HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


View Poll Results: Based on options for Broadway Corridor Study, what is your preferred choice?
BRT: Commercial to UBC 25 6.16%
LRT A: Commercial to UBC OR Commercial via VCC to UBC 31 7.64%
LRT B: Main St. to UBC AND Commercial to UBC 18 4.43%
RRT: Commercial to UBC OR VCC to UBC 283 69.70%
COMBO: RRT to Arbutus/LRT to Main St via Arbutus 39 9.61%
BUS: Enhanced Bus Service for all buses to UBC 10 2.46%
Voters: 406. You may not vote on this poll

Closed Thread

 
Thread Tools Display Modes
     
     
  #1021  
Old Posted May 4, 2009, 12:51 AM
mr.x's Avatar
mr.x mr.x is offline
Registered User
 
Join Date: Dec 2003
Location: Stockholm
Posts: 12,805
NEW DEVELOPMENT



We've opened a comments page on the blog and we've also created a poll on route and construction methodology:
http://ubcskytrain.wordpress.com/yakking/
     
     
  #1022  
Old Posted May 8, 2009, 3:30 AM
metroXpress's Avatar
metroXpress metroXpress is offline
(||||||-||||-||||||)
 
Join Date: Jan 2009
Location: Vancouver B.C.
Posts: 2,220
I suggested the poll we have here for SKYTRAIN TO UBC to the Buzzer blog.

Read their reply via: http://buzzer.translink.ca/index.php/2009/05/wanted-questions-for-the-friday-fun-polls/

By Jhenifer Pabillano, May 7, 2009 @ 9:50 am
__________________
"Think simple…reduce the whole
of its parts into the simplest terms,
Getting back to first principles"


~ FRANK LLOYD WRIGHT
     
     
  #1023  
Old Posted May 10, 2009, 3:35 AM
Metro-One's Avatar
Metro-One Metro-One is offline
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 17,946
Here is a rendering of a new LRT station to be built in Calgary (a new extension of the C-train). So if the LRT supporters use the C train as an example (which now involves many elevated and underground kilometers in planned and u/c renovations and new construction) we can use this pic as an example. Where in hell would you fit stations this large along broadway with its narrow width and short blocks? This is why the C-train is able to achieve decent ridership levels, because for the most part it has its own ROW and where it is running along a street it has long and large stations.

That is about the width of 4 or 5 traffic lanes. Forget ever trying to widen the sidewalks along broadway or adding any design elements, left turn lanes, parking lanes, etc...

__________________
Bridging the Gap
Check out my Flickr: https://www.flickr.com/photos/30634635@N03/with/29495547810/ and Youtube channel https://www.youtube.com/channel/UCV0_0h9qKlhxXFxuAey_q6Q
     
     
  #1024  
Old Posted May 10, 2009, 4:10 AM
metroXpress's Avatar
metroXpress metroXpress is offline
(||||||-||||-||||||)
 
Join Date: Jan 2009
Location: Vancouver B.C.
Posts: 2,220
^ Yes, I saw this in the C-Train thread as well. It will be overly crowded if we were to have something like this on Broadway. Even elevated SkyTrain on Broadway would be terrible.....


Calgary's again...





and I came across this:
__________________
"Think simple…reduce the whole
of its parts into the simplest terms,
Getting back to first principles"


~ FRANK LLOYD WRIGHT
     
     
  #1025  
Old Posted May 10, 2009, 6:05 AM
Metro-One's Avatar
Metro-One Metro-One is offline
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 17,946
look at that pic of Japan, putting the greater good over the individual and functionality over what is "pretty." Again, that is why Japan has such great transportation systems, because there you can actually build an elevated heavy rail structure and the majority of people are glad to have it.

Also i find those structures create their own urban beauty among such vibrant cities. In Japan they actually know how to integrate elevated structures in to the city fabric correctly, instead of letting the land beneath them rot and die. I find the Georgia viaducts to be mixed bag. Having the skytrain and the skate park built under them along with a few other surface roads at the easter portion = an interesting and well used city scape, the cesspool in the middle portion of the viaducts = poor use of land and integration, then the portion that goes between GM place and the skytrain station and condo towers with at grade streets below and Costco bellow = excellent city scape and use of land

In fact that one small portion of downtown where there is GM place, BC place, several condo towers, at grade streets, public courtyards at the stadiums, shopping, two elevated road viaducts and the skytrain viaduct with a station all crammed in to such a small space is my favorite part of downtown. It has a true big city feel in which every square inch of land and air it utilized for functionality, and despite what some people would call having all these "ugly" structures, it has remained relatively vibrant with pedestrian activity.
__________________
Bridging the Gap
Check out my Flickr: https://www.flickr.com/photos/30634635@N03/with/29495547810/ and Youtube channel https://www.youtube.com/channel/UCV0_0h9qKlhxXFxuAey_q6Q
     
     
  #1026  
Old Posted May 10, 2009, 6:23 AM
mr.x's Avatar
mr.x mr.x is offline
Registered User
 
Join Date: Dec 2003
Location: Stockholm
Posts: 12,805
^ well, with Japan's density and commuter travel times (i believe the average daily commute time is 2 hours!) functionality would certainly take importance over everything else.
     
     
  #1027  
Old Posted May 10, 2009, 10:03 AM
Alex Mackinnon's Avatar
Alex Mackinnon Alex Mackinnon is offline
Can I has a tunnel?
 
Join Date: May 2008
Location: East Van
Posts: 2,202
That picture of japan may not look pretty, but if you look at it closer it has quite a high zoom to it. I'm sure if you took a picture down main st. between the viaduct and the skytrain it wouldn't look all that much different given the same lens setup.
__________________
"It's ok, I'm an engineer!" -Famous last words
     
     
  #1028  
Old Posted May 10, 2009, 5:53 PM
Metro-One's Avatar
Metro-One Metro-One is offline
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 17,946
If you go to Japan those viaducts (road, rail, and pedestrian) criss cross the cities. Some of them are very wide too.
__________________
Bridging the Gap
Check out my Flickr: https://www.flickr.com/photos/30634635@N03/with/29495547810/ and Youtube channel https://www.youtube.com/channel/UCV0_0h9qKlhxXFxuAey_q6Q
     
     
  #1029  
Old Posted May 10, 2009, 9:08 PM
racc racc is offline
BANNED
 
Join Date: Oct 2008
Posts: 1,241
Quote:
Originally Posted by Metro-One View Post
If you go to Japan those viaducts (road, rail, and pedestrian) criss cross the cities. Some of them are very wide too.
Closer to home, Granville Island is a great example of what can be done under elevated structures.

The problem is that we have too many lazy planners and urban designers that are not able or willing to do the work needed to create great public spaces beneath elevated structures.
     
     
  #1030  
Old Posted May 10, 2009, 9:41 PM
frinkprof's Avatar
frinkprof frinkprof is offline
Registered User
 
Join Date: Sep 2006
Location: The Gary
Posts: 4,865
Quote:
Originally Posted by Metro-One View Post
Here is a rendering of a new LRT station to be built in Calgary (a new extension of the C-train). So if the LRT supporters use the C train as an example (which now involves many elevated and underground kilometers in planned and u/c renovations and new construction) we can use this pic as an example. Where in hell would you fit stations this large along broadway with its narrow width and short blocks? This is why the C-train is able to achieve decent ridership levels, because for the most part it has its own ROW and where it is running along a street it has long and large stations.

That is about the width of 4 or 5 traffic lanes. Forget ever trying to widen the sidewalks along broadway or adding any design elements, left turn lanes, parking lanes, etc...

It should be noted that the station (26th Street Station) and some of the adjacent right of way pictured here in the median of Bow Trail was actually relocated due to changes made to appease a NIMBY group. It was originally to be on the north side of Bow Trail (left side of the rendering). The change was made because the elevated section to the east was shortened due to NIMBY concerns. These particular NIMBYs were fairly well organized and had their own website, which is still up (www.bestwestlrt.com, I suggest looking at the section Our Research -> How it Will Look for some laughs). Notice as well that access to this station will be from the crosswalk at the intersection near the top of this rendering. I personally think this is a bit of a safety concern, but it is mitigated by the fact that this will be a low-volume station.

At any rate, a lot of C-Train expansion, both currently under construction and proposed, has right-of-way reserved, in many cases years in advance as part of planning new subdivisions. I presume that Broadway does not have right-of-way reserved, so unless the LRT or Trams being proposed will be in-street running in mixed traffic, Broadway would need to be widened to accommodate the line.
     
     
  #1031  
Old Posted May 10, 2009, 10:57 PM
mr.x's Avatar
mr.x mr.x is offline
Registered User
 
Join Date: Dec 2003
Location: Stockholm
Posts: 12,805
^ LOL....WTF (points at the vandal):


From bewtwestlrt.com




Their website is absolutely retarded. Reading it just makes me sick.

It's unfortunate that they won that battle, but lets hope that they won't win future battles in both Calgary and Vancouver.
     
     
  #1032  
Old Posted May 10, 2009, 11:16 PM
frinkprof's Avatar
frinkprof frinkprof is offline
Registered User
 
Join Date: Sep 2006
Location: The Gary
Posts: 4,865
Quote:
Originally Posted by mr.x View Post
Their website is absolutely retarded. Reading it just makes me sick.

It's unfortunate that they won that battle, but lets hope that they won't win future battles in both Calgary and Vancouver.
They didn't fully win. It ended up as kind of a compromise. Oh yeah, and it ended up being $20M more expensive if you can believe it. This group mobilized fairly quickly so it might have made it difficult, but I would like to have seen a counter-group started to debunk some of their arguments, like what you guys are doing here. Anyway, I won't get into specifics so as not to turn this into a discussion about Calgary/C-Train.

Oh yeah, I don't know if it has happened yet or not, but I would be prepared to have one or more people representing their side of the argument to come on SSP to debate the issue. It happened with us, and while it wasn't drawn out, it wasn't pretty either.
     
     
  #1033  
Old Posted May 11, 2009, 4:57 AM
Kodii Kodii is offline
Registered User
 
Join Date: Dec 2008
Location: Vancouver
Posts: 341
Still no reply from the Rail to the Valley people? Maybe they are unaware of our response?

Or maybe we should reciprocate and claim that they are unable to respond to our arguments and therefore we "win". That is, if we are as arrogant as they were towards their own arguments.
     
     
  #1034  
Old Posted May 11, 2009, 8:15 AM
Metro-One's Avatar
Metro-One Metro-One is offline
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 17,946
In that render why would there be cracks in the structure? I have never seen cracks that numerous or extensive in the expo line structure and it is near 25 years old. What a bunch of garbage that render is. Also why is there graffiti on the houses as well? And why is there no graffiti on the elevated highway structure in the background? hehe.
__________________
Bridging the Gap
Check out my Flickr: https://www.flickr.com/photos/30634635@N03/with/29495547810/ and Youtube channel https://www.youtube.com/channel/UCV0_0h9qKlhxXFxuAey_q6Q
     
     
  #1035  
Old Posted May 11, 2009, 4:48 PM
metroXpress's Avatar
metroXpress metroXpress is offline
(||||||-||||-||||||)
 
Join Date: Jan 2009
Location: Vancouver B.C.
Posts: 2,220
Mr X and I suggested a discussion question on bepartoftheplan.ca....this is what they said:



Quote:
colleen, http://www.translink.bc.ca replies:
May 8th, 2009 at 2:42 pm

Hi Alain and X:

The UBC Line is an important discussion question, particularly because there are many people who are interested in weighing in on this topic. Unfortunately, it’s a bit too early to include the topic in this forum because we are currently in the early stages of the UBC Rapid Transit Study which is being undertaken with the Ministry of Transportation. As part of the study we are in the the midst of developing our consultation plan and we will be engaging with stakeholders and the public throughout the year. Look for more info about this in the coming months. You can also check out the consultation page on TransLink’s website for updates at http://www.translink.ca/en/Get-Involved/Public-Consultations/UBC-Rapid-Transit.aspx

One thing to keep in mind is that TransLink is facing a substantial funding shortfall, which is one of the key reasons that we are hosting this discussion. With this in mind, if we don’t find the funding for the shortfall we might not be able continue with the UBC project at all.
__________________
"Think simple…reduce the whole
of its parts into the simplest terms,
Getting back to first principles"


~ FRANK LLOYD WRIGHT
     
     
  #1036  
Old Posted May 11, 2009, 5:14 PM
DKaz DKaz is offline
Registered User
 
Join Date: Nov 2008
Location: Kelowna BC & Edmonton AB
Posts: 4,299
The renderrings are completely one sided, the vandals will go after elevated road/freeway structures as well. NIMBYism at its best. Maybe they should focus less on NIMBYing transit projects and more on creating youth groups to prevent them from straying into the wrong path.

Quote:
Originally Posted by mr.x View Post
^ well, with Japan's density and commuter travel times (i believe the average daily commute time is 2 hours!) functionality would certainly take importance over everything else.
Clarification, 2 hours EACH WAY!

Mine is 1:45 each way.
     
     
  #1037  
Old Posted May 11, 2009, 8:00 PM
Alex Mackinnon's Avatar
Alex Mackinnon Alex Mackinnon is offline
Can I has a tunnel?
 
Join Date: May 2008
Location: East Van
Posts: 2,202
Quote:
Originally Posted by DKaz View Post
The renderrings are completely one sided, the vandals will go after elevated road/freeway structures as well. NIMBYism at its best. Maybe they should focus less on NIMBYing transit projects and more on creating youth groups to prevent them from straying into the wrong path.



Clarification, 2 hours EACH WAY!

Mine is 1:45 each way.
And today's lesson is don't live in Mission kids.
__________________
"It's ok, I'm an engineer!" -Famous last words
     
     
  #1038  
Old Posted May 11, 2009, 8:18 PM
twoNeurons twoNeurons is offline
loafing in lotusland
 
Join Date: Aug 2002
Location: Lotusland
Posts: 6,114
Quote:
Originally Posted by DKaz View Post
The renderrings are completely one sided, the vandals will go after elevated road/freeway structures as well. NIMBYism at its best. Maybe they should focus less on NIMBYing transit projects and more on creating youth groups to prevent them from straying into the wrong path.



Clarification, 2 hours EACH WAY!

Mine is 1:45 each way.
To be fair... this commute time in Japan really primarily applies to the Tokyo area. It's often touted, because I think ~20% of Japan lives in this area.

Other cities are nowhere NEAR as bad.
     
     
  #1039  
Old Posted May 11, 2009, 8:44 PM
DKaz DKaz is offline
Registered User
 
Join Date: Nov 2008
Location: Kelowna BC & Edmonton AB
Posts: 4,299
Quote:
Originally Posted by Alex Mackinnon View Post
And today's lesson is don't live in Mission kids.
Shut up, I was working in Abbotsford before I decided to switch jobs. And in my defense, I get to work for an hour each way on the train so I only have to be in the office for 6 hours so nyeh.
     
     
  #1040  
Old Posted May 12, 2009, 12:31 AM
mr.x's Avatar
mr.x mr.x is offline
Registered User
 
Join Date: Dec 2003
Location: Stockholm
Posts: 12,805
Quote:
Originally Posted by Allen View Post
Mr X and I suggested a discussion question on bepartoftheplan.ca....this is what they said:

Actually no, I didn't suggest that.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 3:58 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.