^^^ I used to frequent Broadway... the 99 is very fast in the evening and beyond because of reduced traffic, making it very attractive. Even the local 9 bus is pretty fast in the evening. You should try it one day, Broadway Station to MacDonald takes no more than 15 minutes at the slowest.
Quote:
Originally Posted by mr.x
2016 - Double-tracking of West Coast Express for frequent bi-directional all-day service seven days a week
2020 - Fraser Valley LRT network
2026 - North Fraser DMU LRT (Marine Drive Station to New Westminster Station)
2028 - Main Street and Kingsway streetcars
2030 - Arbutus LRT
2032 - 41st Avenue LRT/streetcar (Joyce to UBC)
|
If I could comment, CP Rail owns the entire right of way so West Coast Express could agree to some sort of lease and build a third track on the right of way (CP Rail only have 2) which they have access to at all hours and lease track time on the general CP Rail tracks as needed during rush hour when they run trains at greater frequencies. If they run the trains hourly during the day, they could get away with a few passing tracks. A train would leave Mission say 10:27, get to Waterfront 11:40, dwell for 10 minutes, and return to Mission at 1:03. This train would pass a Mission bound train at 11:15 exactly at Port Moody Station, pass a Waterfront bound train at 12:15 at Port Moody Station, and pass a Waterfront bound train at 12:45 - exactly at Port Haney Station. My goodness this couldn't be any more perfect! The only problem is finding space for the extra tracks and platform at these stations.
Quote:
Originally Posted by Spork
I think we need to take up a new name to represent our cause, playing off of the name that 'zweisystem' has given himself/herself. How about "dasrichtigesystem"? Implying that all that 'zweisystem' cares about is his/her own special interest.
|
zwei = two in Old High German... so twosystem? lol.
Quote:
Originally Posted by WarrenC12
Hahaha the famous "forever". Although it's true that UBC and the airport are obvious ends, it could always be extended to Langley, Evergreen could continue to Maple Ridge, and the Canadaline could keep going south from the Richmond terminus. Nobody knows what this place will look like in 60 years. 
|
Well more like a moratorium on any new or extended Skytrain (including Canada Line, lol) lines in favour of LRTs that will provide additional corridor connections to supplement our metro system which would include all the LRT and streetcar lines mentioned by mr.x. Once the LRT networks are done and additional ridership strains the transit system, new or extended Skytrain lines, commuter rail lines, and even heavy rail based Metro lines would be built. This is all piecework, a huge shift of modeshare to transit will not happen overnight. I'd be happy if the number reached 30% in my lifetime.