HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Atlantic Provinces


Reply

 
Thread Tools Display Modes
     
     
  #1241  
Old Posted Sep 21, 2022, 10:14 PM
bridgeoftea's Avatar
bridgeoftea bridgeoftea is offline
Registered User
 
Join Date: Nov 2021
Posts: 700
patience is extra hard on a forum discussing buildings being imagined, approved and built! but it's a great way to pass the time at work when it's a bit slow!
Reply With Quote
     
     
  #1242  
Old Posted Sep 21, 2022, 10:38 PM
DyAm00394 DyAm00394 is offline
Registered User
 
Join Date: Sep 2017
Location: Saint John, N.B
Posts: 2,037
Quote:
Originally Posted by Sabien View Post
They're currently installing decorative screening around the 99 King street site showing the renderings for the project along with slogans like "Play Uptown, Live on King!" and "Be Part of the Uptown Experience!" And a crest with “99 King”. If the project was drastically stalled or cancelled, I could see them including the slogans, but why bother with the renderings? Does this warrant some optimism?
Something interesting, this info was shared to Retail Talk and Share NB group on Facebook and the owner of an interior construction company commented: "If I only I could comment lol 🤐". So perhaps this is a good sign. Source of comment: https://www.facebook.com/groups/16905026...51432870878/?comment_id=3407002362865785
Reply With Quote
     
     
  #1243  
Old Posted Sep 21, 2022, 10:40 PM
ColSJ's Avatar
ColSJ ColSJ is offline
Registered User
 
Join Date: Mar 2018
Posts: 854
Thumbs up

Quote:
Originally Posted by DyAm00394 View Post
Something interesting, this info was shared to Retail Talk and Share NB group on Facebook and the owner of an interior company commented: "If I only I could comment lol 🤐". So perhaps this is a good sign.
The suspense is real!
Reply With Quote
     
     
  #1244  
Old Posted Sep 22, 2022, 9:15 PM
ColSJ's Avatar
ColSJ ColSJ is offline
Registered User
 
Join Date: Mar 2018
Posts: 854
Flewwelling Press posted that Tower Contracting the company that built The Wentworth reached out to them to have the banners made for 99 King. Flewelling described it in an Instagram post “With construction at the top of King on a brief pause”.
Reply With Quote
     
     
  #1245  
Old Posted Sep 22, 2022, 10:22 PM
Helladog's Avatar
Helladog Helladog is offline
Unregistered Loser
 
Join Date: Jul 2007
Location: NB
Posts: 1,417
Nice to see shovels in the ground in 2023.
Reply With Quote
     
     
  #1246  
Old Posted Sep 24, 2022, 1:31 PM
DyAm00394 DyAm00394 is offline
Registered User
 
Join Date: Sep 2017
Location: Saint John, N.B
Posts: 2,037
Timelines For ‘The Wellington’ Opening Pushed Back

Quote:
“Construction on The Wellington is moving slower than planned but Saint John Non Profit Housing Inc is still moving forward with ambitious partnerships for the flagship building. February or early March of 2023 is the new timeline for “The Wellington” mixed-use building that’s under construction in uptown Saint John to be move-in ready.

Work on the six-storey, mixed-use building has begun to move inside as work on the 47 apartments within begins. Half of the units will be subsidized, others will be set at a market rate of $1,400 per month, all inclusive”.
https://huddle.today/2022/09/23/timelines-for-the-wellington-opening-pushed-back/
Reply With Quote
     
     
  #1247  
Old Posted Sep 25, 2022, 7:21 PM
cdnguys cdnguys is offline
Registered User
 
Join Date: Sep 2010
Posts: 2,379
[IMG] [/IMG]
Reply With Quote
     
     
  #1248  
Old Posted Sep 25, 2022, 8:03 PM
darkharbour darkharbour is offline
Registered User
 
Join Date: Jan 2021
Posts: 815
Glad there is signage, but my goodness is that 99 King logo embarrassing.
Reply With Quote
     
     
  #1249  
Old Posted Sep 25, 2022, 9:11 PM
cdnguys cdnguys is offline
Registered User
 
Join Date: Sep 2010
Posts: 2,379
Quote:
Originally Posted by darkharbour View Post
Glad there is signage, but my goodness is that 99 King logo embarrassing.
Ok I didn’t want to say anything but since you brought it up. Looks like the cover of a 1932 St Vincent’s High School year book
Reply With Quote
     
     
  #1250  
Old Posted Sep 25, 2022, 9:26 PM
cdnguys cdnguys is offline
Registered User
 
Join Date: Sep 2010
Posts: 2,379
Reply With Quote
     
     
  #1251  
Old Posted Sep 26, 2022, 11:22 AM
bridgeoftea's Avatar
bridgeoftea bridgeoftea is offline
Registered User
 
Join Date: Nov 2021
Posts: 700
Quote:
Originally Posted by DyAm00394 View Post
Timelines For ‘The Wellington’ Opening Pushed Back



https://huddle.today/2022/09/23/timelines-for-the-wellington-opening-pushed-back/
I'd love to know what the plan is for the commercial spots on the ground floor.
Reply With Quote
     
     
  #1252  
Old Posted Sep 26, 2022, 2:35 PM
DyAm00394 DyAm00394 is offline
Registered User
 
Join Date: Sep 2017
Location: Saint John, N.B
Posts: 2,037
Quote:
Originally Posted by bridgeoftea View Post
I'd love to know what the plan is for the commercial spots on the ground floor.
The article mentions the plans:

Quote:
“Negotiations have also begun for some of the ground floor retail space.

Nothing is confirmed but there has been interest from a local Saint John company for “a trendy, diner-style restaurant that may include grab-and-go and outside seating in the summer months,” according to Saint John Non Profit Housing Inc. general manager Narinder Singh”.
Reply With Quote
     
     
  #1253  
Old Posted Sep 27, 2022, 2:30 PM
adamuptownsj adamuptownsj is offline
Registered User
 
Join Date: Aug 2020
Location: Saint John NB
Posts: 2,024
Not sure if this is the right place to post, but there's some interesting tax sale properties that have gone neglected for years up in October, including one with a good piece of vacant land. Something to watch re: future small scale development...

295-305 Charlotte Street (corner of Charlotte/St. James, beat up duplex and vacant lot near proposed school location)

259-261 Germain Street (corner of Germain/Queen, brick 4plex)

259 Duke Street (near Duke/Wentworth, vinyl triplex)

97 Hazen Street (halfway between St Joe's and Garden, brick, no idea if it's a SFH or duplex/triplex)

Assuming Charlotte is a teardown and new build, that's 8-10 refurb units that could come online by this time next year. They add up!
Reply With Quote
     
     
  #1254  
Old Posted Sep 29, 2022, 6:12 PM
cdnguys cdnguys is offline
Registered User
 
Join Date: Sep 2010
Posts: 2,379
Saw this on Acre’s Insta of siding going on Wellington

[IMG][/IMG]
Reply With Quote
     
     
  #1255  
Old Posted Oct 5, 2022, 1:30 AM
ColSJ's Avatar
ColSJ ColSJ is offline
Registered User
 
Join Date: Mar 2018
Posts: 854
Grabbing this article from the 99 King thread as there are mentions of the uptown area in general.

https://huddle.today/2022/10/04/changing...n-for-old-woolworths-site-in-saint-john/

Office space is being swapped for residential units which will bring the total # of units to around 110. That's a lot of people who will be living on the top of King. The ground floor will remain commercial and Percy is consistent that he wants a grocery store on this spot.

He mentions the new k-8 school that's coming and how that will attract families into the core.

This snippet caught my attention... "He has a hopeful vision for a vibrant Saint John core and is confident his developments both at King St. and whatever projects lie ahead in the future, can be a part of that."

... a clear hint Percy will not be finished after 99 King is complete.
Reply With Quote
     
     
  #1256  
Old Posted Oct 5, 2022, 10:58 AM
cdnguys cdnguys is offline
Registered User
 
Join Date: Sep 2010
Posts: 2,379
Quote:
Originally Posted by ColSJ View Post
Grabbing this article from the 99 King thread as there are mentions of the uptown area in general.

https://huddle.today/2022/10/04/changing...n-for-old-woolworths-site-in-saint-john/

Office space is being swapped for residential units which will bring the total # of units to around 110. That's a lot of people who will be living on the top of King. The ground floor will remain commercial and Percy is consistent that he wants a grocery store on this spot.

He mentions the new k-8 school that's coming and how that will attract families into the core.

This snippet caught my attention... "He has a hopeful vision for a vibrant Saint John core and is confident his developments both at King St. and whatever projects lie ahead in the future, can be a part of that."

... a clear hint Percy will not be finished after 99 King is complete.
Interesting because it was rumoured Envision Saint John had signed on as one of his tenants (thus the temporary rental of property for them in city market tower). It’s possible that is still happening and just not articulated in the article. The ground floor is huge so maybe Envision will be on one side of the ground floor. Glad there was no mention of reducing height to reduce cost.
Reply With Quote
     
     
  #1257  
Old Posted Oct 5, 2022, 11:57 AM
adamuptownsj adamuptownsj is offline
Registered User
 
Join Date: Aug 2020
Location: Saint John NB
Posts: 2,024
All Atlantic reported this morning that a bunch of contractors from the Wentworth suing Wilbur for $5-6M total.
Reply With Quote
     
     
  #1258  
Old Posted Oct 5, 2022, 12:47 PM
cdnguys cdnguys is offline
Registered User
 
Join Date: Sep 2010
Posts: 2,379
Quote:
Originally Posted by adamuptownsj View Post
All Atlantic reported this morning that a bunch of contractors from the Wentworth suing Wilbur for $5-6M total.
It’s locked content. Can you provide coles notes version if you have access ?
Reply With Quote
     
     
  #1259  
Old Posted Oct 5, 2022, 12:56 PM
adamuptownsj adamuptownsj is offline
Registered User
 
Join Date: Aug 2020
Location: Saint John NB
Posts: 2,024
Quote:
Originally Posted by cdnguys View Post
It’s locked content. Can you provide coles notes version if you have access ?
Sure. I recommend subscribing if you're into this stuff and business in general, they do great work.

Lindsay Construction suing for $3.67M breach of contract + more for subcontractors/indemnity

Security Electrical $253K

J-Mar $392K

Mike's Custom Woodworks $248K

Sktrise Prefab $287K
Reply With Quote
     
     
  #1260  
Old Posted Oct 5, 2022, 3:03 PM
cdnguys cdnguys is offline
Registered User
 
Join Date: Sep 2010
Posts: 2,379
Quote:
Originally Posted by adamuptownsj View Post
Sure. I recommend subscribing if you're into this stuff and business in general, they do great work.

Lindsay Construction suing for $3.67M breach of contract + more for subcontractors/indemnity

Security Electrical $253K

J-Mar $392K

Mike's Custom Woodworks $248K

Sktrise Prefab $287K
Never heard of that site, will check out. Unfortunate this is happening, who will build 99 King I wonder with this situation?
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Atlantic Provinces
Forum Jump



Forum Jump


All times are GMT. The time now is 6:42 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.