HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Global Projects & Construction > City Compilations


Reply

 
Thread Tools Display Modes
     
     
  #11181  
Old Posted Aug 12, 2016, 4:50 PM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,474
Entergy’s New Orleans East solar power plant is operating
0
The plant is one of the few in the country to incorporate battery technology to store energy on cloudy days




http://nola.curbed.com/2016/8/11/124...ar-power-plant




Central City Prepares For Cracklin at Toups South, Opening This Fall



http://nola.eater.com/2016/8/12/1245...eans-fall-2016
Reply With Quote
     
     
  #11182  
Old Posted Aug 13, 2016, 7:13 PM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,474
Tulane Campus Plans












Reply With Quote
     
     
  #11183  
Old Posted Aug 16, 2016, 1:29 AM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,474
Roberts Grocery Store finally starting in Marigny

2222 St Claude Ave·Renovation (Structural) ·Ref Code: 3L1K64
Print Summary Submit Add to Watch List
Type:
Renovation (Structural)
Applicant:
Gene Guidry
Status:
Application Submitted
Date Filed:
8/12/2016
Closed:
No
Description
Renovate and construct addition to supermarket as per plans.

Applicant:
Gene Guidry
Contractors:
Ryan Gootee General Contractors
Expires:
Division:
SP
Subdivision:
Marigny
Council District:
C
Area:
0
Next Status:
Application Review
Next Status Date:
8/15/2016 4:06:35 PM
Next Inspection:
Inspection Date:
Next Inspector:
Total Fees:
58590.00
Unpaid Fees:
58590.00
Final Date:
Days Open:
2
Days Issued:
0
Filing Date:
8/12/2016 4:06:35 PM
Lead Staff:




717 Orleans Ave·Renovation (Structural) ·Ref Code: 856F0P
Download (1) Print Summary Submit Add to Watch List
Type:
Renovation (Structural)
Applicant:
St Ann Lodging LLC
Status:
Draft Application
Date Filed:
8/15/2016
Closed:
No
Description
Structural repairs and renovations to hotel as noted.


djsnola
8010 Chef Menteur Hwy·Renovation (Non-Structural) ·Ref Code: 3VFGJH
Download (2) Print Summary Submit Add to Watch List
Type:
Renovation (Non-Structural)
Applicant:
Jadie Truong
Status:
Application Review
Date Filed:
8/15/2016
Closed:
No
Description
Convert a vacant space to a massage parlor as per plans.


djsnola
1136 Decatur St·Renovation (Non-Structural) ·Ref Code: 1GP1Q2
Download (1) Print Summary Submit Add to Watch List
Type:
Renovation (Non-Structural)
Applicant:
REBEKAH WILLIAMS
Status:
Application Submitted
Date Filed:
8/15/2016
Closed:
No
Description
INTERIOR RENOVATION TO FIRE DAMAGED RESTAURANT AS PER PLANS. NO EXTERIOR WORK UNDER THIS PERMIT.


djsnola
1815 Canal St·Renovation (Structural) ·Ref Code: ZUYTLR
Print Summary Submit Add to Watch List
Type:
Renovation (Structural)
Applicant:
USA Future Tech Inc
Status:
Application Submitted
Date Filed:
8/15/2016
Closed:
No
Description
Replace roof beam framing and wood decking. Install two layers of 2.6 polyisocyanurate roof insulation to wood decking and fully adhere one ply of .060 white TPO membrane and also flashing to be in accordance with manufactures specification. Installed 24 gauge kynar gutters and leaders. Repair masonry and repair windows glass throughout building.


U.S. Army Corps of Engineers planning floodwall for Audubon Park’s Fly
The floodwall will protect Uptown against the chance of an 800-year Mississippi River flood




http://nola.curbed.com/2016/8/15/124...eans-floodwall


DDAy Museum


















Reply With Quote
     
     
  #11184  
Old Posted Aug 16, 2016, 1:37 AM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,474
Roberts Grocery Store finally starting in Marigny

2222 St Claude Ave·Renovation (Structural) ·Ref Code: 3L1K64
Print Summary Submit Add to Watch List
Type:
Renovation (Structural)
Applicant:
Gene Guidry
Status:
Application Submitted
Date Filed:
8/12/2016
Closed:
No
Description
Renovate and construct addition to supermarket as per plans.

Applicant:
Gene Guidry
Contractors:
Ryan Gootee General Contractors
Expires:
Division:
SP
Subdivision:
Marigny
Council District:
C
Area:
0
Next Status:
Application Review
Next Status Date:
8/15/2016 4:06:35 PM
Next Inspection:
Inspection Date:
Next Inspector:
Total Fees:
58590.00
Unpaid Fees:
58590.00
Final Date:
Days Open:
2
Days Issued:
0
Filing Date:
8/12/2016 4:06:35 PM
Lead Staff:




717 Orleans Ave·Renovation (Structural) ·Ref Code: 856F0P
Download (1) Print Summary Submit Add to Watch List
Type:
Renovation (Structural)
Applicant:
St Ann Lodging LLC
Status:
Draft Application
Date Filed:
8/15/2016
Closed:
No
Description
Structural repairs and renovations to hotel as noted.


djsnola
8010 Chef Menteur Hwy·Renovation (Non-Structural) ·Ref Code: 3VFGJH
Download (2) Print Summary Submit Add to Watch List
Type:
Renovation (Non-Structural)
Applicant:
Jadie Truong
Status:
Application Review
Date Filed:
8/15/2016
Closed:
No
Description
Convert a vacant space to a massage parlor as per plans.


djsnola
1136 Decatur St·Renovation (Non-Structural) ·Ref Code: 1GP1Q2
Download (1) Print Summary Submit Add to Watch List
Type:
Renovation (Non-Structural)
Applicant:
REBEKAH WILLIAMS
Status:
Application Submitted
Date Filed:
8/15/2016
Closed:
No
Description
INTERIOR RENOVATION TO FIRE DAMAGED RESTAURANT AS PER PLANS. NO EXTERIOR WORK UNDER THIS PERMIT.


djsnola
1815 Canal St·Renovation (Structural) ·Ref Code: ZUYTLR
Print Summary Submit Add to Watch List
Type:
Renovation (Structural)
Applicant:
USA Future Tech Inc
Status:
Application Submitted
Date Filed:
8/15/2016
Closed:
No
Description
Replace roof beam framing and wood decking. Install two layers of 2.6 polyisocyanurate roof insulation to wood decking and fully adhere one ply of .060 white TPO membrane and also flashing to be in accordance with manufactures specification. Installed 24 gauge kynar gutters and leaders. Repair masonry and repair windows glass throughout building.


U.S. Army Corps of Engineers planning floodwall for Audubon Park’s Fly
The floodwall will protect Uptown against the chance of an 800-year Mississippi River flood




http://nola.curbed.com/2016/8/15/124...eans-floodwall


DDAy Museum



















Last edited by tennis1400; Aug 16, 2016 at 1:51 PM.
Reply With Quote
     
     
  #11185  
Old Posted Aug 16, 2016, 1:55 AM
prokowave prokowave is offline
Registered User
 
Join Date: Jun 2010
Posts: 527
Quote:
Originally Posted by tennis1400 View Post
Roberts Grocery Store finally starting in Marigny

2222 St Claude Ave·Renovation (Structural) ·Ref Code: 3L1K64
Print Summary Submit Add to Watch List
Type:
Renovation (Structural)
Applicant:
Gene Guidry
Status:
Application Submitted
Date Filed:
8/12/2016
Closed:
No
Description
Renovate and construct addition to supermarket as per plans.
It's about time that store re-opened. That should be a major improvement for the area. It's a shame they didn't get it done in time for the streetcar opening.
Reply With Quote
     
     
  #11186  
Old Posted Aug 16, 2016, 11:24 PM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,474
Plenty of Pictures from Today:

The Jung

































































1615 Canal which looks to have sold:










Canal Crossing:












































Bienville Basin:























1600/1630 Canal







































Reply With Quote
     
     
  #11187  
Old Posted Aug 17, 2016, 8:17 AM
SlidellWx's Avatar
SlidellWx SlidellWx is offline
Registered User
 
Join Date: Nov 2005
Location: New Orleans
Posts: 1,552
Great pics! I really can't believe the amount of investment taking place on the upper end of Canal St. That was a no-man's land just a few years ago. Can't wait to see that area when everything is complete. The last big piece to get going is the State Palace Theater in the middle of Canal. I'm also curious to see the plans for the block that burned earlier this year.
__________________
Slidell, LA...The Camellia City
Reply With Quote
     
     
  #11188  
Old Posted Aug 17, 2016, 5:56 PM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,474
Quote:
Originally Posted by SlidellWx View Post
Great pics! I really can't believe the amount of investment taking place on the upper end of Canal St. That was a no-man's land just a few years ago. Can't wait to see that area when everything is complete. The last big piece to get going is the State Palace Theater in the middle of Canal. I'm also curious to see the plans for the block that burned earlier this year.

Lets be honest its all because of my new house!!!!

But seriously yesterday when I walked around was the first time I really felt the immensity of the changes occurring there. Its going to be a whole different neighborhood in a year. Also, the sheer scale of it just means what took warehouse district 20 years to do this neighborhood will do in two or three years. Combing this with whatever happens to charity and I think your going to be looking at the densest neighborhood residential wise in the city by the end of the decade.
Reply With Quote
     
     
  #11189  
Old Posted Aug 18, 2016, 1:23 AM
Chris from N.O.'s Avatar
Chris from N.O. Chris from N.O. is offline
Registered User
 
Join Date: Feb 2011
Posts: 609
What's the timeline on the TU project? Are they planning on a big expansion in enrollment?
Reply With Quote
     
     
  #11190  
Old Posted Aug 18, 2016, 2:57 AM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,474
Quote:
Originally Posted by Chris from N.O. View Post
What's the timeline on the TU project? Are they planning on a big expansion in enrollment?
No idea but they had an explanation about each building and why its needed and it was a lot of bringing certain facilities about to modern standards. So who knows but Id guess larger enrollment and more modern facilities overall.











CAC Workshare - The Camp







Proposed New Building at 611-619 S Peters





611-615 Commerce












Pics from today:



















2100 Chartres:




Last edited by tennis1400; Aug 18, 2016 at 3:41 AM.
Reply With Quote
     
     
  #11191  
Old Posted Aug 19, 2016, 12:38 AM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,474
1031 canal and home wood suites 8/18/16




Reply With Quote
     
     
  #11192  
Old Posted Aug 19, 2016, 2:34 PM
sgray sgray is offline
Registered User
 
Join Date: Nov 2006
Posts: 145
1031 Canal

again, what's the hold up with the 1031 Canal St. project?

also, is the nearby Texaco Building being used? it underwent a total overhaul but I never see any people there
Reply With Quote
     
     
  #11193  
Old Posted Aug 19, 2016, 2:38 PM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,474
Quote:
Originally Posted by sgray View Post
again, what's the hold up with the 1031 Canal St. project?

also, is the nearby Texaco Building being used? it underwent a total overhaul but I never see any people there
1031 is moving along.. texaco building is senior living facility. so there are people there just really old ones who dont do much
Reply With Quote
     
     
  #11194  
Old Posted Aug 19, 2016, 10:17 PM
CheeburgerCheeburger CheeburgerCheeburger is offline
Registered User
 
Join Date: Feb 2013
Posts: 55
Quote:
Originally Posted by tennis1400 View Post
2100 Chartres:



Holy shit. Is something happening w/Cafe Brasil?
Reply With Quote
     
     
  #11195  
Old Posted Aug 20, 2016, 5:22 PM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,474
4201 Woodland Dr, 2nd & 3rd Floor·Renovation (Non-Structural) ·Ref Code: EB0DMV
Print Summary Submit Add to Watch List
Type:
Renovation (Non-Structural)
Applicant:
Rhett Parker
Status:
Application Submitted
Date Filed:
8/18/2016
Closed:
No
Description
Project scope includes limited renovation and rebranding of a patient rehabilitation center on part of the 2nd Floor, and all of the 3rd Floor of an existing six (6) Floor Health Care Facility as per plans


djsnola
1001 S Broad St Suite 107·Renovation (Non-Structural) ·Ref Code: 82MAAL
Print Summary Submit Add to Watch List
Type:
Renovation (Non-Structural)
Applicant:
Perkins Charles E
Status:
Application Submitted
Date Filed:
8/18/2016
Closed:
No
Description
Tenant Build-out of a wine shop as per sketch.


djsnola
820 Poydras St·Renovation (Non-Structural) ·Ref Code: F51BUP
Print Summary Submit Add to Watch List
Type:
Renovation (Non-Structural)
Applicant:
John Lambertson
Status:
Application Submitted
Date Filed:
8/19/2016
Closed:
No
Description
PJ’s Coffee Build-out of existing structure


djsnola
2523 Bayou Rd·Renovation (Structural) ·Ref Code: CW50Z0
Download (2) Print Summary Submit Add to Watch List
Type:
Renovation (Structural)
Applicant:
IGH Contracting Services LLC
Status:
Application Submitted
Date Filed:
8/19/2016
Closed:
No
Description
Remodel existing store front (Community Book Store) as per sketch and HDLC approval. Electrical. No plumbing. No mechanical.


3119 Magazine St·Renovation (Non-Structural) · Permit #16-27070-RNVN ·Ref Code: BGC3GD
Download (14) Print Summary Submit Add to Watch List
Type:
Renovation (Non-Structural)
Applicant:
3117 Magazinestreet LLC
Status:
Certificate of Occupancy
Date Filed:
8/17/2016
Closed:
Yes
Description
Creating retail space in existing salon. (Front portion of tenant space to have retail goods and fitting room). No electrical. No mechanical. No plumbing



Really awesome article about The Jung and how complicated this project is:



http://www.enr.com/articles/39991-pr...m2TpA.facebook



Trader Joes:




Dave and Busters:
















The Pythian:



















Eagle Saloon:












NOPSI



Joie De Vivre:






700 Baronne:










940 Julia





The Standard:



















View From New condos on Chartres :







Wetlands Park:































Last edited by tennis1400; Aug 20, 2016 at 5:53 PM.
Reply With Quote
     
     
  #11196  
Old Posted Aug 20, 2016, 7:58 PM
NolaWXGuy1208's Avatar
NolaWXGuy1208 NolaWXGuy1208 is offline
Registered User
 
Join Date: Jul 2015
Location: NOLA by way of Mobile
Posts: 47
Has anyone heard anything on either Plaza Tower or the Convention Center expansion? I'm a bit surprised the convention center expansion seems to have been swept under the rug. And I really just want something to happen to Plaza Tower...especially with its location where it really stands out, once it's re-purposed, they could easily light it up nice too!
Reply With Quote
     
     
  #11197  
Old Posted Aug 21, 2016, 4:16 PM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,474
Quote:
Originally Posted by NolaWXGuy1208 View Post
Has anyone heard anything on either Plaza Tower or the Convention Center expansion? I'm a bit surprised the convention center expansion seems to have been swept under the rug. And I really just want something to happen to Plaza Tower...especially with its location where it really stands out, once it's re-purposed, they could easily light it up nice too!

Havent heard anything. I guess its possible Joe Jaeger will focus on Plaza after he finsihes the Jung. Thats scheduled to be completed in March 2017.
Reply With Quote
     
     
  #11198  
Old Posted Aug 23, 2016, 10:03 PM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,474
Stephens garage project looks to be finally moving forward








546 Carondelet St (Hotel Development)








































Lucys Gallery Addition:









Convention Center Seeking Master Plan Changes

1380 Tchoupitoulas St, 1394 Tchoupitoulas St, 1301 S Front St, 1301 Co·NPP Notifications · Project #16-1731 ·Ref Code: 64208L
Print Summary Submit Add to Watch List
Type:
NPP Notifications
Applicant:
N Morial Convention Center Ernest
Status:
Draft Application
Date Filed:
8/2/2016
Closed:
No
Description
Master plan amendment

Reviews:
0
Reviews Pending :
0
Days Open:
16
Date Finaled:
Lead Staff:
Next Meeting:
Meeting Date:
Next Status:
NPP Generated
Next Status Date:
8/2/2016 12:00:00




416 Girod St, Suites C & D·Renovation (Non-Structural) ·Ref Code: ZXZD6U
Print Summary Submit Add to Watch List
Type:
Renovation (Non-Structural)
Applicant:
Kristine Shull
Status:
Application Submitted
Date Filed:
8/9/2016
Closed:
No
Description
Interior buildout for two open-office spaces within an existing building as per plans.




4124 Tchoupitoulas St·Stormwater Management · Project #SW041-16 ·Ref Code: ZLJZCR
Download (3) Print Summary Submit Add to Watch List
Type:
Stormwater Management
Applicant:
Dana Brown & Associates, Inc
Status:
Completeness Review
Date Filed:
8/22/2016
Closed:
No
Description
Stormwater review for site with more than 5,000 sq. ft. of impervious surfaces





327 S Rampart St·Board of Building Standards and Appeals · Project #BBSA No. 16-72 ·Ref Code: CDM0HH
Download (1) Print Summary Submit Add to Watch List
Type:
Board of Building Standards and Appeals
Applicant:
International Properties, LLC
Status:
Draft Application
Date Filed:
8/1/2016
Closed:
No
Description
The applicant is appealing the conversion of an existing one-story, 11,000 sf. warehouse and office building in the CBD-1 district into a banquet hall with reception area and courtyard.










1036 N Rampart St·Renovation (Structural) ·Ref Code: LGYXH7
Print Summary Submit Add to Watch List
Type:
Renovation (Structural)
Applicant:
Corbett Scott
Status:
Application Submitted
Date Filed:
8/23/2016
Closed:
No
Description
INTERIOR ALTERATIONS ONLY THIS PERMIT. This is a permit for interior renovations. All exterior renovations, etc to follow. Change of use from Business Group-B to Assembly A-1. Renovation of an existing single-story historic structure into a restaurant. There are no additions. All windows and exterior doors to remain in current locations.




1111 Gravier St·Attached Sign ·Ref Code: 0HM188
Print Summary Submit Add to Watch List
Type:
Attached Sign
Applicant:
Karen Gray
Status:
Application Submitted
Date Filed:
8/23/2016
Closed:
No
Description
INSTALL ONE (1) HOTEL MARQUEE ID SIGN (STA1) ONE (1) RESTAURANT LOGO CHANNEL LETTER SET (STA3), ONE (1) HISTORIC ID PLAQUE (STA2) AND DISTRACTION VINYL AS PER DESIGN SPECS PROVIDED

Last edited by tennis1400; Aug 23, 2016 at 11:37 PM.
Reply With Quote
     
     
  #11199  
Old Posted Aug 23, 2016, 11:48 PM
Busy Bee's Avatar
Busy Bee Busy Bee is offline
just a pool of mushy goo
 
Join Date: Feb 2006
Location: on the artistic spectrum
Posts: 10,628
You know I'd check this thread more often if it didn't cause my browser to lock up. Toooooo many images on one page. There should be a way to automatically partition a page after a certain image MB load size.
__________________
Everything new is old again

Trumpism is the road to ruin
Reply With Quote
     
     
  #11200  
Old Posted Aug 24, 2016, 12:39 AM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,474
Quote:
Originally Posted by Busy Bee View Post
You know I'd check this thread more often if it didn't cause my browser to lock up. Toooooo many images on one page. There should be a way to automatically partition a page after a certain image MB load size.


I know I dont understand why this page is so large. Wish I could change it myself. I think what ill do in the future is instead of post all those pictures in one giant reply ... ill break it up ... that might help change the pages more often.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Global Projects & Construction > City Compilations
Forum Jump



Forum Jump


All times are GMT. The time now is 11:30 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.