Quote:
Originally Posted by rofina
To utilise the benefit of transporting the dirt faster you would require a significantly higher volume of trucks.
That's just a fact, our tiny one way streets simply cant accommodate a line of 5 or 10 trucks and trailers for each development.
Whats the point of not running a conveyor full stop? Where is your time savings benefit? You might as well stick to the double excavator set up.
|
I’m just being practical here...
Dump truck pulls up. Excavator is ready to go in the pit with a pile of dirt next to it. Turn on the conveyor belt and load dirt onto belt until truck is full. Truck leaves, belt is turned off, gives excavator time to form a new pile of dirt next to the conveyor belt for another load when another truck arrives.
As opposed to loading an excavator bucket with another excavator bucket and then loading the dump truck with that second excavator