  #13181  
Old Posted Oct 23, 2019, 11:59 PM
OCCheetos OCCheetos is offline
Registered User
 
Join Date: Aug 2017
Posts: 2,111
Quote:
Originally Posted by kmcamp View Post
Especially when I've been at Tunney's it seems the operator really needs to boot it to make it to the other end in time. I witnessed an incoming train stopped once because the operator hadn't made it into the cab
If I'm not mistaken, at least during peak periods, an operator will board the back of the train at Bayview so the train is ready to turn around pretty much immediately once it reaches Tunney's.
     
     
  #13182  
Old Posted Oct 24, 2019, 3:08 AM
lrt's friend lrt's friend is online now
Registered User
 
Join Date: Dec 2006
Posts: 12,780
Groan! CBC News has reported that there was a second shutdown today at St. Laurent station during the afternoon rush hour.
     
     
  #13183  
Old Posted Oct 24, 2019, 5:39 AM
mykl mykl is offline
Registered User
 
Join Date: Jan 2015
Location: Ottawa
Posts: 475
I thought they added those stickers on the ground to tell people where to stand... I didn't see them at any station today.
     
     
  #13184  
Old Posted Oct 24, 2019, 10:45 AM
kmcamp kmcamp is offline
Registered User
 
Join Date: Sep 2016
Posts: 1,401
Quote:
Originally Posted by mykl View Post
I thought they added those stickers on the ground to tell people where to stand... I didn't see them at any station today.
Only at Lyon. I think the other stations are coming soon. I think Lyon has some bad crowding issues because it has really narrow platforms. I'm not sure why they didn't just arrange it like Parliament and Rideau to maximize platform space. The extra sets of stairs helps vertical circulation but it seems to be the quietest of the 3 tunnel stations, so I'm not sure why it has it.
     
     
  #13185  
Old Posted Oct 24, 2019, 11:47 AM
rocketphish's Avatar
rocketphish rocketphish is online now
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,575
Documents show confusion, misinformation during LRT delays

Tom Spears, Ottawa Citizen
Updated: October 24, 2019


Wrong PA announcements.

Wrong information on the overhead signs.

OC Transpo staff who “weren’t given enough time to move customers” when an LRT delay occurred.

And somehow, the wrong recorded announcement was able to “override” the correct one on the PA system.

These communications gremlins faced OC Transpo on the Tuesday of its first week of LRT service, during its first significant delay, which slowed the system for about 40 minutes. Details in an internal “sit rep” (situation report) were released through an access to information request after this newspaper could not get the information about that day’s LRT delay through regular channels.

That first breakdown (when a train had to be hauled away) happened while cross-town buses were still running their old service in parallel with the trains. Breakdowns and delays became more serious after Oct. 6, when buses were taken away and everyone had to take the trains.

Sarah Wright-Gilbert, a citizen member of the city’s transit commission, said communication surrounding delays has been a persistent issue for OC Transpo.

“It’s not good, to be honest,” she said in an interview.

She said it’s time for the transit system to work harder at keeping LRT passengers informed whenever things go wrong.

Wright-Gilbert said LRT service is usually “incredible” for her daily commute across the full length of Line 1. But she said passengers are too often left in the dark if there is a delay.

In September she was stuck on a stopped train “with absolutely no information from OC Transpo on Twitter.” (Transpo has since beefed up its use of the OCTranspoLive Twitter feed.)

She was delayed again this Monday, and the train operators “were giving only very generic information — ‘We are experiencing delays. We should be going in a couple of minutes’.” Eventually passengers were told to get off, and no one in Cyrville station could tell her what was happening either.

“And that’s my concern, when the rail operator is telling me one thing and then I’m getting zero information from the people who are the face of OC Transpo on the platform … And it’s not his fault. He didn’t have the information,” she said.

The PA told her there was a delay. The displays said the trains were “held.” That was all.

Wright-Gilbert was also disturbed by the contrast between the Sept. 17 “sit rep” and an email that general manager John Manconi wrote to Ottawa councillors the same day. She says the email “glossed over” problems that commissioners should have been told about.

It says in part: “Day 2 of this amazing new system was solid on multiple fronts … Overall we are exactly where we need to be, remembering that parallel bus service peels off on Oct. 6 making things even more precise while ensuring our number one priority is covered — our customers.

“On October 7 customers receive their final change and your $5.1 M bus improvement investment city wide which improves bus service along with the anticipated significant bus reliability from not having to run buses through the core/across the city.

“Bus service reliability will improve as planned.”

“I’m concerned,” Wright-Gilbert said. “We are told as commissioners that it is not our job to worry about operations.” But she argues that the commission’s role is to promote transit and to hold Transpo to account, which can’t happen when Manconi’s email “is not reflective of what happened that day. I’m concerned that the information in the email is not complete. We were not given a complete picture. And it’s clear from this sit rep that the communications were a serious issue.”

She is also annoyed that October’s monthly commission meeting was cancelled for lack of written reports to discuss. She feels it’s time to discuss the LRT, as well as bus reliability which many passengers perceive as declining.

On Wednesday of this week, the confusion around a delay continued. The official OC Transpo announcement said service was running, though passengers could only use the eastbound platforms at three stations — Hurdman, Lees and uOttawa.

On social media passengers complained they were not being told what was happening or how long delays would last.

[email protected]
twitter.com/TomSpears1

https://ottawacitizen.com/news/local-news/documents-show-confusion-misinformation-during-lrt-delays
     
     
  #13186  
Old Posted Oct 24, 2019, 12:41 PM
Radster Radster is offline
Registered User
 
Join Date: Oct 2007
Location: Chelsea
Posts: 997
Quote:
Originally Posted by kmcamp View Post
Especially when I've been at Tunney's it seems the operator really needs to boot it to make it to the other end in time. I witnessed an incoming train stopped once because the operator hadn't made it into the cab
Must be challenging when the platform is packed with rush hour commuters.
     
     
  #13187  
Old Posted Oct 24, 2019, 12:42 PM
Radster Radster is offline
Registered User
 
Join Date: Oct 2007
Location: Chelsea
Posts: 997
.
     
     
  #13188  
Old Posted Oct 24, 2019, 2:47 PM
zzptichka zzptichka is online now
Registered User
 
Join Date: Dec 2015
Location: Outaouias
Posts: 2,366

OC Transpo Live
@OCTranspoLive
Update 10:15AM: Possible delays can be expected on O-Train Line 1 due to immobilized train at Tremblay. Updates to follow.



Second breakdown today.
I guess not a door issue, given that Tremblay is always empty.
     
     
  #13189  
Old Posted Oct 25, 2019, 12:25 AM
rocketphish's Avatar
rocketphish rocketphish is online now
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,575
Slippery platforms a danger, some LRT passengers say

Tom Spears, Ottawa Citizen
Updated: October 24, 2019


Some LRT stations have stairs and platforms that are dangerously slippery when wet, passengers are saying. And they warn that winter snow and slush won’t improve the situation.

A passenger named Lambert tweeted: “The floor at #ottLRT Lyon Station gets really wet and really slippery. I predict that there will be a few bruises, torn ankles and broken bones. I hope #ottcity (has) good insurance because Lyon station will be a paradise for injury lawyers.”

Kitchisippi Coun. Jeff Leiper says he is concerned and is dealing with OC Transpo about this emerging issue.

Many passengers report that Lyon and Parliament stations seem to have the slipperiest floors and stairs, possibly due to smooth tiles used there.

“Clearly, with the volume of social media stuff out there, there’s reason for concern. So I’ve raised it with OC Transpo,” Leiper said in an interview. (Eight councillors are members of the transit commission, but he is not one of them.)

Leiper said he has been taking the train fairly often, but has not personally seen slippery conditions. “But I’m not sure that I’ve been travelling when we’ve had those heavy rainfalls,” he said. “There’s enough discussion about it on social media that there seems to be an issue here that needs looking into.”

[email protected]
twitter.com/TomSpears1

https://ottawacitizen.com/news/slippery-platforms-a-danger-some-lrt-passengers-say
     
     
  #13190  
Old Posted Oct 25, 2019, 3:47 PM
AuxTown's Avatar
AuxTown AuxTown is offline
Registered User
 
Join Date: Apr 2006
Location: Ottawa, Canada
Posts: 4,618
Quote:
Originally Posted by zzptichka View Post

OC Transpo Live
@OCTranspoLive
Update 10:15AM: Possible delays can be expected on O-Train Line 1 due to immobilized train at Tremblay. Updates to follow.



Second breakdown today.
I guess not a door issue, given that Tremblay is always empty.
I heard the announcements but things ran very well between Tunney's and Parliament. Just a slight delay when pulling into Parliament. I decided to bike into town today and take the train for the last little bit. I found it quite easy and despite being pretty busy people were quite accommodating for me and my ride.
     
     
  #13191  
Old Posted Oct 25, 2019, 4:51 PM
kmcamp kmcamp is offline
Registered User
 
Join Date: Sep 2016
Posts: 1,401
Quote:
Originally Posted by AuxTown View Post
I heard the announcements but things ran very well between Tunney's and Parliament. Just a slight delay when pulling into Parliament. I decided to bike into town today and take the train for the last little bit. I found it quite easy and despite being pretty busy people were quite accommodating for me and my ride.
They are generally managing the delays pretty well now, they're just still happening to frequently though. It'll be a while yet until reliability is where it should be.
     
     
  #13192  
Old Posted Oct 26, 2019, 3:30 AM
Truenorth00 Truenorth00 is online now
Registered User
 
Join Date: May 2017
Posts: 28,933
I had a curious situation on the way home from work. I was on a train where a set of doors didn't work. Rest of the doors operated fine and the train was in service. If they're able to isolate doors like that, why have they had so many issues?
     
     
  #13193  
Old Posted Oct 26, 2019, 3:41 AM
OCCheetos OCCheetos is offline
Registered User
 
Join Date: Aug 2017
Posts: 2,111
Quote:
Originally Posted by Truenorth00 View Post
I had a curious situation on the way home from work. I was on a train where a set of doors didn't work. Rest of the doors operated fine and the train was in service. If they're able to isolate doors like that, why have they had so many issues?
I think it's because the door still needs to be physically shut correctly. It still takes time to close it manually, and if it can't be shut properly the train needs to be taken out of service.

The last couple of incidents didn't last very long, presumably only long enough so they could bypass the doors.
     
     
  #13194  
Old Posted Oct 28, 2019, 2:59 AM
Uhuniau Uhuniau is online now
Registered User
 
Join Date: Jan 2010
Posts: 9,045
Quote:
Originally Posted by J.OT13 View Post
the City could have at least accepted feedback from the public

Lol.
__________________
___
Enjoy my taxes, Orleans (and Kanata?).
     
     
  #13195  
Old Posted Oct 28, 2019, 3:03 AM
Uhuniau Uhuniau is online now
Registered User
 
Join Date: Jan 2010
Posts: 9,045
Quote:
Originally Posted by TheMatth69 View Post
And already people standing straight in the middle of the things while it clearly means that you have to board from the side of the doors... ... Gonna start thinking that people in Ottawa are just straight up dumb
That is not what it means.
__________________
___
Enjoy my taxes, Orleans (and Kanata?).
     
     
  #13196  
Old Posted Oct 28, 2019, 8:07 PM
kmcamp kmcamp is offline
Registered User
 
Join Date: Sep 2016
Posts: 1,401
Quote:
Originally Posted by Uhuniau View Post
That is not what it means.
What annoys me isn't those people, it's the ones who board the train and immediately stop 5cm in even though there's plenty of room for them to keep going, blocking everyone else from getting on.
     
     
  #13197  
Old Posted Oct 28, 2019, 11:10 PM
kwoldtimer kwoldtimer is offline
Registered User
 
Join Date: Jan 2008
Location: La vraie capitale
Posts: 26,194
Quote:
Originally Posted by kmcamp View Post
What annoys me isn't those people, it's the ones who board the train and immediately stop 5cm in even though there's plenty of room for them to keep going, blocking everyone else from getting on.
Winter jackets and backpacks can make it more challenging, but a knuckle to the spine combined with forward momentum is usually effective, the same as at the top/bottom of escalators ....
     
     
  #13198  
Old Posted Oct 28, 2019, 11:12 PM
daud's Avatar
daud daud is offline
Registered User
 
Join Date: Jun 2012
Location: Ottawa
Posts: 762
Even the O has had it.

     
     
  #13199  
Old Posted Oct 28, 2019, 11:41 PM
lrt's friend lrt's friend is online now
Registered User
 
Join Date: Dec 2006
Posts: 12,780
Well, that was inevitable
     
     
  #13200  
Old Posted Oct 29, 2019, 1:31 AM
Uhuniau Uhuniau is online now
Registered User
 
Join Date: Jan 2010
Posts: 9,045
Quote:
Originally Posted by kmcamp View Post
What annoys me isn't those people, it's the ones who board the train and immediately stop 5cm in even though there's plenty of room for them to keep going, blocking everyone else from getting on.
Yup; the old Ottawa Escalator (Revolving Door, Elevator, etc.) Manoeuvre.

The obliviousness of people in this town always astounds me when I get back here from almost anywhere else with these modern connivances.
__________________
___
Enjoy my taxes, Orleans (and Kanata?).
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 7:29 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.