Old Posted Oct 16, 2014, 2:48 PM
Martin Mtl's Avatar
Martin Mtl Martin Mtl is offline
Registered User
 
Join Date: Feb 2002
Posts: 8,999
/\ Fabulous. This is turning into the best tower UC in the country.
Reply With Quote
     
     
  #1042  
Old Posted Oct 16, 2014, 2:53 PM
travis3000's Avatar
travis3000 travis3000 is offline
Registered User
 
Join Date: Dec 2012
Location: Simcoe County, ON
Posts: 6,277
One Bloor is sexxxxy
Reply With Quote
     
     
  #1043  
Old Posted Oct 16, 2014, 4:09 PM
Chadillaccc's Avatar
Chadillaccc Chadillaccc is offline
ARTchitecture
 
Join Date: Feb 2011
Location: Cala Ghearraidh
Posts: 22,842
Brookfield Place - 247 M

Getting VERY close to ground level!



Brookfield Place by Chadillaccc, on Flickr
__________________
Strong & Free

Mohkínstsis — 1.6 million people at the Foothills of the Rocky Mountains, 400 high-rises, a 300-metre SE to NW climb, over 1000 kilometres of pathways, with 20% of the urban area as parkland.
Reply With Quote
     
     
  #1044  
Old Posted Oct 16, 2014, 7:29 PM
caltrane74's Avatar
caltrane74 caltrane74 is offline
gettin' rich!
 
Join Date: Aug 2002
Location: Toronto
Posts: 34,193
Looking at that picture, ground level by January? That's just my opinion, but realistic.
Reply With Quote
     
     
  #1045  
Old Posted Oct 16, 2014, 7:58 PM
koops65's Avatar
koops65 koops65 is offline
Intergalactic Barfly
 
Join Date: Dec 2006
Location: Quarks Bar
Posts: 7,676
10 tallest U/C diagram: http://skyscraperpage.com/diagrams/?searchID=65941961

Big changes to this list soon, with Aura, the Ice twins, and L Tower all finishing up soon.
Reply With Quote
     
     
  #1046  
Old Posted Oct 16, 2014, 8:55 PM
Chadillaccc's Avatar
Chadillaccc Chadillaccc is offline
ARTchitecture
 
Join Date: Feb 2011
Location: Cala Ghearraidh
Posts: 22,842
Thanks for the hard work Koops! Awesome to think that is leasing goes well at Oxford Tower, Calgary could have 3 on this list by 2016-2017, with the remainder in Toronto. Maybe Kings on Fourth will surprise the pants off us and start too to make it 4


Quote:
Originally Posted by caltrane74 View Post
Looking at that picture, ground level by January? That's just my opinion, but realistic.
Target for ground level is by early December (easily achievable for the tower portion of the site), though from the picture I posted, it looks like the first rebar (northeast corner) should be reaching ground level by early November. It was literally right there like 3 feet below me
__________________
Strong & Free

Mohkínstsis — 1.6 million people at the Foothills of the Rocky Mountains, 400 high-rises, a 300-metre SE to NW climb, over 1000 kilometres of pathways, with 20% of the urban area as parkland.
Reply With Quote
     
     
  #1047  
Old Posted Oct 17, 2014, 12:10 PM
caltrane74's Avatar
caltrane74 caltrane74 is offline
gettin' rich!
 
Join Date: Aug 2002
Location: Toronto
Posts: 34,193
Quote:
Originally Posted by koops65 View Post
10 tallest U/C diagram: http://skyscraperpage.com/diagrams/?searchID=65941961

Big changes to this list soon, with Aura, the Ice twins, and L Tower all finishing up soon.


We're losing 4 big boys, but we will be gaining E Condos - 194 meters and Massey Tower 208 meters probably within the month or 2 max. Also, Eau du Soliel, 215 meters will start by the spring along with Telus Sky?

Also Bay Adelaide 2 gets upgraded from the B list at 196 meters.
Reply With Quote
     
     
  #1048  
Old Posted Oct 17, 2014, 5:14 PM
WhipperSnapper's Avatar
WhipperSnapper WhipperSnapper is offline
I am the law!
 
Join Date: Sep 2002
Location: Toronto+
Posts: 22,361
E Condos is already listed. Ice 2 still has a ways to go.
Reply With Quote
     
     
  #1049  
Old Posted Oct 17, 2014, 6:08 PM
caltrane74's Avatar
caltrane74 caltrane74 is offline
gettin' rich!
 
Join Date: Aug 2002
Location: Toronto
Posts: 34,193
E condos is already under construction?

Awesome news, I guess it will be on this list, once two of the following: Aura, L Tower, or Ice 1, finish up then.
Reply With Quote
     
     
  #1050  
Old Posted Oct 21, 2014, 11:02 PM
Chadillaccc's Avatar
Chadillaccc Chadillaccc is offline
ARTchitecture
 
Join Date: Feb 2011
Location: Cala Ghearraidh
Posts: 22,842
__________________
Strong & Free

Mohkínstsis — 1.6 million people at the Foothills of the Rocky Mountains, 400 high-rises, a 300-metre SE to NW climb, over 1000 kilometres of pathways, with 20% of the urban area as parkland.
Reply With Quote
     
     
  #1051  
Old Posted Oct 21, 2014, 11:24 PM
LeftCoaster's Avatar
LeftCoaster LeftCoaster is offline
Moderator
 
Join Date: Nov 2005
Location: Toroncouver
Posts: 12,800
Wow that's a lot of rebar.

Good to see such quick progress.
Reply With Quote
     
     
  #1052  
Old Posted Oct 23, 2014, 8:08 PM
Innsertnamehere's Avatar
Innsertnamehere Innsertnamehere is offline
Registered User
 
Join Date: Jan 2010
Location: Hamilton
Posts: 11,917
AURA should be taken off the list I think, The temporary canopy came off 2 nights ago marking substantial completion. Its as good as finished.
Reply With Quote
     
     
  #1053  
Old Posted Oct 23, 2014, 9:31 PM
travis3000's Avatar
travis3000 travis3000 is offline
Registered User
 
Join Date: Dec 2012
Location: Simcoe County, ON
Posts: 6,277
Do we have criteria to follow as to when a building can officially be deemed to be "completed"
Reply With Quote
     
     
  #1054  
Old Posted Oct 23, 2014, 11:07 PM
WhipperSnapper's Avatar
WhipperSnapper WhipperSnapper is offline
I am the law!
 
Join Date: Sep 2002
Location: Toronto+
Posts: 22,361
Occupancy
Reply With Quote
     
     
  #1055  
Old Posted Oct 23, 2014, 11:37 PM
LeftCoaster's Avatar
LeftCoaster LeftCoaster is offline
Moderator
 
Join Date: Nov 2005
Location: Toroncouver
Posts: 12,800
Tough on buildings like Aura, Ice etc... where occupancy is phased. occupancy has already started on Ice I but there is plenty of work occurring on the upper levels as well.
Reply With Quote
     
     
  #1056  
Old Posted Oct 23, 2014, 11:44 PM
Ramako's Avatar
Ramako Ramako is offline
Moderator
 
Join Date: Nov 2008
Location: Toronto
Posts: 4,409
Occupancy has already started with L Tower too and the crane's still up.
Reply With Quote
     
     
  #1057  
Old Posted Oct 24, 2014, 12:28 AM
Innsertnamehere's Avatar
Innsertnamehere Innsertnamehere is offline
Registered User
 
Join Date: Jan 2010
Location: Hamilton
Posts: 11,917
I generally consider it when exterior work has reached final completion. Interior fitout can continue for a year after the building appears complete.
Reply With Quote
     
     
  #1058  
Old Posted Oct 24, 2014, 1:08 AM
WhipperSnapper's Avatar
WhipperSnapper WhipperSnapper is offline
I am the law!
 
Join Date: Sep 2002
Location: Toronto+
Posts: 22,361
I'm fine with early occupancy. I adjust the date of completion anyways when the corp. Registers. Hoist should be down. Address on lobby entrance. Don't have time to visit each building anymore. Hope to do an update around Christmas. 20 to 25 towers will be shifted to completed.

I believe Aura's hoist is down but, occupancy hasn't started on the upper condo corp. The glass hasn't been completed on the hoist units either.
Reply With Quote
     
     
  #1059  
Old Posted Oct 24, 2014, 1:05 PM
caltrane74's Avatar
caltrane74 caltrane74 is offline
gettin' rich!
 
Join Date: Aug 2002
Location: Toronto
Posts: 34,193
Whatever method is used to determine completion, we are in an unusual spot where we have a number of 200 meter plus projects that will be coming off the list in a matter of months from each other, and there is no similar calibre and quantity of projects to re-enter the list to make up for this shortfall. I can only foresee 3 possible 200 meter plus towers starting in the next 6 months, with foundation/podium work beginning and nothing further for a possible 4th tower in Southcore.

This is weird, because while its great to have more completed 200 meter plus towers, this thread's body and soul is based on Highrise construction activity.
Reply With Quote
     
     
  #1060  
Old Posted Oct 25, 2014, 2:23 PM
travis3000's Avatar
travis3000 travis3000 is offline
Registered User
 
Join Date: Dec 2012
Location: Simcoe County, ON
Posts: 6,277
88 Scott has got its crane!
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada
Forum Jump



Forum Jump


All times are GMT. The time now is 9:40 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.