  #101  
Old Posted Oct 16, 2007, 4:09 AM
ConstruktPhx ConstruktPhx is offline
Registered User
 
Join Date: Sep 2007
Posts: 8
Word is that the OCPE tower crane is coming straight from the 44 Monroe job.
Reply With Quote
     
     
  #102  
Old Posted Oct 16, 2007, 4:21 AM
plinko's Avatar
plinko plinko is offline
them bones
 
Join Date: Jul 2001
Location: Santa Barbara adjacent
Posts: 7,705
Quote:
Originally Posted by HX_Guy View Post
Does anyone know what the "S-2" and "B" mean for the Occupancy? And then there is a number for occupant...so are all the floors already assigned to occupants or what do these numbers mean?
'S-2' is the building code designation for occupancy for a parking structure. 'B' is for office. Those two terms basically give the architects and engineers a roadmap for construction type, fire ratings, load factors, etc.

The number of occupants by floor shown are based on square footage divided by load factor (for B occupancy it's 1 occupant per 100SF). So the office floors have a maximum allowable occupancy of between 254 and 270. Those numbers tell you how big the stairs need to be, how many exits required, and so on.
__________________
Even if you are 1 in a million, there are still 8,000 people just like you...
Reply With Quote
     
     
  #103  
Old Posted Oct 16, 2007, 5:33 AM
HX_Guy HX_Guy is offline
Registered User
 
Join Date: May 2006
Posts: 5,103
Thanks for the info, I had no idea that's what it had to do with.
Reply With Quote
     
     
  #104  
Old Posted Oct 16, 2007, 1:50 PM
sundevilgrad's Avatar
sundevilgrad sundevilgrad is offline
Registered User
 
Join Date: Oct 2006
Posts: 736
Quote:
Originally Posted by ConstruktPhx View Post
Word is that the OCPE tower crane is coming straight from the 44 Monroe job.
That's cool. Who's your source?
Reply With Quote
     
     
  #105  
Old Posted Oct 17, 2007, 6:14 AM
gymratmanaz gymratmanaz is offline
Registered User
 
Join Date: Aug 2007
Posts: 2,933
HEY, I just passed One Central Park East and ....THERE ARE BIG PIECES OF DIGGING EQUIPMENT THERE, AND THE PARKING LOT ASPHAULT IS DUG UP.......Something is starting to happen!!!!!!!!
Reply With Quote
     
     
  #106  
Old Posted Oct 17, 2007, 7:17 AM
HX_Guy HX_Guy is offline
Registered User
 
Join Date: May 2006
Posts: 5,103
I think I need to stop by tomorrow and snap some photos. I'm dying to go up to the Chase parking garage and take some shots from there, it's a perfect view of the site and will make for good pictures as this progresses.
Reply With Quote
     
     
  #107  
Old Posted Oct 20, 2007, 3:39 PM
gymratmanaz gymratmanaz is offline
Registered User
 
Join Date: Aug 2007
Posts: 2,933
You are the man HX_Guy!
Reply With Quote
     
     
  #108  
Old Posted Oct 20, 2007, 5:00 PM
HX_Guy HX_Guy is offline
Registered User
 
Join Date: May 2006
Posts: 5,103
And it begins!


Reply With Quote
     
     
  #109  
Old Posted Oct 20, 2007, 7:37 PM
gymratmanaz gymratmanaz is offline
Registered User
 
Join Date: Aug 2007
Posts: 2,933
You go HX_Guy...You're a busy boy!
Reply With Quote
     
     
  #110  
Old Posted Oct 20, 2007, 10:49 PM
HooverDam's Avatar
HooverDam HooverDam is offline
Registered User
 
Join Date: Apr 2006
Location: Country Club Park, Greater Coronado, Midtown, Phoenix, Az
Posts: 4,610
Cool shots HX_guy. Just double checking on this, CPE isn't taking up the entire block from the south to the north, right? It'll just take up the south half of the block and they can use the north half for staging and things? (Or perhaps in the future another tower could be built there)
Reply With Quote
     
     
  #111  
Old Posted Oct 21, 2007, 3:09 AM
ConstruktPhx ConstruktPhx is offline
Registered User
 
Join Date: Sep 2007
Posts: 8
Quote:
Originally Posted by sundevilgrad View Post
That's cool. Who's your source?
I work for a company involved in the project.
Reply With Quote
     
     
  #112  
Old Posted Oct 21, 2007, 5:56 AM
sundevilgrad's Avatar
sundevilgrad sundevilgrad is offline
Registered User
 
Join Date: Oct 2006
Posts: 736
Quote:
Originally Posted by ConstruktPhx View Post
I work for a company involved in the project.
That's about as good as it gets! Thanks for posting.
Reply With Quote
     
     
  #113  
Old Posted Oct 21, 2007, 7:47 AM
HX_Guy HX_Guy is offline
Registered User
 
Join Date: May 2006
Posts: 5,103
Quote:
Originally Posted by ConstruktPhx View Post
Word is that the OCPE tower crane is coming straight from the 44 Monroe job.
I'm surprised that the tower will only be using once tower crane. It seems that it will span the whole block from east to west, similar to the Sheraton, that that uses two tower cranes.
Reply With Quote
     
     
  #114  
Old Posted Oct 21, 2007, 5:01 PM
DracoCaifan's Avatar
DracoCaifan DracoCaifan is offline
The Lizard King
 
Join Date: Jan 2003
Location: Phoenix, Az
Posts: 363
Yay!! Less parking lots and more buldings in dowtown... I like to see that more often..... Thanks for da pics!!
__________________
If the doors of perception were cleansed, everything would appear to man as it truly is, INFINITE.
Reply With Quote
     
     
  #115  
Old Posted Oct 21, 2007, 8:00 PM
AZ KID's Avatar
AZ KID AZ KID is offline
Registered User
 
Join Date: Sep 2007
Location: Phoenix
Posts: 440
So im under the impression that once OCPE starts going vertical it will move very quick. Is that true???
Reply With Quote
     
     
  #116  
Old Posted Oct 21, 2007, 8:17 PM
tempedude tempedude is offline
Dbacks baby!
 
Join Date: Sep 2007
Location: Tempe/metro Phoenix
Posts: 812
Quote:
Originally Posted by AZ KID View Post
So im under the impression that once OCPE starts going vertical it will move very quick. Is that true???
It will be quicker than say.... how fast the Sheraton or Center Point Towers rose from the street.
Reply With Quote
     
     
  #117  
Old Posted Oct 21, 2007, 9:50 PM
HX_Guy HX_Guy is offline
Registered User
 
Join Date: May 2006
Posts: 5,103
Quote:
Originally Posted by HooverDam View Post
Cool shots HX_guy. Just double checking on this, CPE isn't taking up the entire block from the south to the north, right? It'll just take up the south half of the block and they can use the north half for staging and things? (Or perhaps in the future another tower could be built there)

Not only is it not taking up the whole block south to north, it might not even be taking up the whole block from east to west. I was under the assumption it would span the block from the eastern edge to the western edge, as thats what it looks like in the rendering, but looking at the new site plat, it looks like they are building on "Lot 1" which stops 50' from Central. This would also fall in line with them only needing one tower crane and not two like the Sheraton.



If you take a look at the original Central Park East rendering, this also falls in line with the same plan where the shorter tower stopped short of Central and the taller tower had a section that went all the way to Van Buren.




Last edited by HX_Guy; Oct 21, 2007 at 10:54 PM.
Reply With Quote
     
     
  #118  
Old Posted Oct 21, 2007, 10:10 PM
ljbuild ljbuild is offline
Registered User
 
Join Date: Apr 2007
Posts: 283
Quote:
Originally Posted by HX_Guy View Post
I think I need to stop by tomorrow and snap some photos. I'm dying to go up to the Chase parking garage and take some shots from there, it's a perfect view of the site and will make for good pictures as this progresses.

Careful when you go up there (in the chase tower), because I wanted to do the same thing and they didnt want me to take pictures there because of some security issues.
I had insisted that I wasnt there to do anything malicious, and wanted to proceed with my snapshots.
But they had said if I did they would call the police. So I left and started thinking of another site.
HOWEVER if you make it up in there without any harassments, let me know and I will follow the route you took.
Reply With Quote
     
     
  #119  
Old Posted Oct 22, 2007, 12:18 AM
HooverDam's Avatar
HooverDam HooverDam is offline
Registered User
 
Join Date: Apr 2006
Location: Country Club Park, Greater Coronado, Midtown, Phoenix, Az
Posts: 4,610
Great info HX_Guy, that looks like it leaves a lot of room for future development. Perhaps ASU will use some of that space as their campus expands.

EDIT: VVV Do you have anything that states when each phase starts? Or is nothing concrete yet? I'd assume that the dorms and the journalism school are part of Phase 2, with the Ramada Inn and redoing the other buildings were phase 1, right?

Last edited by HooverDam; Oct 22, 2007 at 3:36 AM.
Reply With Quote
     
     
  #120  
Old Posted Oct 22, 2007, 3:15 AM
combusean's Avatar
combusean combusean is offline
Skyriser
 
Join Date: Dec 2004
Location: CA/AZ Nomad
Posts: 7,440
^ Yes... it's in the development agreement. It directs the developers to enter into negotiations to build 200,000 square feet of shell space as part of a new development during Phase III of the campus buildout, which is many years away.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > United States > Southwest
Forum Jump



Forum Jump


All times are GMT. The time now is 7:35 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.