HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Downtown & Urban Ottawa


Reply

 
Thread Tools Display Modes
     
     
  #1401  
Old Posted Sep 18, 2023, 1:14 PM
SL123 SL123 is offline
Registered User
 
Join Date: Mar 2021
Posts: 1,947
Quote:
Originally Posted by OTSkyline View Post
How many floors is it supposed to me? Is it almost "topped out"?
According to the construction update from the 7th of Sept, its a 5 story building
Quote:

Work continues to progress well on Ādisōke. Over the last few weeks, several concrete pours took place. The fourth floor was recently completed, and work on the fifth and final floor is underway.
https://inspire555.ca/construction-updates/
Reply With Quote
     
     
  #1402  
Old Posted Sep 18, 2023, 1:16 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,844
Quote:
Originally Posted by OTSkyline View Post
How many floors is it supposed to me? Is it almost "topped out"?
The building will be 5 floors, and look like 6 from the back side. Top floor will be double+ height. So maybe another 30% height before it's topped-out.
Reply With Quote
     
     
  #1403  
Old Posted Sep 22, 2023, 7:12 PM
Veggie's Avatar
Veggie Veggie is offline
Registered User
 
Join Date: Jul 2020
Location: Ottawa
Posts: 26
Last night:



Reply With Quote
     
     
  #1404  
Old Posted Sep 24, 2023, 11:48 PM
zzptichka zzptichka is offline
Registered User
 
Join Date: Dec 2015
Location: Outaouias
Posts: 2,367



Reply With Quote
     
     
  #1405  
Old Posted Sep 25, 2023, 5:03 PM
Davis137's Avatar
Davis137 Davis137 is offline
Registered User
 
Join Date: Aug 2008
Posts: 2,363
That building gets more interesting by the day...thanks to those of you getting pictures of it as it gets built!
Reply With Quote
     
     
  #1406  
Old Posted Sep 25, 2023, 5:06 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,844
Final floor slab is pretty much complete. Just the roof left. Can't wait to see the impact in its full scale.
Reply With Quote
     
     
  #1407  
Old Posted Sep 29, 2023, 12:58 AM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,584
A photo from this afternoon. It looks like the roof structure has begun.



Photo by me
Sept 28, 2023
Reply With Quote
     
     
  #1408  
Old Posted Oct 1, 2023, 10:37 PM
harls's Avatar
harls harls is offline
Mooderator
 
Join Date: Jan 2002
Location: Aylmer, Québec
Posts: 21,408
1 oct. 2023

Reply With Quote
     
     
  #1409  
Old Posted Oct 2, 2023, 8:41 PM
YukonLlama YukonLlama is offline
Registered User
 
Join Date: Mar 2022
Posts: 155
Quote:
Originally Posted by harls View Post
Really great shot. Imagine how much more imposing this is going to be once more of the details come in. So excited.
Reply With Quote
     
     
  #1410  
Old Posted Oct 7, 2023, 3:46 PM
Harley613's Avatar
Harley613 Harley613 is offline
Registered User
 
Join Date: Jun 2009
Location: Aylmer, QC
Posts: 6,887
__________________
Instagram: https://www.instagram.com/the.harleydavis/
Reply With Quote
     
     
  #1411  
Old Posted Oct 7, 2023, 5:53 PM
zzptichka zzptichka is offline
Registered User
 
Join Date: Dec 2015
Location: Outaouias
Posts: 2,367
If they can do something about Commissioner Street, that'd be great.

Reply With Quote
     
     
  #1412  
Old Posted Oct 8, 2023, 2:58 PM
urbanforest urbanforest is offline
Registered User
 
Join Date: Mar 2023
Posts: 324
Quote:
Originally Posted by zzptichka View Post
If they can do something about Commissioner Street, that'd be great.

Something like rip it (and the river-side parking lot) out and make all of that green space into a large continuous park (with a couple of small bistros, please). The downtown core could be bookended with Major’s Hill Park and this.
Reply With Quote
     
     
  #1413  
Old Posted Oct 10, 2023, 2:33 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,844
Hoping the steel roof goes up quickly. Can't wait to see it topped-out.
Reply With Quote
     
     
  #1414  
Old Posted Oct 16, 2023, 4:50 PM
Badyouken's Avatar
Badyouken Badyouken is offline
Registered User
 
Join Date: Feb 2016
Posts: 239
It's growing quickly, I think I'll go take a look at it tonight again.
Reply With Quote
     
     
  #1415  
Old Posted Oct 16, 2023, 4:59 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,844
Quote:
Originally Posted by Badyouken View Post
It's growing quickly, I think I'll go take a look at it tonight again.
Hoping the steel structure of the roof is done by now.
Reply With Quote
     
     
  #1416  
Old Posted Oct 16, 2023, 5:44 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,844
Quote:
On Wednesday, October 18, adisoke.ca will have a new look and feel, as we unveil our official branding.
https://inspire555.ca/updates/watch-this-space/
Reply With Quote
     
     
  #1417  
Old Posted Oct 18, 2023, 8:03 PM
Harley613's Avatar
Harley613 Harley613 is offline
Registered User
 
Join Date: Jun 2009
Location: Aylmer, QC
Posts: 6,887
__________________
Instagram: https://www.instagram.com/the.harleydavis/
Reply With Quote
     
     
  #1418  
Old Posted Oct 18, 2023, 8:06 PM
Harley613's Avatar
Harley613 Harley613 is offline
Registered User
 
Join Date: Jun 2009
Location: Aylmer, QC
Posts: 6,887
https://adisoke.ca/

The new website is awesome so far. I'm really looking forward to hanging out at this enormous homeless shelter, especially the fifth floor!
__________________
Instagram: https://www.instagram.com/the.harleydavis/
Reply With Quote
     
     
  #1419  
Old Posted Oct 18, 2023, 11:38 PM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,584
Concrete 'skeleton' of Ottawa's future main library now complete
Library on LeBreton Flats, known as Ādisōke, scheduled to open in 2026

Arthur White-Crummey · CBC News
Posted: Oct 18, 2023 5:22 PM EDT | Last Updated: 2 hours ago




It's taken three years of work and 17,000 cubic metres of concrete, but Frank Santostefano is seeing an idea become reality on LeBreton Flats.

"I've been here since day one, when it was just a parking lot, so it's fun to see all the hard work and the planning, the design, coming to fruition," he said.

"You can really start to appreciate the unique shape of the building."

Wednesday was a momentous day for Sanstefano and his fellow workers at PCL Construction. The final suspended concrete slabs are now poured for the Ādisōke project, which will house Ottawa Public Library's main branch and the Library and Archives of Canada.

Santostefano and PCL crews were removing temporary posts as members of council, First Nations leaders and various dignitaries descended on the site in two OC Transpo buses to sign a piece of structural steel in celebration of the milestone.

Crews will soon begin work on the branching steel columns that will hold up the roof. They will also start closing in the building's envelope and facade.

Ottawa Mayor Mark Sutcliffe said Ādisōke will be a "state-of-the-art, world-class facility" and one of the city's most meaningful assets.

"So far it's looked a little bit like the shell, the skeleton of the building," he added. "But we will soon see construction begin on the iconic curved roof of our new library."

The timeline for Ādisōke has been pushed back once before, but Sutcliffe said the project is still set to finish in 2026.

In 2021, the budget almost doubled from $175 million to $334 million. Sutcliffe said he's heard nothing to indicate it will grow further.

"As far as I know, that's the last update I had: that everything's progressing smoothly," he said.

Santostefano said workers on the site feel a special sense of responsibility to get every detail of the design right, given what Ādisōke represents.

"This building is very significant, especially to the Indigenous people of this area," said Santostefano.

"Ādisōke" means "storytelling" in the Anishinābemowin Algonquin language. The name and the design grew out of collaboration with nearby First Nations Kitigan Zibi Anishinabeg, as well as Algonquins of Pikwakanagan, whose chief came to the site to mark the milestone on Wednesday.

Chief Greg Sarazin said it means a lot to see Indigenous input taking physical shape on the site.

"This is a part of Algonquin territory — the heart of Algonquin territory — and it's time that we played a significant part not only in the daily life of the City of Ottawa, but also in the future," he said.

"Having an input into Ādisōke, into the design and the development every step of the way, is a significant improvement of showing that Algonquin people are here and we will be here on a continuing basis."

Frankie Cote, a band councillor from Kitigan Zibi, called the Ādisōke project a small but important step toward reconciliation.

"I've lived in this city since the mid-90s and I've never seen myself in the city," he said. "Now we're starting to see ourselves."

https://www.cbc.ca/news/canada/ottawa/co...ture-main-library-now-complete-1.7000371
Reply With Quote
     
     
  #1420  
Old Posted Oct 19, 2023, 10:37 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,844
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Downtown & Urban Ottawa
Forum Jump



Forum Jump


All times are GMT. The time now is 8:33 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.