Section of Main Street closed for downtown infrastructure renewal
Intersection of Main and Lutz will be closed to traffic until Sept. 27
Author of the article:Alan Cochrane
Published Aug 13, 2024 • Last updated 50 minutes ago • 4 minute read
https://tj.news/moncton-miramichi/section-of-main-street-closed-for-downtown-infrastructure-renewal (paywall)
This is necessary work to allow for the eventual development of downtown south of Main, including the Ashford/Downing project. All utilities are going underground and the road surface (Lutz) is being elevated to minimize risk of flooding.
Millions of dollars are being spent on this renewal (possibly pissed away if the Sandpiper Lady and the Gang of 34 are victorious).
This snippet about the Gateway Tower proposal at the end of the article was interesting:
Quote:
A group of concerned residents presented a petition calling for a moratorium on the proposed development, saying it is too close to the river on land that is at high risk of flooding.
The city says the final plans have not yet been presented. The proposed new apartment building is scheduled for a presentation to city council on Sept. 3, with a public hearing tentatively set for Oct. 7.
|
So, the public presentation on the Gateway Towers won't be until October 7th. This will give both sides substantial time to marshall their resources for what promises to be an epic battle between the forces of good and evil. It will be like the Battle of Pelennor Fields from LOTR.