Quote:
Originally Posted by 10023
What will it take to have the Metra electric tracks through Grant Park fully covered? I worry that there won’t be any impetus to do it once the South Loop is fully built out. They should be getting developers of these buildings to contribute to that project in exchange for density bonuses or TIF district designation.
|
The impetus will arrive when there are 30k more people living in that neighborhood and tons of people are bitching about it.
Nothing is happening for at least 20 years, and tbh I'd rather nothing happen to the tracks north of Roosevelt. Train infrastructure is a our history, provides beautiful juxtaposition between the graceful skyline and our rugged past, and to put it simply, trains are badass.
As for the tracks between Roosevelt and McCormick? Yeah, hopefully they get decked by 2040