Quote:
Originally Posted by daybreaker
500 block of N. Carrollton is going to be a Mattress Firm. Having a business a block away, not my first choice :-/ But oh well.
|
No the mattress firm isnt going into that complex. Its across the street by Masseys.
533 N Carrollton Ave·Renovation (Non-Structural) ·Ref Code: PYCDDK
Download (7) Print Summary SubmitAdd to Watch List
Type:
Renovation (Non-Structural)
Applicant:
Sammy Butera
Status:
Application Submitted
Date Filed:
2/25/2016 2:37:15 PM
Closed:
No
Description
Supplement to 15-23961-CUSE, for non-structural, interior final finishes to Mattress Firm. Work inclues carpet, paint, desk, electrical saw-cut to the desk and specialty #-Stat system. No plumbing. No electrical. No HVAC.
Looks like a new TMobile store is going in there though.
500 N Carrollton Ave·Design Review · Project #DR011-16 ·Ref Code: LS5LXT
Print Summary SubmitAdd to Watch List
Type:
Design Review
Applicant:
GraciHart Electric
Status:
Completeness Review
Date Filed:
1/22/2016 9:58:16 AM
Closed:
No
Description
Design review for an attached sign for T-Mobile in an EC Ehancement Corridor and Greenway Corridor Overlay District.
Some substantial new permits over the past two days:
236 N Rampart St·Renovation (Structural) ·Ref Code: 7LC7B1
Print Summary SubmitAdd to Watch List
Type:
Renovation (Structural)
Applicant:
Richard Choate
Status:
Application Submitted
Date Filed:
3/15/2016 7:24:59 AM
Closed:
No
Description
Complete redevelopment of the existing Carmelite Monastery complex. The VCC requested we submit this application although the development is in it’s beginning stages.
846 Baronne St·Renovation (Structural) ·Ref Code: K5ZG0D
Print Summary SubmitAdd to Watch List
Type:
Renovation (Structural)
Applicant:
Rachel Davis
Status:
Application Submitted
Date Filed:
3/15/2016 12:02:10 PM
Closed:
No
Description
New fifth floor addition to existing four-story masonry and heavy timber frame building. To include 55 apartments, and ground floor lease space and vehicular parking.
618 Magazine St·New Construction ·Ref Code: 16VWS1
Print Summary SubmitAdd to Watch List
Type:
New Construction
Applicant:
Myles Martin
Status:
Application Submitted
Date Filed:
3/15/2016 1:40:03 PM
Closed:
No
Description
New construction of a parking garage with ground floor retail.
640 Magazine St·New Construction ·Ref Code: MK8RNZ
Print Summary SubmitAdd to Watch List
Type:
New Construction
Applicant:
Myles Martin
Status:
Application Submitted
Date Filed:
3/15/2016 1:52:37 PM
Closed:
No
Description
Renovate existing five story building into a mixed use structure, with multifamily housing on the upper floors.
700 Magazine St·New Construction ·Ref Code: 36TPHL
Print Summary SubmitAdd to Watch List
Type:
New Construction
Applicant:
Myles Martin
Status:
Application Submitted
Date Filed:
3/15/2016 1:58:47 PM
Closed:
No
Description
New construction of a 5 story mixed use (retail, parking, multi-family) structure.
3108 St Thomas St·New Construction ·Ref Code: BNGE52
Print Summary SubmitAdd to Watch List
Type:
New Construction
Applicant:
Jonathan Tate
Status:
Application Submitted
Date Filed:
3/15/2016 2:27:01 PM
Closed:
No
Description
Partial renovation and new construction for 12 units of housing.
923 Julia St·New Construction ·Ref Code: 4HQCFC
Print Summary SubmitAdd to Watch List
Type:
New Construction
Applicant:
Roland Bodden
Status:
Application Submitted
Date Filed:
3/15/2016 4:06:34 PM
Closed:
No
Description
New 6 Floor multi family development.
Applicant:
Roland Bodden
Contractors:
Expires:
Division:
SP
Subdivision:
Central Business District
Council District:
B
Area:
55700
Next Status:
Application Review
Next Status Date:
3/18/2016 4:06:34 PM
Next Inspection:
Inspection Date:
Next Inspector:
Total Fees:
22590.00
Unpaid Fees:
22590.00
Final Date:
Days Open:
0
Days Issued:
0
Filing Date:
3/15/2016 4:06:34 PM
Lead Staff:
4501 Magnolia St, 2700 Napoleon Ave·Design Review · Project #DR020-16 ·Ref Code: CCRDKE
Print Summary SubmitAdd to Watch List
Type:
Design Review
Applicant:
Alder Hotel Partners, LLC
Status:
Completeness Review
Date Filed:
3/7/2016 11:29:40 AM
Closed:
No
Description
Complete historic renovation of existing 10-story apartment building into a 10-story hotel. The existing structure and exterior facade to remain. New driveway and canopy added to protect drop-off at entrance