  #1161  
Old Posted May 6, 2014, 2:52 PM
christof christof is offline
Registered User
 
Join Date: Apr 2006
Location: Philadelphia, PA
Posts: 559
Quote:
Originally Posted by domodeez View Post
Yes, indeed. I cannot wait until that surface parking lot is replaced with something worthy of the location. I do wish Penn had a similar vision to develop portions of Penn Park along the South Street Bridge east of Franklin Field and the UCity Regional Rail stop. Perhaps that's a job for Penn Connects 3.0.
Penn has long term plans for the fields below South Street. Those fields are suppose to be developed as new medical buildings.
     
     
  #1162  
Old Posted May 6, 2014, 3:50 PM
domodeez domodeez is offline
Registered User
 
Join Date: Apr 2014
Posts: 518
Quote:
Originally Posted by christof View Post
Penn has long term plans for the fields below South Street. Those fields are suppose to be developed as new medical buildings.
Yes, but nothing abutting South Street Bridge where the fields narrow and are under-utilized. I would love to see that happen as well.
     
     
  #1163  
Old Posted May 8, 2014, 7:25 PM
summersm343's Avatar
summersm343 summersm343 is offline
Moderator
 
Join Date: Oct 2011
Location: Philadelphia
Posts: 18,462
Apparently two floors have been added which brings the height up to 49 floors and 683 feet. Thanks to sayitaintso for the info!
     
     
  #1164  
Old Posted May 9, 2014, 1:33 AM
shakman's Avatar
shakman shakman is offline
Chairman
 
Join Date: Jun 2002
Location: PRMD - People's Republic of Maryland
Posts: 2,688
Quote:
Originally Posted by summersm343 View Post
Apparently two floors have been added which brings the height up to 49 floors and 683 feet. Thanks to sayitaintso for the info!
is 683 ft confirmed or a guess?
__________________
"I measure the value of life not by how much I have, instead by what I have done.

-sb
     
     
  #1165  
Old Posted May 9, 2014, 2:29 AM
summersm343's Avatar
summersm343 summersm343 is offline
Moderator
 
Join Date: Oct 2011
Location: Philadelphia
Posts: 18,462
Quote:
Originally Posted by shakman View Post
is 683 ft confirmed or a guess?
A guess using mathematical estimation I guess haha

The 49 floors is confirmed
     
     
  #1166  
Old Posted May 9, 2014, 2:29 AM
summersm343's Avatar
summersm343 summersm343 is offline
Moderator
 
Join Date: Oct 2011
Location: Philadelphia
Posts: 18,462
Steel for the parking garage is complete which means they should be able to start on FMC now

     
     
  #1167  
Old Posted May 9, 2014, 3:04 AM
Philly Fan Philly Fan is offline
Registered User
 
Join Date: Feb 2013
Posts: 2,523
Quote:
Originally Posted by summersm343 View Post
A guess using mathematical estimation I guess haha

The 49 floors is confirmed
Well, it hasn't been publicly confirmed. It's just what sayitaintso says is "inside info." Which doesn't mean that it's not true.
     
     
  #1168  
Old Posted May 9, 2014, 3:11 PM
GarCastle GarCastle is offline
Registered User
 
Join Date: Feb 2006
Posts: 469
If it's going from 830ksf to 870ksf, then that does sound like only 2 floors. I guess it would depend where they are adding the additional space. If at the top where it is tapered quite a bit it could be more floors. If they added that space near the base it may be only 2 floors since some floors are 25,000 sf each (UPenn's 100ksf was quoted as four floors presumably lower in the building where it is wider). But "several" indeed sounds like more than a "few" which is typically at least 3-4.

To complicate our guessing more, the office space is going from 575k to 635k so office space is going up 60ksf but the building is only gaining 40ksf so they must be shifting other things around as well to allow for something being converted from whatever it is to 20ksf of office space. (sounds like 6,000sf of retail space was lost and 8 apartments were lost at the least)

I can't see how Penn would not increase their agreed upon 100ksf in this building. Especially if they really do mean to empty Penn Tower starting soon and if they really do want to empty out their non-clinical leased buildings on Market Street (3001/3101/3535/etc).

Cheers,
G.

Some more detail (http://www.cnbc.com/id/101630162) from previously posted stats:
As previously announced, we are underway with the development of FMC Tower at Cira Centre South, a trophy class, mixed-use office tower designed by the architectural firms of Pelli Clark Pelli and Bower Lewis Thrower to be located at the southern end of our Cira Centre complex in University City. Upon completion, FMC Tower at Cira Centre South will approximate 870,000 rentable square feet comprising 635,000 square feet of office space, 4,000 square feet of retail space and 268 luxury apartment suites, of which up to 100 units will be fully furnished with concierge services and the balance to be market rate rental apartments. Given the increased size of the project, our total anticipated investment is $385 million including all costs to complete the furnished residential units. Brandywine has executed a 16-year lease with FMC for 280,000 square feet including their recent expansion and a 20-year lease with the University of Pennsylvania for 100,000 square feet, resulting in total office pre-leasing of 60%. Groundbreaking will occur in the second quarter of 2014 with completion scheduled for June 2016. Initial funding of the development will be from available corporate funds with a review underway of other institutional debt and/or equity sources.

As part of our Cira South master plan, we are developing a one-acre elevated park known as Cira Green creating a roof on the Cira South Garage directly between the FMC Tower at Cira Centre South and evo properties at Cira Centre South. Cira Green will be completed in the third quarter of 2014, and extends the recreational green belt created by the Schuylkill River Trail and Penn Park and will be an outstanding amenity for the entire University City neighborhood. We will fund the $11.3 million cost of Cira Green from available corporate funds and $1.5 million has been funded as of March 31, 2014.
__________________
"I don't need the city, it never cared for me." - Neuroticfish.
     
     
  #1169  
Old Posted May 9, 2014, 6:19 PM
shakman's Avatar
shakman shakman is offline
Chairman
 
Join Date: Jun 2002
Location: PRMD - People's Republic of Maryland
Posts: 2,688
Instead of guessing, let's wait for the facts.
__________________
"I measure the value of life not by how much I have, instead by what I have done.

-sb
     
     
  #1170  
Old Posted May 9, 2014, 6:58 PM
Philly Fan Philly Fan is offline
Registered User
 
Join Date: Feb 2013
Posts: 2,523
Quote:
Originally Posted by shakman View Post
Instead of guessing, let's wait for the facts.
That's too easy.
     
     
  #1171  
Old Posted May 10, 2014, 2:40 AM
summersm343's Avatar
summersm343 summersm343 is offline
Moderator
 
Join Date: Oct 2011
Location: Philadelphia
Posts: 18,462
They were using this site as a staging area for Evo and the garage extension. It seems they have now cleared the lot of all staging materials and have started moving dirt around:



They have also removed the Evo facade mock-up. I assume the next stage would be to demolish this structure that faces the train tracks.

     
     
  #1172  
Old Posted May 10, 2014, 7:52 AM
shakman's Avatar
shakman shakman is offline
Chairman
 
Join Date: Jun 2002
Location: PRMD - People's Republic of Maryland
Posts: 2,688
Will the parking structure be used by both towers?
__________________
"I measure the value of life not by how much I have, instead by what I have done.

-sb
     
     
  #1173  
Old Posted May 10, 2014, 11:38 AM
Philly Fan Philly Fan is offline
Registered User
 
Join Date: Feb 2013
Posts: 2,523
Quote:
Originally Posted by shakman View Post
Will the parking structure be used by both towers?
Yes, and also by the IRS building (old post office).
     
     
  #1174  
Old Posted May 10, 2014, 3:03 PM
Plokoon11 Plokoon11 is offline
Registered User
 
Join Date: Jun 2007
Posts: 1,698
Didn't realize that structure existed, shouldn't take long to take that down. But exciting!
     
     
  #1175  
Old Posted May 10, 2014, 5:59 PM
Philly Fan Philly Fan is offline
Registered User
 
Join Date: Feb 2013
Posts: 2,523
Quote:
Originally Posted by summersm343 View Post
I assume the next stage would be to demolish this structure that faces the train tracks.


Looks to me like that may be staying, albeit with new facing on the east side and perhaps a green roof of some sort.

Compare that photo with this:



and this:

https://www.google.com/maps/@39.951876,-...3m4!1e1!3m2!1sqf097DFVKm9Izfh3RK5eVg!2e0

and this:

https://www.google.com/maps/@39.951703,-...3m4!1e1!3m2!1sVCpdl2MV1rcJhfueE7qivw!2e0

and notice how the east side of the structure aligns in all four views with the east side of the adjoining garage.
     
     
  #1176  
Old Posted May 10, 2014, 6:28 PM
Plokoon11 Plokoon11 is offline
Registered User
 
Join Date: Jun 2007
Posts: 1,698
^ Yeah you may be right. There going to keep it most likely. (Which means faster progress.)
     
     
  #1177  
Old Posted May 10, 2014, 7:23 PM
Philly Fan Philly Fan is offline
Registered User
 
Join Date: Feb 2013
Posts: 2,523
Quote:
Originally Posted by Plokoon11 View Post
Yeah you may be right. There going to keep it most likely. (Which means faster progress.)
And it actually appears to be part of the garage structure:

http://www.facilities.upenn.edu/maps?glid=698
     
     
  #1178  
Old Posted May 10, 2014, 8:01 PM
summersm343's Avatar
summersm343 summersm343 is offline
Moderator
 
Join Date: Oct 2011
Location: Philadelphia
Posts: 18,462


There was another structure similar to this on the Evo lot and that was demolished. I just assume that this structure will be demolished too. Guess we'll see!
     
     
  #1179  
Old Posted May 10, 2014, 8:45 PM
Philly Fan Philly Fan is offline
Registered User
 
Join Date: Feb 2013
Posts: 2,523
Quote:
Originally Posted by summersm343 View Post


There was another structure similar to this on the Evo lot and that was demolished. I just assume that this structure will be demolished too. Guess we'll see!
That structure wasn't completely demolished, was it? I thought it was just incorporated into the building:




And the east side of the Evo is parallel with the east side of the garage, so that part of the building actually sits on top of the structure that was connected to the garage. The east side of the FMC Tower, on the other hand, is set back from the east side of the garage, and will not be built over the comparable structure on that side. At least that's how I interpret the renderings and photos.

Maybe we should start a betting pool on whether the mystery structure on the FMC side stays, or goes.

Last edited by Philly Fan; May 10, 2014 at 10:55 PM.
     
     
  #1180  
Old Posted May 11, 2014, 11:45 AM
SJPhillyBoy's Avatar
SJPhillyBoy SJPhillyBoy is offline
Hello
 
Join Date: Dec 2002
Location: SJ to Philly
Posts: 2,631
New corporate tower will raise FMC's visibility
Read more at http://www.philly.com/philly/business/20...MC_s_visibility.html#wTI17PCzUlSew4r7.99

Quote:
Groundbreaking for the 49-story, $341 million tower is set for Wednesday. Completion is expected by mid-2016. At that point, FMC will move 545 employees from 1745 Market St.
Quote:
Between the two buildings is a 1,600-car garage, which Brandywine is topping with a one-acre sward of green space accessible from both towers, as well as from street level.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
 

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture > Completed Project Threads Archive
Forum Jump



Forum Jump


All times are GMT. The time now is 4:48 AM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.