HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Global Projects & Construction > City Compilations


Reply

 
Thread Tools Display Modes
     
     
  #13621  
Old Posted Feb 25, 2018, 10:58 PM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,575
TAYLOR EDUCATION CENTER



Woodward is currently performing the core and shell work on the Taylor Education Center facility. The 4-story building, which previously served as the office building for Ives Printing Company, is being prepared for future tenant buildouts. Currently, Woodward’s team in the field is performing interior demolition and abatement, as well as constructing a penthouse addition.



PROJECT INFORMATION
CATEGORY
Mixed Use Construction
OWNER
1009 Camp Street, LLC
DESIGN
Woodward Design Group
SIZE
57,005 Square Feet
BUDGET
$9,456,814
LOCATION
New Orleans, LA
COMPLETION
August 2018
Reply With Quote
     
     
  #13622  
Old Posted Feb 25, 2018, 11:01 PM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,575
THE JULIA AT ST. CHARLES



Located in the Warehouse District of New Orleans, The Julia at St. Charles is slated to be a mixed use development, consisting of luxury apartment units, parking garage, and over 17,000 square feet of ground floor retail space. The development’s 198 planned apartment units will be a mix of one- and two- bedrooms, and 150 off-street parking spaces will be available to tenants and retail customers alike.

Construction on the project began in November of 2017, and included demolishing a concrete parking structure to make room for the new post-tensioned concrete and wood frame structure. The new development will retain a historic carriage house, which will be utilized as rental offices and managerial space.


PROJECT INFORMATION
CATEGORY
Mixed Use Construction
OWNER
Woodward Audubon, LLC
DESIGN
Trapolin-Peer Architects / Woodward Design Group
SIZE
300,000 Square Feet
BUDGET
$50,000,000
LOCATION
New Orleans, LA
COMPLETION
Spring 2019
Reply With Quote
     
     
  #13623  
Old Posted Feb 25, 2018, 11:18 PM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,575
Palmisano completes work on new headquarters


New Orleans commercial and civil construction firm Palmisano is ready to move into its new headquarters along the riverfront in the Lower Garden District.


The company cut the ribbon on its new 30,200-square-foot facility at 1730 Tchoupitoulas St. Tuesday. A news release said the new 2-story office building was needed to accommodate a growing workforce that now tops 100 employees.

Designed with the help of New Orleans architects Eskew+Dumez+Ripple, the structure has an open floor plan with few private offices, multiple small and large conference rooms, a large outdoor terrace, in-house gym and yoga studio and green space. There’s also a large training room that houses the company’s employee development program, Palmisano University.

The $9 million project nearly doubles the office space the firm had at its previous location at the corner of Carondelet and Julia Streets.

Palmisano purchased the land for $1.5 million in 2015 from Baton Rouge-based Source Capital LLC

Reply With Quote
     
     
  #13624  
Old Posted Feb 25, 2018, 11:22 PM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,575
IATSE LOCAL 478 CORPORATE HEADQUARTERS



Project Overview
This renovation project will convert an existing historic warehouse into IATSE Local 478’s new corporate headquarters. IATSE Local 478 is the local film makers union for motion picture studio mechanics in Louisiana, Southern Mississippi, and Mobile, Alabama. IATSE stands for International Alliance of Theatrical Stage Employees, Moving Picture Technicians, Artists and Allied Crafts of the United States, its Territories, and Canada.

The work includes:

Install new subsurface plumbing, water/sewer connections
Install new roof and new exterior doors
Install new awnings and windows
Provide new underground connection to city drain lines
Install underground r-tank drain water detention system
Frame in and finish office spaces, kitchen and conference rooms for the owner while also creating two separate tenant spaces for rent
McDonnel is working with MetroStudio Architects on this project.
Reply With Quote
     
     
  #13625  
Old Posted Feb 25, 2018, 11:23 PM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,575
OCHSNER MEDICAL OFFICE BUILDING




Project Overview
This new 57,000 Medical Office Building will be located in an area of New Orleans that has an urgent need for medical services. It will be the home to a variety of Ochsner doctors’ offices including obstetrics, pediatrics and internal medicine; drive-thru pharmacy; urgent care clinic; full service imaging center; and retail space. In addition, 114 parking spaces will also be included.

The structure is a timber pile supported, steel building with 3 levels. The building will consist of a blue roof, in line with Ochsner’s branding.

McDonnel is working with Verges Rome Architects on this design build project.
Reply With Quote
     
     
  #13626  
Old Posted Feb 25, 2018, 11:26 PM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,575
Reply With Quote
     
     
  #13627  
Old Posted Feb 26, 2018, 8:08 PM
v-chop v-chop is offline
Registered User
 
Join Date: Sep 2011
Posts: 183
Quote:
Originally Posted by tennis1400 View Post
OCHSNER MEDICAL OFFICE BUILDING




Project Overview
This new 57,000 Medical Office Building will be located in an area of New Orleans that has an urgent need for medical services. It will be the home to a variety of Ochsner doctors’ offices including obstetrics, pediatrics and internal medicine; drive-thru pharmacy; urgent care clinic; full service imaging center; and retail space. In addition, 114 parking spaces will also be included.

The structure is a timber pile supported, steel building with 3 levels. The building will consist of a blue roof, in line with Ochsner’s branding.

McDonnel is working with Verges Rome Architects on this design build project.
Thanks Tennis. Is this at Paris and Robert E. Lee? If so, does the site still call for outparcels? I think original plans called for one to occupied by a First NBC branch.
Reply With Quote
     
     
  #13628  
Old Posted Feb 26, 2018, 10:28 PM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,575
Quote:
Originally Posted by v-chop View Post
Thanks Tennis. Is this at Paris and Robert E. Lee? If so, does the site still call for outparcels? I think original plans called for one to occupied by a First NBC branch.
this is on paris but not right on the corner.. the corner is planned to be another commercial building I think a clinic but not sure... def not a First NBC branch thats for sure lolol
Reply With Quote
     
     
  #13629  
Old Posted Feb 26, 2018, 10:32 PM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,575
Someone here mentioned work stopping at 735 st charles condo project..looks like given permit applications today the previous contractor was replaced

731 St Charles Ave·Dumpster/Construction Zone ·Ref Code: DALSUS
Download (1) Print Summary Submit Add to Watch List
Type:
Dumpster/Construction Zone
Applicant:
Gibbs Residential LLC
Status:
Application Review
Date Filed:
2/26/2018
Closed:
No
Description
Pedestrian safety and equipment/labor movement.


700 Carondelet St·Dumpster/Construction Zone ·Ref Code: FPSWBV
Download (1) Print Summary Submit Add to Watch List
Type:
Dumpster/Construction Zone
Applicant:
Gibbs Construction LLC
Status:
Application Review
Date Filed:
2/26/2018
Closed:
No
Description
Parking Meters at 700 Carondelet



721 St Charles Ave·Dumpster/Construction Zone ·Ref Code: 02YWFC
Download (1) Print Summary Submit Add to Watch List
Type:
Dumpster/Construction Zone
Applicant:
Gibbs Residential LLC
Status:
Application Review
Date Filed:
2/26/2018
Closed:
No
Description
Pedestrian safety and equipment/labor movement.



727 Carondelet St·Dumpster/Construction Zone ·Ref Code: P51GK5
Download (2) Print Summary Submit Add to Watch List
Type:
Dumpster/Construction Zone
Applicant:
Gibbs Residential LLC
Status:
Application Review
Date Filed:
2/26/2018
Closed:
No
Description
Equipment set-up and mobilization.



looks like the contractor has changed from Mcdonnel group to Gibbs.



Reply With Quote
     
     
  #13630  
Old Posted Feb 26, 2018, 10:43 PM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,575
Algiers Project












NOCVB:






Reply With Quote
     
     
  #13631  
Old Posted Feb 27, 2018, 3:12 AM
socigradstudent socigradstudent is offline
Registered User
 
Join Date: Mar 2016
Location: New Orleans
Posts: 201
Oakwood Mall

A friend of mine informed me that Oakwood Mall purchased the closed down Sears building. "Something exciting and new to the NOLA market." He also said the Sears building will be abated and split up with this new tenant taking a big space (but not department store size) and the rest of the building will be carved and split into retail. Does anyone have any inside knowledge?!

(I live in Mid City but grew up in Terrytown. The more I think about it, Oakwood Mall is so freaking geographically perfect--5 minutes from downtown, first exit when you get to the Westbank and has TONS of open land behind the JC Penney. This could be something really good and transformative for that part of the Westbank. I think Esplanade Mall is more or less done. Besides Lakeside, I think Oakwood has a fighting chance.
Reply With Quote
     
     
  #13632  
Old Posted Feb 27, 2018, 3:04 PM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,575
Quote:
Originally Posted by socigradstudent View Post
A friend of mine informed me that Oakwood Mall purchased the closed down Sears building. "Something exciting and new to the NOLA market." He also said the Sears building will be abated and split up with this new tenant taking a big space (but not department store size) and the rest of the building will be carved and split into retail. Does anyone have any inside knowledge?!

(I live in Mid City but grew up in Terrytown. The more I think about it, Oakwood Mall is so freaking geographically perfect--5 minutes from downtown, first exit when you get to the Westbank and has TONS of open land behind the JC Penney. This could be something really good and transformative for that part of the Westbank. I think Esplanade Mall is more or less done. Besides Lakeside, I think Oakwood has a fighting chance.
Just my two cents but I tend to agree that as far as staying a mall Oakwood is better positioned than Esplanade... the lifting of the tolls really helped as well. I think esplanade will exist going forward but as a much more mixed use, open air center than it is now. they do have some developments there that will change its appeal: new apartment project, car max and the new airport terminal
Reply With Quote
     
     
  #13633  
Old Posted Feb 27, 2018, 7:16 PM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,575
Looks like another crane is up todsy at 730 julia
Reply With Quote
     
     
  #13634  
Old Posted Feb 28, 2018, 2:49 PM
nolafan nolafan is offline
Registered User
 
Join Date: Mar 2016
Location: New Orleans
Posts: 246
Quote:
Originally Posted by tennis1400 View Post
Looks like another crane is up todsy at 730 julia
I walked by it today and it's still the same crane. Just one.
Reply With Quote
     
     
  #13635  
Old Posted Feb 28, 2018, 3:04 PM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,575
Quote:
Originally Posted by nolafan View Post
I walked by it today and it's still the same crane. Just one.
I meant another crane in general... didnt know one was there before
Reply With Quote
     
     
  #13636  
Old Posted Feb 28, 2018, 4:35 PM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,575
The Higgins Hotel (cranes not up yet but must be coming shortly)














Reply With Quote
     
     
  #13637  
Old Posted Feb 28, 2018, 4:59 PM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,575
801 Magazine (The Auction House):














The Kalorama:

Reply With Quote
     
     
  #13638  
Old Posted Feb 28, 2018, 5:19 PM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,575
The Julia at St Charles and The Stephens Garage

















Reply With Quote
     
     
  #13639  
Old Posted Feb 28, 2018, 5:29 PM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,575
941 Julia:





419 Carondelet:







Piazza Di Italia Rehab:







Canal Crossing:







Towneplace Suites:

Reply With Quote
     
     
  #13640  
Old Posted Feb 28, 2018, 5:35 PM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,575
The Standard:





















Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Global Projects & Construction > City Compilations
Forum Jump



Forum Jump


All times are GMT. The time now is 9:14 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.