Quote:
Originally Posted by go go white sox
Thanks for clarifying this I was about to ask. I never knew I would learn about construction when I joined this forum is pretty neat.
|
Yeah, hopefully Case is planning on rolling it's big rock cassion rigs over here straight from the RAMSA building on Grand. I don't think I've ever seen cassion markers show up more than a week or two before foundation contractors show up. Case will probably be another week or two at Grand before they finish up which would be about the timeframe I would expect to see them show up here if what I'm saying is correct. We don't see a whole lot of rock cassions in general so there really isn't that much equipment floating around for them relative to the smaller hard pan cassion rigs we see. It would make total sense for Case to save the expense of packing it all back up and taking it out to wherever they store it if they could knock two birds out at once.
I am by no means an expert on this and they could very well just be seeing how the site lays out or something, but like I said, in the decade plus I've been following construction I've never seen them mark a site like this much more than a few weeks before equipment does. Anyone else agree/disagree?