Quote:
Originally Posted by madog222
Installing fill up to the new grade? It’s hard to tell but that manhole is possibly installed showing us the level of the new roadway.
Thanks for the pics.
|
Wednesday May 01, 2024, walking to the Fresh St. Market and heard a sound I haven't heard in a couple of weeks. Must check it out.
The build-up to the new road grade continues. (
madog222, you're right, that catch basin is installed and shows the new grade level)
The new road (intersection) to the bridge's off-ramp wont have much of a slope from what I see on the eastside, the westside, we'll see.
• Video Link