HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Global Projects & Construction > City Compilations


Reply

 
Thread Tools Display Modes
     
     
  #11741  
Old Posted Oct 6, 2023, 4:14 PM
homebucket homebucket is online now
你的媽媽
 
Join Date: Jan 2012
Location: The Bay
Posts: 9,586
Looks like this one is complete.

Quote:
Affordable Housing Opens By Balboa Park BART Station, San Francisco

BY: ANDREW NELSON 5:30 AM ON OCTOBER 6, 2023

The project team and city officials gathered last week to celebrate the grand opening of Kapuso at the Upper Yard, a nine-story affordable housing project at 2340 San Jose Avenue in San Francisco’s Outer Mission neighborhood. The project has created 131 low- to moderate-income family homes on public land owned by BART and developed in partnership with Related and the Mission Housing Development Corporation. State Senator Scott Wiener, author of Senate Bill 35, which provided Kapuso a clear path for approval, attended the event.

State Senator Scott Wiener, having plenty to celebrate with the opening of this transit-adjacent project, said, “SB 35 has been a game changer in expediting housing approvals. This project is proof that San Francisco can turn the tide toward building the housing we need after decades of obstruction. We have a long way to go to fully address our affordability challenges, but we now have powerful tools to support local leaders in tackling this critical problem.”

Ann Silverberg of Related California underscored the remarks by Senator Wiener, saying, “as one of the first projects to use SB 35, Kapuso at the Upper Yard is a testament to the power and impact of the state’s new entitlement streamlining tools.” According to the Mayor’s office, San Francisco has seen over 3,000 apartments, including 2,600 affordable housing units, approved under Senate Bill 35.

Speaking at the event, Mayor London Breed spotlight the project’s proximity to BART and Muni light rail, stating that “by repurposing this underutilized parking lot into more than 131 new homes, we are doubling down on our commitment to increase public transit ridership and provide improved services for our residents.” BART Board President Janice Li said, “building affordable housing on public land right at a transit hub is a monumental achievement that will keep working families here in our city.”

The 90-foot tall structure contains around 175,000 square feet with 160,000 square feet for housing, 1,240 square feet for bicycle parking, and 10,000 square feet for five commercial spaces. Of the 131 units, apartment sizes will range from studios to three bedrooms. Mithun is the project architect, and Cahill is the general contractor. The building’s facade is clad with cement plaster, painted metal, and masonry. The articulated exterior helps to visually break up the massing and soften the building scale visually.

Apartments will be designated as affordable to households earning between 40% and 108% of the Area’s Median Income. For more information about how to apply, visit San Francisco’s DAHLIA Housing Portal website here.
https://sfyimby.com/2023/10/affordab...francisco.html
Reply With Quote
     
     
  #11742  
Old Posted Oct 6, 2023, 4:21 PM
homebucket homebucket is online now
你的媽媽
 
Join Date: Jan 2012
Location: The Bay
Posts: 9,586
Reply With Quote
     
     
  #11743  
Old Posted Oct 9, 2023, 10:10 PM
homebucket homebucket is online now
你的媽媽
 
Join Date: Jan 2012
Location: The Bay
Posts: 9,586
Quote:
Construction Rising For Affordable Housing In SoMa, San Francisco



BY: ANDREW NELSON 5:30 AM ON OCTOBER 9, 2023

Concrete has passed the halfway point for the new affordable housing complex rising at 600 7th Street in SoMa, San Francisco. The project, named 7th and Brannan, is among the biggest active sites in the city, with over 221 units to be opened once complete. Mercy Housing is the project developer.

...

Santos Prescott and Associates is the architect for 7th and Brannan. The apartment block will form a squat F-shaped floor plan with two inner-block courtyards to maximize window exposure for residents. Facade installation has not started yet but will consist of stucco, brick, slats, and smooth panels. Perforated fins will add a decorative flair to the facade, along with semi-diffused shading. The color palette is light, contrasting off-white and grey with terracotta tones.

Once complete, the 84-foot tall structure will yield 185,760 square feet, with 181,540 square feet for housing and 4,220 square feet for commercial retail. Parking will be included for 151 bicycles and no cars owing to the neighborhood’s access to walkable food and transit. Residents will have access to two landscaped courtyards on the ground level, one facing a private alley and the other in the lot interior.

...

The first residents will move in by the summer of 2024, with property management by Mercy Housing and supportive housing services by the Episcopal Community Services.
https://sfyimby.com/2023/10/construc...francisco.html
Reply With Quote
     
     
  #11744  
Old Posted Oct 9, 2023, 10:11 PM
homebucket homebucket is online now
你的媽媽
 
Join Date: Jan 2012
Location: The Bay
Posts: 9,586
Reply With Quote
     
     
  #11745  
Old Posted Oct 18, 2023, 3:23 PM
pequenosparkee pequenosparkee is offline
Registered User
 
Join Date: Jul 2022
Location: SF
Posts: 28
730 Stanyan update


Last edited by pequenosparkee; Oct 18, 2023 at 9:31 PM.
Reply With Quote
     
     
  #11746  
Old Posted Oct 18, 2023, 4:41 PM
Charmy2 Charmy2 is offline
Registered User
 
Join Date: Jan 2022
Location: San Francisco
Posts: 368
Ooh, nice crane. Might have to make a visit to Amoeba one of these days and see it in person...
Reply With Quote
     
     
  #11747  
Old Posted Oct 23, 2023, 5:42 PM
homebucket homebucket is online now
你的媽媽
 
Join Date: Jan 2012
Location: The Bay
Posts: 9,586
Quote:
An unexpected part of SF hits Time Out's World's Coolest Neighborhoods list
By Kendra Smith
Updated Oct 23, 2023 8:14 a.m.

After choosing Dogpatch for its world’s coolest neighborhoods list last year, global travel publisher Time Out couldn’t have chosen a more wildly different San Francisco neighborhood for its 2023 rundown. But it’s right there, at No. 27: The Richmond District.
https://www.sfgate.com/local/article...t-18436043.php

Here's the description:

Quote:
27. Richmond District
San Francisco, USA
The Richmond District, spanning 50 blocks in the northwest section of the city, is a microcosm of what makes San Francisco so special: natural beauty, rich culture, and incredible cuisine from every corner of the world. Bordered by Ocean Beach and rugged coastline, plus Presidio and Golden Gate Park (packed with world-class attractions and museums), stunning scenery and cultural experiences around here. The area is made up of two sub-neighbourhoods: Inner Richmond on the eastern edge, packed with bakeries, shops, bars and restaurants (including some of the best dim sum in the city), and Outer Richmond, closer to the beach and more residential (though Geary Boulevard and Balboa Street are both vibrant corridors). Booming with new openings, the Richmond District is one of the most exciting places to eat and play in San Francisco right now. Just don’t forget your hoodie.

The perfect day Join the line of customers waiting to devour flaky croissants at Arsicault Bakery, or head to James Beard Award-nominated Breadbelly for its bright green kaya toast and creative Asian coffee drinks. Afterward, stroll along Clement Street, stopping into local favorite shops like Green Apple Books. Dim sum calls for lunch – the top spot is Dragon Beaux. Walk off the calories in Golden Gate Park before dinner at the newly opened neighbourhood hotspot Pearl 6101. End the night with a movie at the historic Balboa Theatre before crashing at your Airbnb steps from Ocean Beach.

Plan your trip Time a visit with one of the annual music festivals in next-door Golden Gate Park: Outside Lands takes place in August and Hardly Strictly Bluegrass arrives in September.
https://www.timeout.com/travel/coole...s-in-the-world
Reply With Quote
     
     
  #11748  
Old Posted Oct 25, 2023, 2:59 PM
homebucket homebucket is online now
你的媽媽
 
Join Date: Jan 2012
Location: The Bay
Posts: 9,586
The specs for 2001 37th Avenue:
- 3 floors, 39 ft
- 187,200 sq ft for school/academic purposes and kitchen
- Parking for 177 bicycles

The site:
https://maps.app.goo.gl/GZ2FwQKXhetnTtCF6

Quote:
New Renderings For St Ignatius College Preparatory Campus Expansion, Sunset District



BY: ANDREW NELSON 5:30 AM ON OCTOBER 25, 2023

Revised plans have been filed for a planned expansion of St Ignatius College Preparatory Campus at 2001 37th Avenue in San Francisco’s Sunset District. The application shows continued focus on creating a new main facility for the private Catholic school overlooking Sunset Boulevard. A portion of the existing campus will be demolished.

Mark Cavagnero Associates is the project architect. The firm has overseen the design of several other buildings across the city, including the Creative Arts Building on the relatively close SFSU campus, and plans for adaptive reuse of the San Francisco Symphony Hall in Civic Center.

The sparse exterior massing will complement the existing structure with exposed concrete walls and floor-to-ceiling windows, while the west-facing facade will be adorned with vertical solar control fins. Connections will be added between all three levels of the existing building and the new structure to facilitate increased circulation.

The 39-foot-tall building will be established with a ground-level set of classrooms, a kitchen, and a practice room. The second floor will provide the anchoring space for students, The Commons. The Commons will expand across much of the floor to provide a flexible space for academic functions, events, and other needs. A double-height atrium will bring natural light from the rooftop into the space. A chapel will be included in the corner of the second floor. The third floor will include several classrooms, faculty space, and a large open room.

The new building will create 187,200 square feet with parking for 177 bicycles. This is a 150-bike increase for the school. The engineering team includes BKF, IMEG Corp, and Point Energy Innovations. Shades of Green is responsible for the landscape architecture.

The Sunset Community Garden, immediately next to the project site, will remain untouched through construction. The project is expected to cost around $100 million to build. The timeline for completion has not yet been established.
https://sfyimby.com/2023/10/new-rend...-district.html
Reply With Quote
     
     
  #11749  
Old Posted Oct 25, 2023, 2:59 PM
homebucket homebucket is online now
你的媽媽
 
Join Date: Jan 2012
Location: The Bay
Posts: 9,586
Reply With Quote
     
     
  #11750  
Old Posted Oct 25, 2023, 6:28 PM
BobbyMucho BobbyMucho is offline
Registered User
 
Join Date: Apr 2018
Posts: 261
Anyone have updates on progress at 555 Byrant? I assume construction is a few floors above ground at this point but haven't been over that way in a couple of months.
Reply With Quote
     
     
  #11751  
Old Posted Oct 26, 2023, 12:50 AM
iamfishhead iamfishhead is offline
Registered User
 
Join Date: Jul 2016
Location: San Francisco
Posts: 205
Quote:
Originally Posted by BobbyMucho View Post
Anyone have updates on progress at 555 Byrant? I assume construction is a few floors above ground at this point but haven't been over that way in a couple of months.
I was at the Utah bar next door yesterday and didn't see anything.
Reply With Quote
     
     
  #11752  
Old Posted Oct 26, 2023, 3:21 PM
homebucket homebucket is online now
你的媽媽
 
Join Date: Jan 2012
Location: The Bay
Posts: 9,586
Some nice infill incoming to the Mission.

The specs for 2675 Folsom Street:
- ~240 units
- All of the units will be affordable
- 3,500 sq ft of supportive services

The site:
https://maps.app.goo.gl/ekt86hSzCs9wkEdP7

Quote:
Affordable Senior Housing Proposed For 2675 Folsom Street, Mission District



BY: ANDREW NELSON 5:00 AM ON OCTOBER 26, 2023

Preliminary plans have been filed for over two hundred affordable senior homes at 2675 Folsom Street in San Francisco’s Mission District. The application comes after plans for a 117-unit apartment complex were approved in 2016 but never built.

The application uses Assembly Bill 2162. The bill requires planning staff to “determine if a project is eligible for streamlining within 30 days of application submittal.” Once approved, the plan will receive a streamlined ministerial processing path while entitling the plan to certain zoning modifications like parking, open space, and rear yard spaces.

Reuben Law has filed the application. The application lists CPIF MRA LLC as the property owner or representative, an entity linked with Seattle-based Columbia Pacific. The plan will create around 240 units of affordable housing for seniors. Around 60 units will be deed-restricted for supportive housing. Residents will benefit from 3,500 square feet of supportive services at ground level.

Project plans have yet to be published for the application. Construction of 2675 Folsom Street is expected to be separated over two phases, which suggests there will be separate buildings. The building height has yet to be shared, though some insight can be derived from the affordable housing infill by Mercy Housing at 1068 Mission Street in SoMa. The SoMa development has created 256 residences across six floors on a 1.16-acre parcel. The Folsom Street proposal is expected to have as many homes on a parcel half the size. The 0.58-acre Folsom Street parcel is adjacent to Parque Niños Unidos.
https://sfyimby.com/2023/10/affordab...-district.html
Reply With Quote
     
     
  #11753  
Old Posted Oct 26, 2023, 3:33 PM
homebucket homebucket is online now
你的媽媽
 
Join Date: Jan 2012
Location: The Bay
Posts: 9,586
Some nice infill incoming to Alamo Square.

The specs for 650 Divisadero Street:
- 9 floors, 85 ft
- 95 units
- All of the units will be affordable
- Parking for 0 cars and 95 bicycles

The site:
https://maps.app.goo.gl/oCAqV7geD7AQure77

Quote:
Increased Plans, Fully Affordable, For 650 Divisadero Street By Alamo Square



BY: ANDREW NELSON 5:30 AM ON OCTOBER 26, 2023

Preliminary plans have been filed for a larger apartment complex at 650 Divisadero Street by Alamo Square in San Francisco. The application will create a nine-story apartment complex with nearly a hundred affordable units two blocks from the Panhandle. Jonathan Rose Companies is the project developer.

The property is one of five that the Mayor’s Office of Housing and Community Development acquired this summer to focus on affordable housing. MOHCD Director Eric Shaw shared that “the office will partner with the development teams, city agencies, and community partners to advance development of these projects and deliver hundreds of new affordable homes for moderate-income, low-income, and extremely low-income households.”

The initial plans provide an overview of the potential building. The 85-foot tall structure will hold 95 apartments, with unit mix to be determined later. Parking will be included for 95 bicycles and no cars, a decision that is expected to promote public transit and reduce local congestion. Residential amenities will include management offices, supportive services, a community lounge, a fitness center, and a computer room. An interior courtyard and upper-story decks will give people access to open space.

Demolition will be required for the existing single-story structure occupied by a seismic retrofitting business. Residents will be close to several bus lines in all four directions across the neighborhood’s grid system. The Civic Center BART Station is just under 20 minutes away by bus or 15 minutes by bicycle.
https://sfyimby.com/2023/10/increase...mo-square.html
Reply With Quote
     
     
  #11754  
Old Posted Oct 27, 2023, 3:56 PM
homebucket homebucket is online now
你的媽媽
 
Join Date: Jan 2012
Location: The Bay
Posts: 9,586
Quote:
CEQA Approval For San Francisco Transbay Downtown Rail Extension



BY: ANDREW NELSON 5:30 AM ON OCTOBER 27, 2023

The California Transportation Commission has approved the CEQA environmental review of the 2.2-mile extension of The Portal, San Francisco’s Downtown Rail Extension. The Portal will connect the city’s existing 4th Street Train Station to the Salesforce Transit Center. Once complete, the connection will accommodate Caltrain and future high-speed rail.

The notice of determination for the extension has determined that the project will have a significant effect on the environment and that a mitigation measures and reporting plan were adopted to minimize its impact. The report was sent from the California Transportation Commission to the State’s Office of Planning and Research.

The Portal will include a new underground station at Fourth and Townsend. A tunnel will connect with the Transbay Transit Center underground station, which opened in 2018. the Transbay Joint Powers Authority writes that “the already built two-level trainbox will serve as the Lower Concourse, and Train Platform levels when The Portal is complete.”

San Francisco is one of three cities with HSR stops in the Bay Area. HSR, which will transverse around 422 miles from Downtown Los Angeles, will stop at Millbrae’s BART-Caltrain connection hub and San Jose’s Diridon Station.

Earlier this year, the public learned about a newly projected $6.7 billion price tag for the 1.3-mile underground connection from the current station to Downtown. Completion is expected as early as 2032. However, the Bay Area has seen its fair share of infrastructure projects with ballooning price tags, missed deadlines, and reduced scale. Most recently, in Santa Clara County, the six-mile BART extension has seen its initial $4.7 billion expansion that would open in 2026 be slowly pushed back a full decade, now projected to open in 2036 at a cost of roughly $12.2 billion.
https://sfyimby.com/2023/10/ceqa-app...extension.html
Reply With Quote
     
     
  #11755  
Old Posted Oct 27, 2023, 3:57 PM
homebucket homebucket is online now
你的媽媽
 
Join Date: Jan 2012
Location: The Bay
Posts: 9,586
Reply With Quote
     
     
  #11756  
Old Posted Oct 27, 2023, 4:14 PM
homebucket homebucket is online now
你的媽媽
 
Join Date: Jan 2012
Location: The Bay
Posts: 9,586
Some nice infill incoming to Russian Hill/North Beach.

The specs for 1526 Powell Street:
- 6 floors, 61 ft
- 20 units (11 1BR, 6 2BR, 3 3BR)
- 3 of the units will be affordable
- Parking for 10 cars and 20 bicycles

The site:
https://maps.app.goo.gl/8bDvHJSoimW7eijC9

Quote:
New Renderings For 1526 Powell Street In San Francisco



BY: ANDREW NELSON 5:00 AM ON OCTOBER 27, 2023

New renderings have been published for a proposed residential redevelopment of the John Delucchi Sheet Metal building at 1526 Powell Street in San Francisco. The building is located on the border of Russian Hill and North Beach. The plan by JS Sullivan Development would bring 20 new residences for ownership, including some affordable units, to the mostly stagnant neighborhood while retaining the structure’s distinctive facade.

RG Architecture is responsible for the design. The project will plop a modern six-story building behind the sheet metal-adorned facade of the John J. Delucchi building. A setback terrace will distinguish between the two-story podium and the upper floors facing Powell Street. The four-story expansion is influenced by the neighborhood’s historic vernacular of linear cornices with a low parapet, horizontal banding between floors, and taller windows. The front and rear facades will be clad with metal phenolic panels, while the side walls will be covered with horizontal fiber-cement lap siding.

The 61-foot tall structure will yield 29,300 square feet, with 25,900 square feet for housing and 3,400 square feet for a ground-level garage. Unit sizes will vary with 11 one-bedrooms, six two-bedrooms, and three three-bedrooms. Parking will be included for ten cars and 20 bicycles.

The plan will include three affordable low-income units, allowing the firm to use the State Density Bonus program to increase residential capacity.

Future residents will find themselves one block away from the beloved Washington Square Park in North Beach. Chinatown and the Financial District are within walking distance, with Muni bus stations along Columbus Avenue, Broadway, and Pacific Avenue crisscrossing the city. The Powell Street BART Station is 15 minutes away by bus.

The existing building was constructed between 1916 and 1921. it was identified as an individually significant historic resource by the 1999 North Beach Historic Survey. City records show the property sold in April last year for $2.9 million. Construction is expected to cost $6 million, with an estimated timeline yet to be established.
https://sfyimby.com/2023/10/new-rend...francisco.html
Reply With Quote
     
     
  #11757  
Old Posted Oct 27, 2023, 4:15 PM
homebucket homebucket is online now
你的媽媽
 
Join Date: Jan 2012
Location: The Bay
Posts: 9,586
Reply With Quote
     
     
  #11758  
Old Posted Oct 29, 2023, 7:24 PM
JManc's Avatar
JManc JManc is online now
Dryer lint inspector
 
Join Date: Feb 2003
Posts: 38,942
Quote:
Originally Posted by homebucket View Post
"Earlier this year, the public learned about a newly projected $6.7 billion price tag for the 1.3-mile underground connection from the current station to Downtown. Completion is expected as early as 2032. However, the Bay Area has seen its fair share of infrastructure projects with ballooning price tags, missed deadlines, and reduced scale. Most recently, in Santa Clara County, the six-mile BART extension has seen its initial $4.7 billion expansion that would open in 2026 be slowly pushed back a full decade, now projected to open in 2036 at a cost of roughly $12.2 billion."

This stuff is why East Asia and W. Europe are light years ahead of us on this sort of thing.
Reply With Quote
     
     
  #11759  
Old Posted Oct 29, 2023, 7:30 PM
gochujang gochujang is offline
BANNED
 
Join Date: Oct 2023
Location: San Francisco
Posts: 48
I'm not bothered. It may cost twice as much as Europe or Asia but the Bay Area has double the GDP per capita of any city in Europe or Asia so it all balances out.
Reply With Quote
     
     
  #11760  
Old Posted Oct 30, 2023, 3:49 PM
homebucket homebucket is online now
你的媽媽
 
Join Date: Jan 2012
Location: The Bay
Posts: 9,586
Good progress on this one. Pretty wild how this project has been 2 decades in the making. It's a shame this city and the Bay Area in general can't get their act together when it comes to building anything in a timely manner.

The specs for 1360 43rd Avenue:
- 5 floors, 55 ft
- 135 units (24 studios, 43 1BR, 59 2BR, 9 3BR)
- 134 of the units will be affordable
- 1,750 sq ft for public amenities
- Parking for 50 cars and 68 bicycles

The site:
https://maps.app.goo.gl/V6oCxkGN5Y28iCDm6

Quote:
Construction Topped Out For Affordable Educator Housing In The Sunset District



BY: ANDREW NELSON 5:30 AM ON OCTOBER 30, 2023

Just over a year after the official groundbreaking ceremony, crews have topped out the five-story affordable educator housing development at 1360 43rd Avenue in San Francisco’s Sunset District. The Shirley Chisholm Village has replaced a former school and outdoor yard with the low-rise apartment infill designed by BAR Architects with G7A. MidPen Housing is the project developer, and Cahill is the general contractor.

The 55-foot tall structure will yield 165,860 square feet with 142,460 square feet for housing, 1,750 square feet for public amenities, and 21,650 square feet for the 50-car garage. Parking will also be included for 68 bicycles. The complex will create 135 apartments, one of which will be for the on-site manager. Unit sizes will vary, with 24 studios, 43 one-bedrooms, 59 two-bedrooms, and nine three-bedrooms. KPFF is the structural engineer, and Emerald City is the MEP engineer.

Of the 134 affordable houses, 34 units will be restricted to low-income qualified educators earning between 40 to 60 percent of the Area Median Income. The remaining 100 units will be for moderate-income qualified educators earning between 80 to 120 percent of the Area Median Income.

BAR Architects is the project architect in collaboration with G7A. The exterior will be clad with fiber cement siding installed horizontally and vertically, plaster, and wood siding. The design articulates the expansive facade to break up the scale visually and reference the surrounding architectural vernacular. Fletcher Studio will be responsible for the landscape architecture, which will include a central residential courtyard, a podium-top deck, and a community plaza along 43rd Avenue.

Crews demolished the former Francis Scott Key Annex school site built in 1927. The annex has been abandoned since being deemed seismically unsound. The proposal for housing on the 1.4-acre site has been in the works for over two decades but finally gained momentum when, in 2017, Mayor Ed Lee committed $44 million of funding for the project. Construction started in September last year. Shirley Chisholm Village is expected to take its first residents in by next year.
https://sfyimby.com/2023/10/construc...-district.html
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Global Projects & Construction > City Compilations
Forum Jump



Forum Jump


All times are GMT. The time now is 11:45 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.