| |
Posted Jun 20, 2025, 6:46 PM
|
 |
Registered User
|
|
Join Date: Jul 2011
Posts: 440
|
|
Waterloo Region Updates
1157, 1175 Weber Street East Kitchener
@ZEBuilder 03-14-2025, 04:50 PM
Quote:
Zehr has redesigned this project since they originally got the ZBA/OPA approved for it, they're now planning for this to be one of their "Stride" branded rental building. They are now proposing an 11 floor building containing 233 rental units and 210 sqm of commercial space, it is down from the 443 units and 367 sqm of commercial space in the 17 and 19 floor design.
The new design does not appear to contain any underground parking, instead there is a 1 floor open air parking garage at the back of the site, overall there will be 175 parking spaces, and 229 bike spaces.
|
Render:
Platform @ Station Park Kitchener
@ZEBuilder 05-10-2025, 01:25 PM
Quote:
(05-10-2025, 10:07 AM)Momo26 Wrote:
(03-28-2025, 08:43 AM)ZEBuilder Wrote:
Platform is going to be the second Duo building (35 Wellington St S). They soft launched and are selling units now. Prices are low 500s to 800k.
They're expecting closing in 2028. If that's the case we're going to see shoring equipment late this year or early next year. With how soft the condo market is it wouldn't be surprising if they shifted everything back a year.
Studios and super small 1bds for low 500k? 1bed proper and 1+dens low 600ks I'm guessing?
Here's the price list:
|
3241-3247 King St E and 108 Cameo Dr Kitchener | 24, 23, & 19 fl | U/C
@ZEBuilder 05-30-2025, 08:05 PM
Quote:
|
This project now has a ZBA/OPA submitted to the city. Vive is intending to change the height of the third phase of the project from 19 floors to 29 floors. The planning documents haven't been made public yet but Vive will be asking for amendments to the OP for density (FSR of 4.94 whereas 4.0 is the max), reduction in parking spaces (871 instead of 1038) for a rate of 0.8 spaces per unit (slightly lower than this).
|
Weber Yards (1333 Weber St E) Kitchener | 15, 15, 12 & 12 fl | U/C
@creative 05-27-2025, 09:15 AM
132 Fairway Rd. N. Kitchener
https://www.therecord.com/news/water...e65ae6063.html
Affordable rental building proposed for Kitchener neighbourhood
The three-storey building would have 26 studio apartments.
Quote:
June 11, 2025 - A developer is proposing to build a rental building with affordable studio units in Kitchener’s Centreville-Chicopee neighbourhood.
Eleven Housing Corporation wants to construct the three-storey, 26-unit building on the property at 132 Fairway Rd. N., at the corner of Jansen Avenue.
The site currently contains a single-detached home that would be torn down...
|
Rendering of a proposed affordable rental building on Fairway Road North in Kitchener. GSP Group
Courtland Avenue East and Block Line Road Kitchener
https://www.therecord.com/news/water...5fd04254f.html
Vive Development plans 5 towers on Kitchener site bought out of receivership
The purpose-built rental development is transit oriented, with an LRT station next door.
Quote:
June 12, 2025 - Vive Development is planning to build five rental towers on a Kitchener property purchased out of receivership.
The company acquired the vacant site for $22.75 million after a previous project planned by a different developer for the property at Courtland Avenue East and Block Line Road went into receivership last year.
“It’s a parcel that we’ve been keenly interested in for probably well over a decade,” said Stephen Litt, Vive’s chief development officer.
The Block Line LRT station is located at the corner and the site also sits along several bus routes.
...
Litt said roughly 10 per cent of the estimated 2,400 apartments across the five planned towers at Courtland and Block Line will meet Canada Mortgage and Housing Corporation affordability guidelines.
Maximum building heights will be capped at about 35 storeys due to flight path restrictions in place for the Region of Waterloo International Airport.
...
The Vive Development plan is the latest for a site that’s changed hands a couple of times in recent years.
Toronto-based Spotlight Development had planned to build four highrise towers with an estimated 2,500 to 3,000 units, 60 per cent of which would have been affordable, until the project went into receivership last year.
Spotlight purchased the site for $28.5 million after an approved four-tower development proposal didn’t proceed.
“We’re not ones to sit on our hands. Our hope would be to have a shovel in the ground in 2026,” Litt said. The towers would be built in phases.
|
Vive Development plans to build five rental towers on a property at Courtland Avenue East and Block Line Road. The Kitchener site was purchased out of receivership. Brent Davis/Waterloo Region Record
351-355 King St. N. Waterloo & Erb St W / Caroline St S Waterloo
https://www.therecord.com/news/water...06cc93e6a.html
Waterloo council approves a rental building, strikes a deal to redevelop a downtown site
City hall approved new homes at two locations Monday to help move past a housing crisis that has escalated rents and costs.
Quote:
June 18, 2025 - Three more residential buildings could be coming to central Waterloo following city council decisions on Monday.
Council has reached a deal with several developers that helps clear the way for two proposed residential buildings on Erb Street West, beside Waterloo Town Square mall next to Ion rail transit tracks.
“I’m really pleased to have this coming to council,” Mayor Dorothy McCabe said when the negotiation was made public.
City hall has agreed to sell one parcel of land to a developer and swap another parcel with a developer to secure almost $7 million in cash, an affordable housing contribution and a bigger redevelopment than initially proposed on a prominent downtown site.
...
Details on redevelopment plans have yet to be made public. One tower is proposed at 25 storeys, drawings show. After both proposed projects are built, some of the area would be still be used for parking as it is today.
...
In a separate vote, council approved a rental apartment building at seven storeys proposed next to an existing 22-storey rental building that’s to see interior renovations. The site is at the corner of King and Columbia streets.
The existing Columbia Street tower is full of five-bedroom apartments, a popular choice when it was built some years ago. The building will be renovated to add 11 additional apartments with sizes ranging from one to four bedrooms.
The renovation will provide more choice for tenants in a building that’s expected to continue attracting students but may also attract other tenants, said Trevor Hawkins, a planning consultant for the developer.
The adjacent new building at seven storeys will include 24 apartments, all with two or more bedrooms, plus commercial space on the ground floor...
|
Rendering of a seven-storey rental apartment building approved by council at 351-355 King St. N. in Waterloo. MHBC Planning
A prominent downtown site
200 Victoria St S Kitchener | 50 fl | Proposed
@Lebronj23 06-19-2025, 11:05 PM
Application_Status_Site_Plan: SPF25/051/V
Quote:
|
A 50-storey mixed-use building containing 745 residential units and 3 commercial units at grade with 4 levels of underground parking. Kitchener City Council increased the maximum Floor Space Ratio from 7.7 to 8.5 in exchange for the provision of 30 affordable housing units at 80% of market rate for a period of 25 years.
|
211-215 Queen St. W. Cambridge
https://www.therecord.com/news/water...b76571e3a.html
Hespeler site developers and City of Cambridge continue fight at OLT
Blacks Point Development faces hurdles for a mixed-use project at the former Dominion Woollens/Silknit/Forbes textile factory site.
Quote:
June 20, 2025 - Round 2 in a dispute between the City of Cambridge and the developer of a former Hespeler factory site is set for July 14 at the Ontario Land Tribunal.
The Blacks Point Development project was approved by city council in July 2022, but it has been held up at the tribunal (OLT) in a disagreement over access to a neighbouring property and requests for additional information the developer calls “unreasonable.”
The plan is to convert the former three-storey Dominion Woollens/Silknit/Forbes textile building at 211-215 Queen St. W. into 114 housing units, with commercial space on the ground floor. Three existing one-storey buildings are to be turned into commercial space.
The second phase includes a new 10-storey residential building with 115 units. The first two floors would be for parking, with a total of 279 parking spaces on the six-acre site.
|
Blacks Point Development has a second fight on its hands with the City of Cambridge, this time over an incomplete application dispute to lift a holding provision on an easement. Metroland file photo
5 Hill Street Kitchener | 36fl | Proposed
@ZEBuilder 06-19-2025, 09:51 PM
Quote:
The documents haven't been posted for this site yet, the ZBA/OPA only became public this afternoon. Once the documents are public I will add the links to the thread.
The site spans 146 and 152 Lancaster St N, as well as 5 Hill St, it is the existing site of the Hogg Concrete plant and Transit Petroleum depot on Lancaster between Guelph and Wellington St.
The developer is Hogg themselves, with GSP Group doing the planning, they likely have a partner on this if it is anything more then a zone and flip. They also own the property at Charles and Sydney which has this development concept (nothing formally submitted yet): Charles Place | 25, 32, 34, 36, 40, 46, and 46 fl | Proposed.
They're intending for the site to have 9 buildings for a total of 2612 residential units, until the plans are posted there is no breakdown. The development is proposing a total of 264 sqm of commercial space. Between this site and the Vic Common site it is a significant amount of potential units with next to no commercial. The site is proposing 2403 parking spaces.
They are requesting to change the site from industrial to Res 7 in 2019-051 with the following site specific provisions: FSR of 6.1 (slightly lower than Vive and Corley development at 550 Lancaster site), maximum building height of 120.4 metres (35 floors roughly), and to reduce the outdoor amenity requirement to 8650 sqm.
The site isn't particularly well connected with transit, you have the 6 running along Lancaster and then the 34 along Wellington so it isn't the most connected but with the 550 Lancaster site eventually getting developed it isn't the most absurd thing to think there will be some better transit eventually.
In terms of OP the current OP has it as industrial, there will be members of council who will dislike this change significantly. The neighbourhood came out swinging against the Vic Common site so I'd expect a similar situation here, however with the surrounding lands half being parkland and industrial it may have a different outcome. The only thing potentially working in the sites favor is that Kitchener 2051 has this outside of an employment area, so the city wouldn't be going against their future policy on not removing employment areas. However with 2051 not even draft approved those boundaries could change and hence the city can't use that justification, so it will be interesting to see how GSP frames this. Regardless the Lancaster corridor is expected to have some densification based on all 3 of the draft concepts the city has made public so far. The final 2051 draft will likely be a combination of all of them (especially with the incorporation of ROPA 6).
Document Link: SUPPORTING DOCUMENTS
|
Here's the site:
ZEBuilder 06-20-2025, 10:12 AM
Quote:
The documents are now public.
In total there will be 9 buildings ranging from 12 to 36 floors, with 5 at 12 floors, 2 at 30 and 2 at 36 floors.
In total 1834 1 bdrm units and 778 2 bdrm units will be provided on the site.
There will be 1306 Class A bike spaces, and 6 Class B. The site will warrant a LT lane on Lancaster based on traffic conditions, this is not surprising in the slightest given the AADT on Lancaster. The site itself has minimal surface parking with the vast majority underground or in the podium levels.
The floor plans are very preliminary, this is expected as this is definitely just a zoning exercise at this point, the functional servicing plan is really indicative of that just based on the preliminary nature of it. However from the concept plans there are offices on the ground floor of most buildings which makes it seems like these could be rental but again it's way too early to tell.
The concept does have a significant amount of open space which is certainly a positive, it's centrally located between all of the buildings with a direct connection to Lancaster.
|
Concept Plan:
Model:
|
|
|