  #1361  
Old Posted Apr 26, 2016, 9:41 PM
LouisVanDerWright LouisVanDerWright is offline
Registered User
 
Join Date: Jul 2012
Posts: 7,452
Quote:
Originally Posted by nice View Post
It seems the Geotechnical Engineer is getting set up to run its pre-cores for the rock caissons prior to the start of construction.
Soil testing? They already did that didn't they?

http://skyscraperpage.com/forum/show...&postcount=346
Reply With Quote
     
     
  #1362  
Old Posted Apr 29, 2016, 4:39 PM
nice nice is offline
Registered User
 
Join Date: Apr 2016
Posts: 7
Yes they did complete soil borings. However, pre-core's are required for rock socketed caissons so they can define where top of sound rock is located. This process is not completed in the intial soil boring program as typically the design changes and rock caissons may be relocated. Pre-cores need to be taken at the center of each rock socketed caisson to provide better data as previously mentioned. (ie. top of weathered rock / top of sound rock / bottom of socket elevation)
Reply With Quote
     
     
  #1363  
Old Posted Apr 29, 2016, 4:47 PM
harryc's Avatar
harryc harryc is offline
Registered User
 
Join Date: Jun 2007
Location: Oak Park, Il
Posts: 14,989
Quote:
Originally Posted by nice View Post
Yes they did complete soil borings. However, pre-core's are required for rock socketed caissons so they can define where top of sound rock is located. This process is not completed in the intial soil boring program as typically the design changes and rock caissons may be relocated. Pre-cores need to be taken at the center of each rock socketed caisson to provide better data as previously mentioned. (ie. top of weathered rock / top of sound rock / bottom of socket elevation)
Thank you for the explanation.
__________________
Harry C - Urbanize Chicago- My Flickr stream HRC_OakPark
The man who trades freedom for security does not deserve nor will he ever receive either. B Franklin.
Reply With Quote
     
     
  #1364  
Old Posted Apr 29, 2016, 7:21 PM
LouisVanDerWright LouisVanDerWright is offline
Registered User
 
Join Date: Jul 2012
Posts: 7,452
Yeah, thanks, it's amazing how much you learn from this site.
Reply With Quote
     
     
  #1365  
Old Posted Apr 30, 2016, 7:52 PM
spyguy's Avatar
spyguy spyguy is offline
THAT Guy
 
Join Date: Oct 2005
Posts: 5,949
http://contractormag.com/fire-sprink...on-wanda-vista

F.E. Moran Fire Protection to provide fire protection for Wanda Vista

The Wanda Vista is a 1.9 million square foot hotel and condo project in downtown Chicago. F.E. Moran Fire Protection, Northern Illinois (FPN) is excited to announce that they will be providing the fire protection for this building. FPN will provide over 18,000 sprinkler heads, 5 fire pumps, and a 30,000 gallon water tank for 95 floors. The project is set to start in June, 2016 and piping will begin January, 2017.
Reply With Quote
     
     
  #1366  
Old Posted May 1, 2016, 1:51 AM
BVictor1's Avatar
BVictor1 BVictor1 is offline
Registered User
 
Join Date: Sep 2002
Location: Chicago
Posts: 10,447
I had an opportunity to visit the sales center this morning. It's pretty cool.

I was told that hopefully foundation work will begin in July.

Apparently the building is 95 floors above upper Wacker Drive. The duplex penthouse is 92-93 and is gong for $18,000,000.

I tried to find out exactly how many units had been sold, and they're kind of mum on that, but it was mentioned to pay attention to 'Redfin', which I know people have posted here. Anything that's red and pending is a contract signed. Seeing as there are 406 condos, I guess one could make the calculations by counting the pending.

The hotel room count continues to fluctuate.

Funnily enough, the people in the sales center are aware of this site I was speaking to an associate and she said yea, I follow SSP...

This forum has made quite the impact over the years and I'm proud to be a part of it and to know many of you.
__________________
titanic1
Reply With Quote
     
     
  #1367  
Old Posted May 1, 2016, 2:24 AM
Kngkyle Kngkyle is offline
Registered User
 
Join Date: Jul 2006
Location: Chicago
Posts: 3,108
Quote:
Originally Posted by BVictor1 View Post
I had an opportunity to visit the sales center this morning. It's pretty cool.

I was told that hopefully foundation work will begin in July.

Apparently the building is 95 floors above upper Wacker Drive. The duplex penthouse is 92-93 and is gong for $18,000,000.

I tried to find out exactly how many units had been sold, and they're kind of mum on that, but it was mentioned to pay attention to 'Redfin', which I know people have posted here. Anything that's red and pending is a contract signed. Seeing as there are 406 condos, I guess one could make the calculations by counting the pending.

The hotel room count continues to fluctuate.

Funnily enough, the people in the sales center are aware of this site I was speaking to an associate and she said yea, I follow SSP...

This forum has made quite the impact over the years and I'm proud to be a part of it and to know many of you.
I walk by the sales center a few times a week... maybe I'll pop in sometime.

As far as Redfin goes, there are currently 85 units listed and all but 9 of them are under contract/pending. Since there are 406 condos total not just the 85 on Redfin, it's impossible to really tell much from this. There are 5 of the $10m full-floor units listed and 4 of them say pending.
https://www.redfin.com/city/29470/IL...1696:-87.61865
Reply With Quote
     
     
  #1368  
Old Posted May 1, 2016, 2:42 AM
the urban politician the urban politician is offline
The City
 
Join Date: Jul 2004
Location: Chicago region
Posts: 21,375
^ If 20% of the condos are under contract and the hotel is already locked in, plus a large amount of up front equity from the investors, this thing is probably very close to landing financing.
Reply With Quote
     
     
  #1369  
Old Posted May 1, 2016, 2:29 PM
marothisu marothisu is offline
Registered User
 
Join Date: Dec 2012
Location: Chicago
Posts: 6,892
Quote:
Originally Posted by the urban politician View Post
^ If 20% of the condos are under contract and the hotel is already locked in, plus a large amount of up front equity from the investors, this thing is probably very close to landing financing.
That is just whatever is on Redfin. Someone posted a few months ago that 1/3 of the condos were under contract at the time and had a link.
__________________
Chicago Maps:
* New Construction https://www.google.com/maps/d/viewer...B0&usp=sharing
Reply With Quote
     
     
  #1370  
Old Posted May 2, 2016, 3:16 AM
johneboy96 johneboy96 is offline
Registered User
 
Join Date: Jun 2014
Posts: 24
vista has a new video on their website, has some cool animations

https://player.vimeo.com/video/160120963
Reply With Quote
     
     
  #1371  
Old Posted May 2, 2016, 3:33 AM
BVictor1's Avatar
BVictor1 BVictor1 is offline
Registered User
 
Join Date: Sep 2002
Location: Chicago
Posts: 10,447
Quote:
Originally Posted by johneboy96 View Post
vista has a new video on their website, has some cool animations

https://player.vimeo.com/video/160120963
Same video that's been on the site for the past few weeks.
__________________
titanic1
Reply With Quote
     
     
  #1372  
Old Posted May 2, 2016, 3:42 AM
go go white sox go go white sox is offline
Registered User
 
Join Date: Apr 2015
Posts: 160
Anyone know if they will be constructing up all three base buildings at the same time?
Reply With Quote
     
     
  #1373  
Old Posted May 2, 2016, 1:16 PM
LouisVanDerWright LouisVanDerWright is offline
Registered User
 
Join Date: Jul 2012
Posts: 7,452
Quote:
Originally Posted by go go white sox View Post
Anyone know if they will be constructing up all three base buildings at the same time?
There is no separation, all three stems are one building and structure. It will all rise at once. I also have a feeling this will have to be a double crane project because of how rectangular the footprint is.
Reply With Quote
     
     
  #1374  
Old Posted May 2, 2016, 1:28 PM
jc5680's Avatar
jc5680 jc5680 is offline
Registered User
 
Join Date: Oct 2007
Location: Seattle
Posts: 1,367
Quote:
The Vista Tower is ready to go.

Mayor Rahm Emanuel will announce today that the developers of the 95-story riverside tower designed by Jeanne Gang will break ground soon on the project. At nearly 1,200 feet tall, the high-rise in the Lakeshore East development will be the third-tallest in Chicago.
Crains
Reply With Quote
     
     
  #1375  
Old Posted May 2, 2016, 2:58 PM
maru2501's Avatar
maru2501 maru2501 is offline
Registered User
 
Join Date: Oct 2015
Location: chicago
Posts: 1,668
this will be super fun to watch
Reply With Quote
     
     
  #1376  
Old Posted May 2, 2016, 3:47 PM
BVictor1's Avatar
BVictor1 BVictor1 is offline
Registered User
 
Join Date: Sep 2002
Location: Chicago
Posts: 10,447
Press conference going on right now.
__________________
titanic1
Reply With Quote
     
     
  #1377  
Old Posted May 2, 2016, 6:22 PM
Kngkyle Kngkyle is offline
Registered User
 
Join Date: Jul 2006
Location: Chicago
Posts: 3,108
https://imgur.com/7O0sftz

Further soil testing in progress
Reply With Quote
     
     
  #1378  
Old Posted May 2, 2016, 7:04 PM
harryc's Avatar
harryc harryc is offline
Registered User
 
Join Date: Jun 2007
Location: Oak Park, Il
Posts: 14,989
Good to go

__________________
Harry C - Urbanize Chicago- My Flickr stream HRC_OakPark
The man who trades freedom for security does not deserve nor will he ever receive either. B Franklin.
Reply With Quote
     
     
  #1379  
Old Posted May 2, 2016, 9:43 PM
nice nice is offline
Registered User
 
Join Date: Apr 2016
Posts: 7
Cant wait for this project to begin. At least construction is slated for July to enjoy watching in the summer months apposed to terrible windy city winters, like most projects seem to slide to.
Reply With Quote
     
     
  #1380  
Old Posted May 2, 2016, 9:54 PM
aaron38's Avatar
aaron38 aaron38 is offline
312
 
Join Date: Mar 2006
Location: Palatine
Posts: 4,138
Quote:
Originally Posted by harryc View Post
Ha
Quote:
At 1,186 feet the Vista Tower will become Chicago’s third tallest building and the city’s second highest roof since, unlike Trump International Hotel & Tower, Gang’s design does not rely on a thin spire to reach its ultimate height.
I'm running in the JP Morgan corporate chase 5k on 5/26, course winds past the site on upper Wacker. Was hoping I'd be running past an active site. Almost it seems.

Last edited by aaron38; May 3, 2016 at 1:42 PM.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture
Forum Jump



Forum Jump


All times are GMT. The time now is 11:20 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.