for it, etc"

Overall, I think they made the most rational choice. An arena in 2021 with a clear user will do a lot to bring life to the area (and to central Ottawa in general). The housing (even if it takes a while) will help to make sure the area is lively when the arena is not in use.

Maybe some of the Devcore proposals will find there way to other sites around the region.
Reply With Quote
     
     
  #1418  
Old Posted Apr 28, 2016, 9:31 PM
zzptichka zzptichka is offline
Registered User
 
Join Date: Dec 2015
Location: Outaouias
Posts: 2,361
Quote:
Originally Posted by FutureWickedCity View Post
So disappointing but predictable. NCC has a chance to do something exciting but they end up going with the most generic option. Whether this is better than nothing remains to be seen.
What's exciting in DCDLS proposal? All their attractions seemed like just a product of brain storming exercise without anything to back them up. From car museum and aquarium to hockey arena. Literally everything.
Classic bait-and-switch.
Looking forward to NCC negotiations with Rendevouz. Good start but there is a lot of room for improvement.
Reply With Quote
     
     
  #1419  
Old Posted Apr 28, 2016, 10:04 PM
passwordisnt123 passwordisnt123 is offline
Registered User
 
Join Date: Mar 2015
Location: Ottawa (Centretown)
Posts: 643
Quote:
Originally Posted by AndyMEng View Post
Everything you're saying is correct. This is the wise choice. I do look forward to going to a Sens game in the near future without sitting in traffic.

Its also the practical choice, the safe bet, the least to make waves, and kinda boring. Hope you like Milestones, Kelsey's, and Jack Astors for your non-hockey entertainment, because that's all we're gonna get here!

Also, my last bone to pick is the architecture. It's yawn-tastic and a group of square glass towers lacks imagination. Can we not get some interesting architecture going on here? (And I'm not talking variegated, primary colour pops of spandrel panels...)
I agree, the architecture on the condo side of things for the Rendezvous bid is weak and bland. But, do you remember what the architecture for the condos on the Devcore bid looked like? Yikes, it was worse. Hopefully these are the kinds of things that can be ironed out in the negotiations. The last thing we need is another Union du Canada Redevelopment.
Reply With Quote
     
     
  #1420  
Old Posted Apr 28, 2016, 11:08 PM
rocketphish's Avatar
rocketphish rocketphish is online now
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,548
Melnyk’s RendezVous LeBreton bid preferred choice for Flats redevelopment

Don Butler, Ottawa Citizen
Published on: April 28, 2016 | Last Updated: April 28, 2016 6:46 PM EDT


The plan from Eugene Melnyk’s RendezVous LeBreton team has emerged as the highest ranked of two competing proposals for the redevelopment of 21.6 hectares of vacant land on LeBreton Flats.

The team, led by the Senators’ owner and John Ruddy, president of Trinity developments, received the most points during an evaluation by a high-powered committee chaired by the National Capital Commission’s head of planning, Stephen Willis.

The competing proposal, from the Devore Canderel DLS Group, was rated lower but will remain in contention as a second choice.

The results were revealed during a presentation Thursday afternoon to the NCC’s board of directors.

The sprawling property just west of Ottawa’s downtown core has been largely vacant since the federal government expropriated the lands and demolished the buildings on it in the 1960s.

After half a century of tire spinning, moving ahead with its redevelopment has been a top priority of NCC chief executive Mark Kristmanson.

In 2014, the NCC invited private sector proponents to submit ideas for the development of the LeBreton land, built around an anchor use of national and international significance.

Ultimately, only two teams developed full-fledged development plans: RendezVous LeBreton and the Devcore Canderel DLS Group.

The latter has the backing of three billionaires: Power Corp. president André Desmarais, Guy Laliberté, founder of Cirque du Soleil, and William Sinclair, co-founder and former president of JDS Uniphase.

The two teams presented their plans at an open house on Jan. 27. Both include an arena, a central library and extensive residential, commercial and retail elements.

The Devcore Canderel DLS plan is full of flash and pizzazz, featuring an aquarium, a planetarium, several museums, a skate park and a skydiving attraction.

RendezVous LeBreton’s plan focuses on a new downtown arena that would house Melnyk’s Senators and major events. It also includes a restored “heritage aqueduct” lined with shops and cafes and an Abilities Centre catering to disabled and able-bodied athletes.

The five-member evaluation committee, which included also architect A.J. Diamond, planner Mark Conway, NCC chief executive Mark Kristmanson, spent about two months rating the competing proposals on a dozen different criteria.

http://ottawacitizen.com/news/local-news/ncc-announces-top-choice-for-lebreton-flats-redevelopment
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Downtown & Urban Ottawa
Forum Jump



Forum Jump


All times are GMT. The time now is 6:51 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.