HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > United States > Pacific West > Portland > Portland Suburbs and the State of Oregon


Reply

 
Thread Tools Display Modes
     
     
  #121  
Old Posted Sep 15, 2008, 2:54 PM
Northeast79 Northeast79 is offline
Registered User
 
Join Date: May 2007
Location: Salem
Posts: 149
This is not more than a napkin sketch at this point, but it looks like real friendly, pedestrian scale stuff.

I would have liked to see more height - maximize the opportunity.
Reply With Quote
     
     
  #122  
Old Posted Sep 16, 2008, 7:20 PM
Northeast79 Northeast79 is offline
Registered User
 
Join Date: May 2007
Location: Salem
Posts: 149
From Statesmanjournal:

Council extends park negotiation
Developer says deal may be struckwithin 30 days
By Michael Rose • Statesman Journal

September 16, 2008


A deal to redevelop the Marion Parkade — adding 105 apartments and stores as well as student housing and classrooms for Western Oregon State University to the city-owned parking structure — has taken longer than expected to pull together.


But Salem attorney Kevin Lafky, whose Marion Park LLC proposed the idea to the city, said a deal likely will be struck within 30 days.

Salem City Council on Monday agreed to extend the termination date for an exclusive negotiation agreement with Lafky's group from Oct. 3 to Nov. 15. In addition, the termination date could be further extended if all parties agree to it.

And the project could be getting much larger than the $15 million in redevelopment proposed for the first phase.

"I think for total build out, you're looking at a $30- to $35-million redevelopment," Lafky said.

The city and the developer are in the midst of hammering out a long-term lease for the parking structure and other agreements.

In April, the developer said that phase one could be under way as early as September.

Despite the delay, the developer has made significant strides.

WOU President John Minahan said Monday that the university has recently signed a lease with Lafky's group for the downtown site. The school would lease 18 student housing units and 6,500-square-feet of space for classrooms, primarily to serve its international student program.

The Monmouth university is considering placing more of its programs in the redeveloped building. Health care and health-related master level programs, which are growing areas for the school, might be located in Salem, Minahan said. It also seems a natural location for housing student nurses, he said.

Lafky said the project is on a fast track.

"We would really like to get Western Oregon in there for fall term of next year," Lafky said.

The developer's plans call for adding at least four more floors above the existing three-story parking structure. Retail space would be added at the ground level. The developer also would make structural upgrades to the building to bring it up to current seismic standards.

Marion Parkade has 1,060 parking spaces, of which about 100 would be lost as result of the redevelopment. Lafky said the parking garage still would have plenty of room. It is rare to see more than 300 cars parked in the garage, he said.

The developer has indicated that might it apply for a 10-year property tax abatement on the housing portion of the project, but it has not requested loans or other financial assistance from the city, said Sheri Wahgren, business investment manager for urban development.
Reply With Quote
     
     
  #123  
Old Posted Sep 23, 2008, 8:29 PM
Northeast79 Northeast79 is offline
Registered User
 
Join Date: May 2007
Location: Salem
Posts: 149
Construction Update 09_22_08



Reply With Quote
     
     
  #124  
Old Posted Oct 17, 2008, 8:20 PM
360Rich 360Rich is offline
Registered User
 
Join Date: Aug 2006
Location: Vantucky
Posts: 256
Taking the old, making it new
Retrofitting iQ Credit Union’s new headquarters breathes life into a former city building

BY CHARITY THOMPSON of the VBJ
October 17th, 2008

Vancouver-based iQ Credit Union had plenty of options for developing its new headquarters. But when a city building that once housed a bank in downtown Vancouver became available, iQ put that option on the top of its list.

There was just one catch. The four-story building at 13th and Main streets required extensive renovation, structurally and aesthetically. Enough that, save the concrete structure and an elevator, iQ will move into a brand-new building when renovations are complete in spring 2009.

The choice to retrofit

Early on, iQ formed a team to determine the best plan for building a new headquarters, including consultants from Seattle-based EHS Design, Team Construction and real estate firm Eric Fuller and Assoc. Inc., both of Vancouver.

“We went through an extensive due diligence process with iQ and looked at a variety of options – new buildings, renovation and (the cost to) move or not move,” said Curtis Bales, the project’s manager and design lead at EHS.

“When (iQ) saw this building available as an option they really jumped at it. To them, it had the downtown presence and that history.”

The group’s research found that renovation – particularly of a building purchased from city government – could be cost-effective and have a shorter project timeline than starting from scratch.

“It can be more expensive to build new than to retrofit,” Bales said. “For instance, in this case there was a savings in the site development cost as well as the basic building structure. It allowed the credit union to hit the ground running by utilizing this existing building as a starting point.”

Due diligence cost about $3 million and meant accounting for costs of working with city right-of-way requirements like historic trees or sidewalk widths, and preparing to handle surprises in the building, such as structural elements that didn’t always match the original architectural drawings.

“A renovation like this reinforces our understanding that extensive front-end work is really important so at the end of the day, (iQ’s) expectations are realized,” said Brett Conway, EHS partner in charge of the project. “Due diligence is not a one-week thing.”

In total, the project will cost $7.5 million, including the property acquisition. The credit union’s current headquarters is in Hazel Dell, but leaders were looking to relocate to an area more accessible to the growth of the business community, said Jim Morrell, iQ’s senior vice president of support services, who manages the project.

iQ’s downtown branch at 601 E. 16th St. will move to the new location upon completion.

A needed makeover

Tim Haldeman, the city’s director of facilities, risk and property services, managed the crew that maintained the building under city ownership. The building was originally a branch of Vancouver-based First Independent, but was bought by the city of Vancouver in the mid-1990s to provide a Citizens Service Center and offices for 110 employees.

“The bones were good, it just needed somebody to come in and give it a new life,” Haldeman said of the building.

Since its construction in the late 1960s, the building had more than its share of daily activity. But by the 1990s, it was clear that it was near the end of its operational life, Haldeman said.

“We just couldn’t cool the building down on hot days because of the computers, (the number of) people and the way the windows were set up,” Haldeman said. “There was no more electrical or IT capacity without installing conduit throughout, and that would mean drilling through three concrete floors.”

The city made it clear that rehabilitation of the building was a priority, Bales said, and seismic improvements were a condition of its sale.

In response, Team Construction added rebar, concrete and Kevlar to the pillars for seismic reinforcement.

The building also had little inside wheelchair access to facilities such as restrooms, which has been eliminated in the new interior layout. And modified sidewalks and cut curbs will provide better wheelchair and pedestrian access.

For increased energy efficiency, the building will have double-paned, glazed windows of insulated glass and up-to-date internal controls for lighting, heating and cooling.

“It’s going to make for a much more comfortable environment,” Bales said. “The new glazing allows much more daylight through than the old tinted glazing, so you’re getting better daylight, better comfort and a better view.”

While the building will be more energy efficient than it was in the past, Morrell said iQ isn’t pursuing green building certifications.

“You don’t get as many points with a retrofit as with building from the ground up,” Morrell said of the rating systems. “The costs of design don’t offset what you get in return with energy savings.”

Changes inside and outside

Inside the credit union’s branch and executive offices, the design will match the iQ branding of its nine branches. That includes the credit union’s signature red roof and awnings, along with a warm color palate of cream, dark brown, green terra cotta and bright accents and aluminum and glass features.

The branch lobby will have a computer workstation for iQ member use. A greeter’s desk on each floor will provide client services and extra security.

Outside, the building’s iQ stamp is on its revolving LED sign, which replaced a fixture that had more than 30 floodlights.

“We totally removed the guts of the sign and replaced them with enormously improved energy efficiency,” Morrell said.

To keep in step with the city’s pedestrian-friendly vision for downtown, the site will include a 25-foot-wide landscaped area, plus a walk-up ATM, bike racks and a plaza with benches.

Historic trees along Main Street will be joined at the site by new trees along Broadway Street.

The lobby’s roof will follow the motif of the neighborhood’s 1960s brick arches, as will the sidewalk canopies.

“The landscape concepts allow for a softer transition between the downtown core and the residential neighborhood to the north,” Conway said.

PRIVATE OWNER, PUBLIC PROCESS

Vancouver-based iQ Credit Union was in an unusual situation when it set out to purchase and renovate a building owned by the city of Vancouver. It meant the building’s former owner also was responsible for review of the project’s design and permits after the sale of the building.

“We’re in the financial institution business, not development, so this has been somewhat of a learning experience for us,” said Jim Morrell, iQ’s senior vice president of support services. “It gives us a better appreciation for what developers have to go through.”

A development in the city’s downtown planning zone must include pedestrian rain coverage, acorn-shaped street lamps, sidewalks at least 15 feet wide and preservation of certain historic elements.

“It’s not just the building itself, it’s the entire block and the street,” Morrell said of elements considered in the project design.

A downtown project also meant getting approval from the city’s Design Review Committee.

“We had really good discussions with (the Design Review Committee) and I would say the process strengthened the design,” said Curtis Bales, the project’s manager and design lead at Seattle-based EHS Design.

Part of that process was integrating modern elements into the building and neighborhood’s 1950s- to 1970s-era design.

“A lot of people dislike (designs of that era) because they’re new in their memory bank, but there are a lot of great examples out there,” Conway said. “We’re trying to leverage the good aspects of that era.”

“We ended up with a building that I think will be a good neighbor to the existing buildings around it,” Bales said. “It’s very modern but relates to the historic buildings of the area.”

Charity Thompson can be reached at [email protected].

http://www.vbjusa.com/stories/2008-10-17/taking_the_old_making_it_new.html

current look


renderings




Reply With Quote
     
     
  #125  
Old Posted Oct 30, 2008, 10:17 PM
Northeast79 Northeast79 is offline
Registered User
 
Join Date: May 2007
Location: Salem
Posts: 149
Construction Update 10_30_08







Reply With Quote
     
     
  #126  
Old Posted Nov 14, 2008, 11:47 PM
Northeast79 Northeast79 is offline
Registered User
 
Join Date: May 2007
Location: Salem
Posts: 149
Construction Update 11_14_08

Almost done,

Reply With Quote
     
     
  #127  
Old Posted Nov 15, 2008, 3:13 AM
pdxman's Avatar
pdxman pdxman is offline
Registered User
 
Join Date: Aug 2006
Location: Portland
Posts: 1,037
Whoa! I had no idea it was getting close to finishing AND that it looks half decent. Thanks for the update
Reply With Quote
     
     
  #128  
Old Posted Nov 15, 2008, 11:24 PM
leftopolis leftopolis is offline
Earthling
 
Join Date: Oct 2003
Location: San José
Posts: 1,360
Nice looking building! I like the curve in particular. What's the deal with the mismatched grey column(around the 4th /5th floor, center/right part of pic)?
As a former Willamette Valley resident, most amazing is the blue sky in November!
Reply With Quote
     
     
  #129  
Old Posted Nov 16, 2008, 6:24 PM
Northeast79 Northeast79 is offline
Registered User
 
Join Date: May 2007
Location: Salem
Posts: 149
Leftopolis, I took several photos and automerged them in photoshop. So, there are a few places where my photos didn't quite match up. I didn't have my wide angle lense so I just took a bunch of 35mm shots.
Reply With Quote
     
     
  #130  
Old Posted Nov 16, 2008, 11:35 PM
leftopolis leftopolis is offline
Earthling
 
Join Date: Oct 2003
Location: San José
Posts: 1,360
Quote:
Originally Posted by Northeast79 View Post
Leftopolis, I took several photos and automerged them in photoshop. So, there are a few places where my photos didn't quite match up. I didn't have my wide angle lense so I just took a bunch of 35mm shots.
Oh! Honestly, I wouldn't have known if you hadn't clarified that for me. I'm glad to hear it's not a fault in the building process! Anyway, thanks for the photo update...i lived in the W. Valley for 7-8 years, and it's great to see the slow but steady vertical transformation.
Reply With Quote
     
     
  #131  
Old Posted Nov 17, 2008, 5:28 AM
zilfondel zilfondel is offline
Submarine de Nucléar
 
Join Date: Mar 2006
Location: Missouri
Posts: 4,481
looks great actually

who's the architect?
Reply With Quote
     
     
  #132  
Old Posted Nov 17, 2008, 8:57 PM
Northeast79 Northeast79 is offline
Registered User
 
Join Date: May 2007
Location: Salem
Posts: 149
the architect is HKS out of Dallas, Texas.
Reply With Quote
     
     
  #133  
Old Posted Nov 19, 2008, 5:07 AM
futuredeveloper futuredeveloper is offline
Registered User
 
Join Date: Nov 2008
Posts: 5
Larry Tokarski and Dan Berrey are building this building and are going to use the third floor as an office for the Boise Cascade property development.

The building itself is hideous and it looks like they just wanted to build it as quickly and as cheaply as possible. It is too bad because that is a really great spot and something really cool could have been built there, possibly with some kind of curved front to go along with the curve in the road.

I hope it ends up getting torn down in the next 5 to 10 years and replaced with something worthwhile.
Reply With Quote
     
     
  #134  
Old Posted Nov 26, 2008, 2:01 AM
CapitalCity's Avatar
CapitalCity CapitalCity is offline
Go Saxons!!
 
Join Date: Mar 2008
Location: Salem, OR & Waynesville, OH
Posts: 293
Wow! Thankis for keeping us updated on all of Salem's developments! I would love to contribute to all you're doing, but sadly, my family moved from Salem to Ohio because of jobs. But I'm trying to keep as updated as possible!
__________________
Salem, Oregon project rundown
Reply With Quote
     
     
  #135  
Old Posted Nov 26, 2008, 2:06 AM
CapitalCity's Avatar
CapitalCity CapitalCity is offline
Go Saxons!!
 
Join Date: Mar 2008
Location: Salem, OR & Waynesville, OH
Posts: 293
^^^ I agree, they need to take advantage of this much space, but a downtown square is something Salem needs to become more appealing.
__________________
Salem, Oregon project rundown
Reply With Quote
     
     
  #136  
Old Posted Nov 26, 2008, 2:08 AM
CapitalCity's Avatar
CapitalCity CapitalCity is offline
Go Saxons!!
 
Join Date: Mar 2008
Location: Salem, OR & Waynesville, OH
Posts: 293
Woah, that's coming up fast!
__________________
Salem, Oregon project rundown
Reply With Quote
     
     
  #137  
Old Posted Nov 26, 2008, 2:10 AM
CapitalCity's Avatar
CapitalCity CapitalCity is offline
Go Saxons!!
 
Join Date: Mar 2008
Location: Salem, OR & Waynesville, OH
Posts: 293
I like how that looks, downtown needs more of these 5-8 floor buildings.
__________________
Salem, Oregon project rundown
Reply With Quote
     
     
  #138  
Old Posted Nov 26, 2008, 2:20 AM
CapitalCity's Avatar
CapitalCity CapitalCity is offline
Go Saxons!!
 
Join Date: Mar 2008
Location: Salem, OR & Waynesville, OH
Posts: 293
Thanks for that info futuredeveloper, my friend and I were walking downtown and we walked by it thinking "what is that?" we hoped that there would at least be a sign on the fence, but it was jsut a mystery building to us.
__________________
Salem, Oregon project rundown
Reply With Quote
     
     
  #139  
Old Posted Nov 26, 2008, 2:22 AM
CapitalCity's Avatar
CapitalCity CapitalCity is offline
Go Saxons!!
 
Join Date: Mar 2008
Location: Salem, OR & Waynesville, OH
Posts: 293
I sure do hope this one comes through.
__________________
Salem, Oregon project rundown
Reply With Quote
     
     
  #140  
Old Posted Nov 26, 2008, 1:47 PM
CapitalCity's Avatar
CapitalCity CapitalCity is offline
Go Saxons!!
 
Join Date: Mar 2008
Location: Salem, OR & Waynesville, OH
Posts: 293
Wow, that looks really great. A lot better than that parking garage that used to be there.
__________________
Salem, Oregon project rundown
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > United States > Pacific West > Portland > Portland Suburbs and the State of Oregon
Forum Jump



Forum Jump


All times are GMT. The time now is 4:08 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.