  #12121  
Old Posted Jan 26, 2011, 10:57 PM
jigglysquishy's Avatar
jigglysquishy jigglysquishy is offline
Registered User
 
Join Date: Jul 2010
Location: Saskatchewan
Posts: 3,326
Can they not do glass in this weather? I only ask because its been almost a month since any glass went up.
     
     
  #12122  
Old Posted Jan 26, 2011, 11:21 PM
STR's Avatar
STR STR is offline
Because I'm Clever!
 
Join Date: Oct 2004
Location: Chicago, Illinois
Posts: 5,078
^They hung the NW corner piece sometime late last week. I expect they'll be filling in that part of the building next.
__________________
There are six phases to every project 1) enthusiasm, 2) disillusionment, 3) panic, 4) search for the guilty, 5) punishment of the innocent, 6) praise for the non-participants. - Guy Tozzoli
Build your own Model Skyscrapers** New York City 2015 3D Model W/ New WTC ** World Trade Center (1971-2001) 3D Model
     
     
  #12123  
Old Posted Jan 27, 2011, 4:18 AM
Tumbleweed_Tx's Avatar
Tumbleweed_Tx Tumbleweed_Tx is offline
BANNED
 
Join Date: Sep 2010
Location: GB
Posts: 70
not being anywhere near the site, I'd still guess that they're either waiting for the fireproofing on floors above them to progress, or, they're waiting on another shipment of glass
     
     
  #12124  
Old Posted Jan 27, 2011, 5:33 AM
meh_cd meh_cd is offline
Registered User
 
Join Date: Jul 2008
Posts: 571
I caught a flatbed with a bunch of glass on the Earthcam on the 20th.
     
     
  #12125  
Old Posted Jan 27, 2011, 2:38 PM
thenbagis thenbagis is offline
Registered User
 
Join Date: Jul 2009
Location: Fairmount, Philly, PA, USA
Posts: 312
I know some snow is expected in NYC every winter, but this winter it seems like we've (I'm in Philly) been hit more frequently than average. Does anyone know if it has affected schedules at all? Just thinking... some man-hours have to be lost to snow removal or storm prep (tarps?) for each storm. Especially since I imagine they can't use any salt (rust the hell out of the steel).

Thoughts?
     
     
  #12126  
Old Posted Jan 27, 2011, 4:17 PM
NYguy's Avatar
NYguy NYguy is offline
New Yorker for life
 
Join Date: Jul 2001
Location: Borough of Jersey
Posts: 56,649
__________________
NEW YORK is Back!

“Office buildings are our factories – whether for tech, creative or traditional industries we must continue to grow our modern factories to create new jobs,” said United States Senator Chuck Schumer.

Last edited by NYguy; Jan 27, 2011 at 4:29 PM.
     
     
  #12127  
Old Posted Jan 27, 2011, 6:44 PM
Zensteeldude Zensteeldude is offline
Honored Member
 
Join Date: Jul 2009
Location: Northern New Jersey
Posts: 692
Cool pics.

Quote:
Originally Posted by thenbagis View Post
I know some snow is expected in NYC every winter, but this winter it seems like we've (I'm in Philly) been hit more frequently than average. Does anyone know if it has affected schedules at all? Just thinking... some man-hours have to be lost to snow removal or storm prep (tarps?) for each storm. Especially since I imagine they can't use any salt (rust the hell out of the steel).

Thoughts?
Last nights storm put us over 3 feet of snow for January, over 6 feet for the session, so far.

Every long term project has weather delays built into the schedule but this is silly. There may be an "Act of God" clause in some of the contracts.

I bet that just about the only folks working at the site today are Laborers and some Operating Engineers for snow removal.

There are other products that melt snow and ice that are not corrosive.

PS: I didn't even try to go to work today, I don't care how good the AWD system is on my truck. (The weather man gets a D- for predicting 8 to 12 inches, 18+ is more like it.)
     
     
  #12128  
Old Posted Jan 27, 2011, 8:44 PM
sw5710 sw5710 is offline
Registered User
 
Join Date: Nov 2008
Posts: 1,519
On the Discovery cam on 7 WTC. I see workers on top of 1 WTC and one of the cranes has moved.
     
     
  #12129  
Old Posted Jan 27, 2011, 9:00 PM
uakoops uakoops is offline
Registered User
 
Join Date: Jul 2009
Posts: 201
Quote:
Originally Posted by sw5710 View Post
On the Discovery cam on 7 WTC. I see workers on top of 1 WTC and one of the cranes has moved.
They are shoveling the snow into dumpsters then the crane lowers them down to be emptied.
     
     
  #12130  
Old Posted Jan 27, 2011, 9:31 PM
Jaystang5 Jaystang5 is offline
Registered User
 
Join Date: Sep 2010
Posts: 39
basically if not all, most of the answer are now posted (since a looonggg time ago) that are now on the PA website on the Q&A of 1 World Trade Center... I bet most of them don't even know about this forum, except now i know more about the base-concrete placement and that every one who has predicted when the tower is gonna surpassed 7 WTC, reach is final height etc etc... is CORRECT
     
     
  #12131  
Old Posted Jan 27, 2011, 10:48 PM
JSsocal JSsocal is offline
Registered User
 
Join Date: Dec 2008
Posts: 716
Questions Answered: http://www.panynj.gov/wtcprogress/q_a_intro.cfm

In bold are the questions of the spacers in between the glass on the first floor, and as to the waviness of the glass, as well as other cool stuff.

Lynda Tollner is a program director in the World Trade Center Construction Department with design and construction responsibilities for One World Trade Center.

Ms. Tollner has more than 25 years of experience in project management and structural engineering and has worked for the Port Authority for seven years. In the past, she has managed design and construction of a variety of commercial, institutional and transportation facilities including projects at LaGuardia and Newark Liberty International airports and the Port Authority's current headquarters at 225/233 Park Avenue South.

One World Trade Center is scheduled for completion at the end of 2013.

(Note: We received more than 40 questions in response to our "Ask the PA" feature on One World Trade Center. Some of the questions were repetitive, so to avoid redundancy, we eliminated several of them).

Q. When do you anticipate that 1 WTC steel installation will exceed 7 WTC in height? – John, Washington, WA

A. John, we are getting real close. We expect to exceed the height of 7 WTC in February. Right now, we are on the 56th floor.

Q. What do you see as the greatest challenges looking forward toward completion of 1 WTC? – Mike, Moravia, N.Y.

A. We encounter challenges with this project every day and our staff works diligently to meet each and every one of them. Perhaps the greatest challenge we will face in the future is the construction of the 408-foot antenna concurrent with the completion of the roof and the rooftop mechanical systems. Essentially, we will be undertaking two separate projects simultaneously in very limited space.

Q. When do you expect 1 WTC to become the tallest structure downtown, as well as in New York City? Also, why does the first floor of glass skip to every other piece, and finally when will the plaza finishes begin? – Anthony, Commack, N.Y.

A. We anticipate 1 World Trade Center will be the tallest structure downtown by mid-summer when it surpasses the Beekman Tower, and the tallest in the City when it surpasses the Empire State Building by the end of this year. The missing panels of glass on the 20th floor were left out intentionally to accommodate supports for the protection required for the curtain wall glass installation.

Q. When I visited last week, I noticed something strange with the glass. The reflections of things close to the building are very clear, but buildings and objects that are far away seem to be wavy and odd. Is this because the glass has just started to go in? Is there a film on the glass? – George, Philadelphia, PA

A. George, there is no film on the glass. Once the building is fully enclosed and pressurized, the wavy reflection will be reduced.


Q. About what floor will 1 WTC reach by the 9/11/11 anniversary, and what floor will it reach by the end of 2011? – Michael, East Brunswick, N.J.

A. We expect to have steel up to a floor in the mid-80s by the 10th anniversary later this year and near the 104th floor by the end of the year.

Q. There appears to be vents in the façade that cover the large mechanical floors near the top of the building. These mechanical floors and vents also appear to correspond to the original impact site of Flight 11. Is this deliberate or simply a coincidence? – Kyle, Fargo, ND

A. If there is an alignment, as you say, it definitely was not intentional.

Q. How long will it take to reach the 75th floor? – Peter, Verona, N.J.

A. Our goal is to build one floor a week. Given that schedule, we expect to be at the 75th floor in about 22 weeks.

Q. When will the base of 1 WTC by completed in concrete, and how will this process happen? – Zack, Elkton, MD

A. Concrete work at the base of the tower is proceeding, but it must be carefully staged so that it does not interfere with other trades and delivery logistics at the base. Portions of the concrete wall will be done later so that various trades can drive trucks into the lobbies for materials deliveries. For example, all of the elevator rails are being delivered to the North Lobby. Fireproofing materials are delivered to the South Lobby.

Q. Does 1 WTC use the tube-frame structure system like the original Twin Towers? – Benjamin, Canberra, AK

A. No, it does not. 1 WTC involves a building system that consists of a steel frame and a concrete core.

Q. Since the tower is coming closer to being topped out, will there be a topping out ceremony toward the end of the year? – Dominic, Grants, NM

A. We anticipate the tower will be topping out in early 2012. Our focus right now is getting the tower built. When the time comes, we will focus on whatever announcements or ceremony is appropriate. For now, it's just build, build, build.

Q. 1 WTC seems about five floors shorter from street level than the neighboring 7 WTC, which claims a height of 52 floors. Why the difference in height and number of floors? – Josh, New York, N.Y.

A. The number of floors in office buildings does not correspond to a specific height. For example, the first office floor in 1 World Trade Center is the 20th floor, which is approximately 180 feet above street level. However, there are only nine floor slabs between the lobby and the 20th floor, which will accommodate the tower's mechanical systems.

Q. When will the glass façade for the base of 1 WTC be in place? – Tyler, New York, N.Y.

A. Installation of the podium wall glass will begin in early 2012. This work must be staged later to allow the tower's hoists to remain in place, so the podium glass won't be completed until the 2nd quarter of 2013.

Q. I was just wondering when the curtain wall will start on the mechanical floors under the 20th floor? – Spencer, Montreal, N.Y.

A. Just to be clear, the curtain wall and the podium wall glass are not the same. The curtain wall glass is currently being installed from the 20th floor to the top of the building, while the podium wall glass for the bottom 20 floors is in fabrication, with installation to begin in early 2012.

Q. I know that some steel recovered from the site after 9/11 was used to build the U.S.S. New York. Is any of the steel being used to build the new tower? – Joshua, Sparrows Point, MD

A. No. However, there will be two of the massive steel tridents that were part of the original World Trade Center towers on display in the Memorial Pavilion.

Q. When will the spire go on 1 WTC and how long will it take for the spire to be installed? – Logan, New York, N.Y.

A. Installation of the tower's spire will begin in mid 2012, and will take approximately six months to complete.

Q. I noticed a crane on the northwest corner of the building. What will this crane be used for? – Holmdel, N.J.

A. The “slider crane” on the northwest corner of the building is used by the concrete contractor to convey reinforcement and other materials into the building and to remove debris.

Q. How often do shipments of glass arrive at the World Trade Center site? – Erik, Baltimore, MD

A. The curtain wall panels are loaded into shipping containers in Portland, Oregon and shipped by rail to North Jersey, where they are placed on trucks for delivery to the site. We receive one major delivery at the site each week.

Q. Is it true that 1 WTC will top out this year? – Steven, San Diego, CA

A. We expect 1 World Trade Center will top out in early 2012.

Q. I noticed that the crane on the northwest portion of 1 WTC is still attached to the building and no glass panels have been installed on that section of the tower. When will the crane be disassembled in order for the glass to be put up? – Michael, East Brunswick, N.J.

A. As the slider crane moves up the building, the temporary steel on the lower floors is being removed so that the curtain wall installation can continue on this corner.

Q. How many workers are working at 1 World Trade Center at any given time? – Joe, Brooklyn, N.Y.

A. Currently, the total manpower of all of the trades is approximately 1,100 people.

Q. What brand of elevators will be used in 1 World Trade Center? What brand of chillers will be used? – Bob, Louisville, KY

A. Thyssen-Krup will provide 70 elevators and 9 escalators for 1 World Trade Center. There are no chillers in the building. McQuay is providing the self-contained direct expansion air conditioning units on each floor.
     
     
  #12132  
Old Posted Jan 27, 2011, 11:02 PM
STR's Avatar
STR STR is offline
Because I'm Clever!
 
Join Date: Oct 2004
Location: Chicago, Illinois
Posts: 5,078
Kind of cool that building pressurization will alter the glass panes. Makes sense, though it's unintuitive. You just don't expect glass to flex like that, but it does. Makes me wonder if temperature is a factor as well, and that it will "clear up" as things get warmer, since the glass won't be below freezing on both sides ever again.

One more thing I'd have added to this:
Quote:
The number of floors in office buildings does not correspond to a specific height. For example, the first office floor in 1 World Trade Center is the 20th floor, which is approximately 180 feet above street level. However, there are only nine floor slabs between the lobby and the 20th floor, which will accommodate the tower's mechanical systems.
The office floors on 1WTC are shorter than the office floors in the other buildings, only 2," but over 80 of them it adds up to half a story.
__________________
There are six phases to every project 1) enthusiasm, 2) disillusionment, 3) panic, 4) search for the guilty, 5) punishment of the innocent, 6) praise for the non-participants. - Guy Tozzoli
Build your own Model Skyscrapers** New York City 2015 3D Model W/ New WTC ** World Trade Center (1971-2001) 3D Model
     
     
  #12133  
Old Posted Jan 27, 2011, 11:48 PM
Innsertnamehere's Avatar
Innsertnamehere Innsertnamehere is offline
Registered User
 
Join Date: Jan 2010
Location: Hamilton
Posts: 12,809
how much you want to bet that some of those questions where asked by people on this website?
     
     
  #12134  
Old Posted Jan 28, 2011, 1:06 AM
Zensteeldude Zensteeldude is offline
Honored Member
 
Join Date: Jul 2009
Location: Northern New Jersey
Posts: 692
Quote:
Originally Posted by STR View Post
Kind of cool that building pressurization will alter the glass panes. Makes sense, though it's unintuitive. You just don't expect glass to flex like that, but it does. Makes me wonder if temperature is a factor as well, and that it will "clear up" as things get warmer, since the glass won't be below freezing on both sides ever again.

One more thing I'd have added to this:


The office floors on 1WTC are shorter than the office floors in the other buildings, only 2," but over 80 of them it adds up to half a story.
They are full of it, do you know how many psi it takes to flex 3 layers of 1/2 inch thick glass ? Two of those layers are laminated ! The distortions we are seeing are not uniform over the width of the pain. no amount of pressurization will remove those distortions.
     
     
  #12135  
Old Posted Jan 28, 2011, 2:32 AM
STR's Avatar
STR STR is offline
Because I'm Clever!
 
Join Date: Oct 2004
Location: Chicago, Illinois
Posts: 5,078
I was thinking more of the temperature difference than anything. Generally, pressurization=heating and other air conditioning, which would cause a minute amount of thermal expansion, not generally noticeable, but since the reflections are caused by a layer that varies by a fraction of a mm, might be enough.

I'm not sure what that would do with a triple-pane insulated window. Are all 3 layers glazed? Might see a bit of difference. If the glazing is applied to only the out layer, I don't think it would, as it's supposed to be insulated.

But I'll defer to you. Either/or really.
__________________
There are six phases to every project 1) enthusiasm, 2) disillusionment, 3) panic, 4) search for the guilty, 5) punishment of the innocent, 6) praise for the non-participants. - Guy Tozzoli
Build your own Model Skyscrapers** New York City 2015 3D Model W/ New WTC ** World Trade Center (1971-2001) 3D Model
     
     
  #12136  
Old Posted Jan 28, 2011, 2:37 AM
N830MH N830MH is offline
Registered User
 
Join Date: Jan 2011
Location: Phoenix, AZ
Posts: 3,104
Quote:
Originally Posted by NYguy View Post
Wow!! Its looks great!! I can't wait to be completions done in end of 2013. I am looking forward to it.
     
     
  #12137  
Old Posted Jan 28, 2011, 3:23 AM
NYguy's Avatar
NYguy NYguy is offline
New Yorker for life
 
Join Date: Jul 2001
Location: Borough of Jersey
Posts: 56,649
Quote:
Installation of the tower's spire will begin in mid 2012, and will take approximately six months to complete.
Wow, didn't expect it would take that long, but it's a huge and massive spire.
__________________
NEW YORK is Back!

“Office buildings are our factories – whether for tech, creative or traditional industries we must continue to grow our modern factories to create new jobs,” said United States Senator Chuck Schumer.
     
     
  #12138  
Old Posted Jan 28, 2011, 4:59 AM
Acer1 Acer1 is offline
Registered User
 
Join Date: Apr 2009
Posts: 73
Knowing that the weather is bad for erecting steel, but does anyone know if this allows the concrete crew to 'catch up' a little at least? This way the steel can be put up at a little faster pace than normal once the weather improves, correct?
     
     
  #12139  
Old Posted Jan 28, 2011, 5:18 AM
Don098 Don098 is offline
BANNED
 
Join Date: Nov 2007
Location: Rosslyn, VA
Posts: 1,179
Quote:
Originally Posted by Zensteeldude View Post
They are full of it, do you know how many psi it takes to flex 3 layers of 1/2 inch thick glass ? Two of those layers are laminated ! The distortions we are seeing are not uniform over the width of the pain. no amount of pressurization will remove those distortions.
Yea, that's expansion vs. contraction...not air pressure...? You ok today Zen?
     
     
  #12140  
Old Posted Jan 28, 2011, 5:27 PM
meh_cd meh_cd is offline
Registered User
 
Join Date: Jul 2008
Posts: 571
That woman has been wrong in the past, but at least she answers the questions I send in.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
 

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture > Completed Project Threads Archive
Forum Jump



Forum Jump


All times are GMT. The time now is 10:18 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.