
Wow, very little information coming out of this project, and its highlighted within the above posts by numerous instances where the project team is unable to clarify things, etc. The above-noted project definition report due out by the end of the year will be the first big unveiling, as it was for the Gateway Program. I'm sure there will be a few 'extra' elements included that may not be built intitally (like the C/D system between Grandview Hwy and Douglas, and the 216 interchange). The real interesting stuff will be when the preliminary designs are released for the various interchanges, etc.
Without a doubt, the 'North Scope' being Hwy 91 is a huge red flag for the traffic implications at the Oak Street Bridge. The political 'hot potato' of increasing 'lanes of traffic' into the City of Vancouver will be tossed around while the Province builds it's megabridge and makes the Fraser Navigable for bigger, heavier ships.
I wonder what the potential for protestors dogging the EA process and initial construction will be. That would coincide with the BC Prov. election in 2017...