HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


Reply

 
Thread Tools Display Modes
     
     
  #121  
Old Posted Apr 9, 2025, 7:27 PM
madog222 madog222 is online now
Moderator
 
Join Date: Jan 2014
Posts: 4,095
Reply With Quote
     
     
  #122  
Old Posted May 20, 2025, 3:00 AM
Diegotheartist1's Avatar
Diegotheartist1 Diegotheartist1 is offline
Registered User
 
Join Date: Apr 2021
Location: Vancouver
Posts: 163

Last edited by Diegotheartist1; May 20, 2025 at 8:30 PM.
Reply With Quote
     
     
  #123  
Old Posted May 27, 2025, 9:41 AM
madog222 madog222 is online now
Moderator
 
Join Date: Jan 2014
Posts: 4,095
Reply With Quote
     
     
  #124  
Old Posted Jun 13, 2025, 3:57 PM
madog222 madog222 is online now
Moderator
 
Join Date: Jan 2014
Posts: 4,095
Reply With Quote
     
     
  #125  
Old Posted Jun 13, 2025, 4:17 PM
idunno idunno is offline
Registered User
 
Join Date: Feb 2010
Posts: 938
I can't wait to start saying "Go gantry go!"
Reply With Quote
     
     
  #126  
Old Posted Jul 6, 2025, 6:45 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,553
deleted

Last edited by officedweller; Jul 6, 2025 at 8:41 AM.
Reply With Quote
     
     
  #127  
Old Posted Jul 6, 2025, 6:48 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,553
From twitter:

Gantry assembly at Bakerview Station.



https://x.com/SLSkyTrain/status/1940878275070362005

Last edited by officedweller; Jul 6, 2025 at 8:41 AM.
Reply With Quote
     
     
  #128  
Old Posted Jul 6, 2025, 11:09 AM
Metro-One's Avatar
Metro-One Metro-One is online now
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 17,922
I love watching the gantry cranes move along! And this will be 16 km of gantry crane fun!
__________________
Bridging the Gap
Check out my Flickr: https://www.flickr.com/photos/30634635@N03/with/29495547810/ and Youtube channel https://www.youtube.com/channel/UCV0_0h9qKlhxXFxuAey_q6Q
Reply With Quote
     
     
  #129  
Old Posted Jul 7, 2025, 3:46 PM
idunno idunno is offline
Registered User
 
Join Date: Feb 2010
Posts: 938
How many gantries did they say there were? 4?
Reply With Quote
     
     
  #130  
Old Posted Jul 8, 2025, 5:58 PM
madog222 madog222 is online now
Moderator
 
Join Date: Jan 2014
Posts: 4,095
Speaking of gantries, they have names now.


https://x.com/SLSkyTrain/status/1942628177123172684/photo/1
Reply With Quote
     
     
  #131  
Old Posted Jul 8, 2025, 8:33 PM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is offline
Registered User
 
Join Date: May 2010
Posts: 4,780
Quote:
Originally Posted by madog222 View Post
Speaking of gantries, they have names now.
I'm always impressed that these gigantic machines they build are merely tools used for the guideway construction.
Reply With Quote
     
     
  #132  
Old Posted Jul 8, 2025, 9:01 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,553
Pics from today's newsletter:


Workers on site at the future Bakerview-166 Street Station during the assembly of the Fleetwood Flyer launching gantry in June.
https://app.webtrackz.com/?q=email/view/14_J7MHX0Dy0oO0T9RrdVKbivIwT5aU9IKAhNF6PhiEb57hgtKGj8GCA


The Fleetwood Flyer launching gantry being assembled at the Bakerview-166 Street Station site.
https://app.webtrackz.com/?q=email/view/14_J7MHX0Dy0oO0T9RrdVKbivIwT5aU9IKAhNF6PhiEb57hgtKGj8GCA


The Fleetwood Flyer at Bakerview-166 Street Station.
https://app.webtrackz.com/?q=email/view/14_J7MHX0Dy0oO0T9RrdVKbivIwT5aU9IKAhNF6PhiEb57hgtKGj8GCA

Quote:
Meet Our Launching Gantries
The names of our launching gantries reflect the communities where they will be working. Fleetwood Flyer, Langley Launcher, Surrey Sprinter and Clayton Clipper will play a large part in constructing the Surrey Langley SkyTrain.

Fleetwood Flyer
The Fleetwood Flyer will begin installing guideway segments at Bakerview–166 Street Station and move west through the Fleetwood community to 152 Street Station.
Fleetwood Flyer will be lifting just over 1,000 guideway segments into place.
Launch date: Scheduled for July 2025

Langley Launcher
The Langley Launcher will begin installing guideway segments at Hillcrest–184 Street Station and move east towards Langley City Centre Station, the last stop on the SLS extension.
This gantry has the biggest workload and will be lifting roughly 1,350 elevated guideway segments into place.
Launch date: Anticipated in July 2025

Surrey Sprinter
The Surrey Sprinter will begin installing guideway segments at 152 Street Station and move west toward King George Station, connecting the current Expo Line to the SLS extension.
This gantry will be responsible for lifting just over 900 elevated guideway segments into place.
Launch date: Anticipated in August 2025

Clayton Clipper
The Clayton Clipper will begin installing guideway segments at Hillcrest–184 Street Station and move west through the Clayton community before finishing its work at Bakerview–166 Street Station.
The Clayton Clipper’s route includes the installation about 1,150 elevated guideway segments.
Launch date: Anticipated in September 2025
https://surreylangleyskytrain.gov.bc.ca/launching-gantries
Reply With Quote
     
     
  #133  
Old Posted Jul 16, 2025, 5:04 PM
surrey surrey is offline
Registered User
 
Join Date: Jan 2025
Posts: 49
Reply With Quote
     
     
  #134  
Old Posted Jul 16, 2025, 7:50 PM
Sheba Sheba is offline
Registered User
 
Join Date: Jan 2015
Location: BC
Posts: 4,587
Quote:
Originally Posted by surrey View Post
Video Link
Reply With Quote
     
     
  #135  
Old Posted Jul 17, 2025, 7:01 PM
Mac Write Mac Write is offline
Registered User
 
Join Date: Dec 2008
Posts: 1,423
Any news on OMC5 (size, site, now trains will get access, etc)
Reply With Quote
     
     
  #136  
Old Posted Jul 17, 2025, 7:23 PM
mcj mcj is offline
Registered User
 
Join Date: Dec 2021
Location: New West
Posts: 1,173
Quote:
Originally Posted by Mac Write View Post
Any news on OMC5 (size, site, now trains will get access, etc)
Location was announced a year ago, it's the parcel south east of the Highway 15 / Fraser Highway interchange. Size is TBD. There's going to be switches and a storage track installed near that location for access, and the alignment shifts to the South of Fraser Highway there to align with the property. There will be a stub track built. Check out this pdf for the alignment.
Reply With Quote
     
     
  #137  
Old Posted Jul 17, 2025, 8:19 PM
madog222 madog222 is online now
Moderator
 
Join Date: Jan 2014
Posts: 4,095
Not yet at the procurement stage so we (and likely 'they') don't know the scope of what will initially be built regarding track capacity.
Currently, construction is anticipated to start 2028.
It's going to be very pricey, north of a billion, with extensive groundwork needed.

Last edited by madog222; Jul 17, 2025 at 8:30 PM.
Reply With Quote
     
     
  #138  
Old Posted Jul 21, 2025, 7:55 PM
Hotwax's Avatar
Hotwax Hotwax is offline
Registered User
 
Join Date: Mar 2011
Location: Metro Vancouver
Posts: 180
July 2025 update from Stainer:

Video Link
Reply With Quote
     
     
  #139  
Old Posted Aug 12, 2025, 1:27 AM
madog222 madog222 is online now
Moderator
 
Join Date: Jan 2014
Posts: 4,095
Project website has been updated with a section for OMC5 ‘ South of Fraser Maintenance and Storage Facility’

https://surreylangleyskytrain.gov.bc.ca/sfmsf/

Preload will start to be placed this fall continuing through late 2026 and will stay in place until early 2029, presumably with construction starting at that time.
Reply With Quote
     
     
  #140  
Old Posted Aug 12, 2025, 4:51 AM
Mac Write Mac Write is offline
Registered User
 
Join Date: Dec 2008
Posts: 1,423
Someone with authority, needs to push construction up to when pre-load is complete. If they can get it finished by 2029/30, then they could use that extra space to re-build OMC1/2 to modernize them and maximize train storage andmaintance capacity.

3 years of having a second OMC free to use could rebuild edmonds to hold more trains and be re-designed from the ground up to be supportive of 5-car trains.

What would a complete rebuild of OMC1 look like and how much capacity improvement could we get out of it?
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 6:18 AM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.