  #1381  
Old Posted Aug 24, 2021, 3:22 AM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,725
Where can you sit down?
Reply With Quote
     
     
  #1382  
Old Posted Aug 24, 2021, 3:44 AM
phil235's Avatar
phil235 phil235 is offline
Registered User
 
Join Date: Sep 2006
Location: Ottawa
Posts: 4,544
Quote:
Originally Posted by lrt's friend View Post
Where can you sit down?
Those structures you see on the right are benches all along the water.
Reply With Quote
     
     
  #1383  
Old Posted Aug 24, 2021, 12:19 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,354
Reply With Quote
     
     
  #1384  
Old Posted Aug 24, 2021, 12:35 PM
bartlebooth bartlebooth is offline
Registered User
 
Join Date: Dec 2010
Posts: 479
Quote:
Originally Posted by J.OT13 View Post
Based on what I can see in that single image, it's disappointing. Especially given its location along the river. Will wait until we see more before I freak out too much.
Reply With Quote
     
     
  #1385  
Old Posted Aug 24, 2021, 12:56 PM
OTownandDown OTownandDown is offline
Registered User
 
Join Date: Jul 2018
Posts: 1,606
Ya'll need to go take a visit to the site to review the park, answer all your questions.

I'll be happy when the wide and well designed bridge to the war museum FINALLY opens.

The rail/fence and frame for the benches is actually constructed of 100% galvanized steel, which is a refreshing change to the less durable alternatives.

Just to the left of the photo where you want to jump into the water, there's a fast-flowing channel with vertical concrete walls. This leads to a long 200m++ tunnel which ends at a turbine.

At least if you got sucked into the channel to the right of this park, you'd be stuck to a grate and your body would be visible. On the left you'll be in a dark tunnel.
Reply With Quote
     
     
  #1386  
Old Posted Aug 24, 2021, 12:57 PM
SL123 SL123 is offline
Registered User
 
Join Date: Mar 2021
Posts: 1,920
Quote:
Originally Posted by J.OT13 View Post
Zibi needs towers with townhouse podium like Vancouver not a large obstructing wall. This is such a disappointing rendering
Reply With Quote
     
     
  #1387  
Old Posted Aug 24, 2021, 1:03 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,354
I prefer the current O2 design to the O1, but it does need some work. If the ground floor is all retail, we should have a good, active street (eventually, when retail moves in). They did build townhomes at the base of Kanaal, facing the, well, canal/inlet. I assume the Head Square facing facade will be retail from what I can see.
Reply With Quote
     
     
  #1388  
Old Posted Aug 24, 2021, 2:24 PM
zzptichka zzptichka is offline
Registered User
 
Join Date: Dec 2015
Location: Outaouias
Posts: 2,345
Too high. Too slow. After 5 years they only have one building with people living in it on the Hull side. They need to add like 20 more. At this pace, they'll finish their plan by 2100.

Last edited by zzptichka; Aug 24, 2021 at 3:39 PM.
Reply With Quote
     
     
  #1389  
Old Posted Aug 24, 2021, 3:28 PM
Harley613's Avatar
Harley613 Harley613 is offline
Registered User
 
Join Date: Jun 2009
Location: Aylmer, QC
Posts: 6,878
Quote:
Originally Posted by J.OT13 View Post
What I like:
*It's not the standard Neuf/Roderick Lazy colour scheme, which is good because I assume this is Neuf. Any time these lazy firms diverge from the Charcoal/White is a welcome change.

What I don't like:
*Underwhelming architecture, it looks like a commie block with a modern addition
*Wide and tall, it will obstruct the views from the bottom half of the taller buildings planned to be built behind it.
__________________
Instagram: https://www.instagram.com/the.harleydavis/
Reply With Quote
     
     
  #1390  
Old Posted Aug 24, 2021, 3:55 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,354
Quote:
Originally Posted by J.OT13 View Post
Reply With Quote
     
     
  #1391  
Old Posted Aug 24, 2021, 3:57 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,354
From RailFans Discord:





Reply With Quote
     
     
  #1392  
Old Posted Aug 30, 2021, 3:48 PM
waterloowarrior's Avatar
waterloowarrior waterloowarrior is offline
National Capital Region
 
Join Date: Nov 2005
Location: Eastern Ontario
Posts: 9,253
https://renx.ca/dream-acquire-100-huge-ottawa-zibi-development/

Dream acquires 100% of huge Ottawa Zibi development
Leo Valiquette
Residential Commercial Aug. 30, 2021

The “Dream team” behind what is arguably the largest and most complex waterfront redevelopment in Canada has taken full ownership as the multi-billion-dollar project continues to unfold in the National Capital Region.

In its Q2 report, Dream Impact Trust reported that it, along with Dream Asset Management Corp. (DAM), had acquired the remaining third-party interest in the 34-acre Zibi redevelopment which spans property along the Ottawa River in the cities of Ottawa and Gatineau.

Ownership of the share will be split 50/50. The purchase was settled with a cash payment of $9.1 million and a promissory note with a face value of $5.5 million.

The seller is Theia Partners, which counts among its principals Ottawa’s Jeff Westeinde. For years, he has been Zibi’s public face, well known as an active investor and entrepreneur with a strong focus on sustainability and cleantech in real estate. He continues to serve as president of Zibi Canada.

Transition to income asset
“My role is largely unchanged,” Westeinde told RENX. “Theia continues to work with its partners at Zibi on high-level strategy onsite, leading the sustainability file and community engagement.”

For Zibi’s syndicate of investors, the long-term plan has always been for it to become an income-generating development. Serving as an asset management firm is much more in Dream’s wheelhouse than it is for Theia, Westeinde said.

“Now is as good a time as any,” he said of the sale. “My confidence in the team at Dream to continue to take Zibi in the right direction is huge.”

Zibi remains on track for a completion date in 2032.

“I think we’ve got the best project and development team in the region,” said Gordon Wadley, COO of Dream Office REIT. “They have worked really hard through COVID to mitigate any risks or delays.” But while 2032 remains the target date, “we are not holding ourselves to that,” he added. “We want to do it right.”

Zibi a complex development
Just getting the redevelopment off the ground took years, thanks to a complex tangle of political, environmental and historical considerations.

Zibi includes shoreline and islands in two provinces (Ontario and Quebec) and two cities, on land that is sacred to Algonquin First Nations (Zibi is the Algonquin Anishinabe word for river).

A Crown corporation, the National Capital Commission, is also a major stakeholder.

“Zibi goes way beyond bricks-and-mortar development,” Wadley said. “Sustainability, climate resilience and social equality have never been more front and centre at the forefront of society. These have always been our key pillars.”

Zero-carbon affordable housing
In pursuit of that, Canada Mortgage and Housing Corp. (CHMC) announced in July a $70-millon investment for Zibi. Of that amount, $60 million will be used to construct Zibi Block 10. This 15-storey building will provide Gatineau with 162 new units of much-needed rental housing.

The balance will be applied to connect 200 affordable housing units to the region’s first zero-carbon District Energy System (ZCU).

The ZCU relies on post-industrial waste energy for heating, and the Ottawa River for cooling. So, Zibi will not only include affordable housing, but also, affordable housing that sets a new standard for sustainability and carbon reduction.

Zibi checks all the boxes
All this ties in with Zibi’s goal to adhere to all 10 principles of the One Planet Living framework developed by Bioregional and the World Wildlife Fund. These principles include eliminating greenhouse gas-emitting energy sources and encouraging social equity.

Wadley and Westeinde said it’s important that Zibi embody these principles and also serve as a living example to educate. Block 10 will also include, on its ground floor, an education centre ideal for anyone from engineering and urban planning students to the general public.

“I am picturing throngs of students coming and spending the afternoon to learn a little about the site,” Wadley said. “That’s something which we couldn’t be more proud of.”

What’s next at Zibi?
Six of Zibi’s 44 planned buildings, which comprise commercial and residential space, are expected to be occupied by the end of 2021. One of these is the eight-storey, 158,000-square-foot class-A office building on East Chaudiere Island which has the federal government as the anchor tenant.

Other buildings currently under development and predevelopment include:

– Block 10: 162 residential units in Gatineau. This is the 15-storey building which includes financing from the July CMHC announcement, at the corner of Eddy Street and Rue Jos Montferrand.

– Block 11: 149 residential units, 11 storeys, in Gatineau on Rue Jos Montferrand, where development started earlier this month.

– Block 206: 207 residential units, 25 storeys, started this past spring on West Chaudiere Island, with delivery in Q2 2023.

– Block 207: 80,000 square feet of commercial class-A, seven storeys, started in conjunction with Block 206 (West Chaudiere Island), for delivery in Q2 2023.

– Block 210: a 30,000-square-foot heritage structure bricks-and-beam retrofit that Wadley says is unmatched in the region. It’s located on Albert Island, adjacent to the Canadian War Museum.

– Block 7: “Shovel Ready” upon sufficient preleasing (160,000 square feet of commercial), this six-storey mixed use also includes retail at grade. Located in Gatineau at the corner of Rue Laurier and Jos Montferrand. This one has the short 24-month lead time upon leasing commitments. Wadley said approvals are in place and site work has begun to achieve that shorter lead time.

The development timelines for the Block 207, Block 7 and Block 210 commercial buildings require preleasing commitments. For these buildings, Wadley said the dates are estimates and active discussions are underway with prospective tenants.
Reply With Quote
     
     
  #1394  
Old Posted Sep 1, 2021, 12:47 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,354
Some great shots as always Harley!
Reply With Quote
     
     
  #1395  
Old Posted Sep 1, 2021, 1:12 PM
Dzingle Bells Dzingle Bells is offline
Registered User
 
Join Date: Feb 2019
Posts: 158
Harley you should start an Instagram or Twitter account for these images. I'm always worried I'm going to miss some on here!
Reply With Quote
     
     
  #1396  
Old Posted Sep 1, 2021, 1:29 PM
SL123 SL123 is offline
Registered User
 
Join Date: Mar 2021
Posts: 1,920
Looks like hydro Ottawa finally cleaned up the mess of weeds overgrowing everything else in the park next to the fall and added mulch.
Reply With Quote
     
     
  #1397  
Old Posted Sep 1, 2021, 1:32 PM
zzptichka zzptichka is offline
Registered User
 
Join Date: Dec 2015
Location: Outaouias
Posts: 2,345
Nice shots.
Any word when they are opening up the new park? Supposed to open in "Summer 2021". Wonder if they are aiming for Labour Day.
Reply With Quote
     
     
  #1398  
Old Posted Sep 1, 2021, 1:39 PM
SL123 SL123 is offline
Registered User
 
Join Date: Mar 2021
Posts: 1,920
Just noticed that they paved Head Street Square over the summer, Looks good
Reply With Quote
     
     
  #1399  
Old Posted Sep 1, 2021, 2:10 PM
kevinbottawa kevinbottawa is offline
Registered User
 
Join Date: May 2010
Location: Toronto
Posts: 2,251
Quote:
Originally Posted by SL123 View Post
Just noticed that they paved Head Street Square over the summer, Looks good
I noticed that too. It looks really good, especially with the pattern. It looks different than any other public space in the city.
Reply With Quote
     
     
  #1400  
Old Posted Sep 1, 2021, 2:50 PM
zzptichka zzptichka is offline
Registered User
 
Join Date: Dec 2015
Location: Outaouias
Posts: 2,345
What's their plan for Head street square? I recall there will be some kind of benches on rails?
Seems kind of empty...
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Downtown & Urban Ottawa
Forum Jump



Forum Jump


All times are GMT. The time now is 10:48 AM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.