Guys check this out
http://skyscraperpage.com/cities/?cityID=28
So many of the buildings that they have listed as “under construction” for HOU are done like Capitol Tower, Hanover BLVD Place, Hanover River Oaks, Camden Conte, Marlowe, Memorial Hermann TMC expansion, etc.
So many buildings in the “proposed” section are either under construction or already done like the Blossom Hotel, Thompson Hotel and Residences at the Allen, Gables Westcreek, Broadstone at Chelsea Market in the Museum District, the Bowen, Elan Memorial Park, Greystar Phase 2 in the Heights, Block 387 Downtown, Hilton-Staybridge in Uptown, Home2Suites in the Med Center, the office building in the Midlane mixed use near ROD, Tradition Woodway (the Homey), etc.
Then there are buildings that don’t even show up on any of their data lists like the Preston or Drewery Place, the highrises U/C in Memorial City and U/C in City Centre, that 16 story Embassy hotel that finished construction in Energy Corridor like 4 years ago.
HOU has well over 500 buildings above 10 stories done now but that list has had it stuck at 494 for 2.5 years...
I'm gonna go ahead and make a compilation of all the errors and request a database correction. I'll skim through HAIF and see which buildings have been built, are under construction, and proposed to make the list. Need to get the HOU database to the present timeline. It's database is still stuck in the last construction cycle even though so many buildings have been built since then.
http://forum.skyscraperpage.com/show...postcount=9865