Quote:
Originally Posted by bomberjet View Post
That stretch of #1 from Deacon to #12 was re-constructed completely about 10 years ago in both directions. Concrete on EB, asphalt on WB.

The chip seal they're doing is part of the process with Asphalt. Maintenance is required and being ~10 years out from the initial work, seems to be about right.
I also drove this stretch of Hwy this weekend. They did the chip seal thing in the travelled lanes. I don't know if they're planning to do anything else. Basically they "topped up" the lanes with a thin coat.
Reply With Quote
     
     
  #1002  
Old Posted Jul 28, 2021, 11:43 PM
Kinguni's Avatar
Kinguni Kinguni is offline
Registered User
 
Join Date: Mar 2008
Location: Manitoba
Posts: 1,450
Quote:
Originally Posted by bomberjet View Post
I also drove this stretch of Hwy this weekend. They did the chip seal thing in the travelled lanes. I don't know if they're planning to do anything else. Basically they "topped up" the lanes with a thin coat.
They've been adding another layer this week.
Reply With Quote
     
     
  #1003  
Old Posted Jul 29, 2021, 12:31 PM
anthonyk anthonyk is offline
Registered User
 
Join Date: Dec 2020
Location: SE Manitoba
Posts: 292
Functional design released for PTH 52 through Mitchell (2 miles W of Steinbach)

Hi Res Map

Slide Show
Reply With Quote
     
     
  #1004  
Old Posted Jul 29, 2021, 2:56 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 14,316
I was paying some attention to that Mitchell project. IMO they should've closed the Ash street access point and just had one at either end of town. There's no access from Ash to the south side of the highway, so there's really no point in having it.

Not everything needs to be a freeway. But I assume traffic volumes have picked up through there. It's already twinned so they're basically just closing median openings.
Reply With Quote
     
     
  #1005  
Old Posted Jul 29, 2021, 3:18 PM
anthonyk anthonyk is offline
Registered User
 
Join Date: Dec 2020
Location: SE Manitoba
Posts: 292
Quote:
Originally Posted by bomberjet View Post
I was paying some attention to that Mitchell project. IMO they should've closed the Ash street access point and just had one at either end of town. There's no access from Ash to the south side of the highway, so there's really no point in having it.

Not everything needs to be a freeway. But I assume traffic volumes have picked up through there. It's already twinned so they're basically just closing median openings.
I drive through this stretch often and one positive of this plan is 6 lanes in Mitchell so that the cars entering/leaving their driveways aren't interfering with the through lanes.
Reply With Quote
     
     
  #1006  
Old Posted Jul 29, 2021, 3:26 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 14,316
Oh ya that's nice with no service roads.

Maybe those houses with access to both maple and the highway should only have access from Maple.
Reply With Quote
     
     
  #1007  
Old Posted Jul 29, 2021, 4:08 PM
anthonyk anthonyk is offline
Registered User
 
Join Date: Dec 2020
Location: SE Manitoba
Posts: 292
Quote:
Originally Posted by bomberjet View Post
Oh ya that's nice with no service roads.

Maybe those houses with access to both maple and the highway should only have access from Maple.
Either that or a single lane frontage road separated from the two through lanes with a non mountable curb?

EDIT: Something like the north side of Fermor between St. Anne's Road & St. Mary's Road
Reply With Quote
     
     
  #1008  
Old Posted Jul 29, 2021, 4:52 PM
3de14eec6a 3de14eec6a is offline
Registered User
 
Join Date: Jan 2016
Posts: 206
Quote:
Originally Posted by anthonyk View Post
Either that or a single lane frontage road separated from the two through lanes with a non mountable curb?

EDIT: Something like the north side of Fermor between St. Anne's Road & St. Mary's Road
I swear they had something like that 30 years ago when I was growing up around there.

The whole 'town split by a highway' thing is shitty. People from the south have to cross it to get to any shops. But it's a major artery for people heading to Steinbach from anywhere further.

My suggestion is pedestrian tunnels underneath.
Reply With Quote
     
     
  #1009  
Old Posted Jul 29, 2021, 5:03 PM
Dengler Avenue's Avatar
Dengler Avenue Dengler Avenue is offline
Road Engineer Wannabe
 
Join Date: Sep 2017
Location: Côté Ouest de la Rivière des Outaouais
Posts: 8,276
Hmm… Why not 5 lanes with a median turn lane?
__________________
My Proposal of TCH Twinning in Northern Ontario
Disclaimer: Most of it is pure pie in the sky, so there's no need to be up in the arm about it.
Reply With Quote
     
     
  #1010  
Old Posted Jul 31, 2021, 4:45 PM
BuildUpWpg BuildUpWpg is offline
Registered User
 
Join Date: Nov 2014
Posts: 467
It's time for MIT and associated MB construction companies to modernize themselves and bring in new technology like below to help with our infrastructure deficit:

https://www.msn.com/en-ca/video/vira...q6F?ocid=wispr
Reply With Quote
     
     
  #1011  
Old Posted Jul 31, 2021, 5:06 PM
WildCake WildCake is offline
Registered User
 
Join Date: May 2016
Posts: 897
Quote:
Originally Posted by BuildUpWpg View Post
It's time for MIT and associated MB construction companies to modernize themselves and bring in new technology like below to help with our infrastructure deficit:

https://www.msn.com/en-ca/video/vira...q6F?ocid=wispr
I can't imagine that technology and pace of building would clock in any cheaper than conventional methods. So if we chip at that infrastructure deficit with that expensive technology we either get fewer projects or more financial debt.

As much as winnipegers or manitobans in general love to gripe about construction, there hasn't been any major construction project that has crippled traffic to a point that paying the huge premium for overnight work is worthwhile. Maybe when they replace the st james bridges in the forseeable future couple be an option but that's really it.
Reply With Quote
     
     
  #1012  
Old Posted Jul 31, 2021, 5:59 PM
anthonyk anthonyk is offline
Registered User
 
Join Date: Dec 2020
Location: SE Manitoba
Posts: 292
The new chip seal on WB #1 east of Winnipeg sure looks nice and all but man is it ever loud on the tires!!
Reply With Quote
     
     
  #1013  
Old Posted Jul 31, 2021, 9:27 PM
VANRIDERFAN's Avatar
VANRIDERFAN VANRIDERFAN is offline
Registered User
 
Join Date: Jan 2007
Location: Regina
Posts: 5,267
Just crossed into Manitoba from Saskatchewan on Highway 10(SK) - 5(MB). They are almost done repaving from the Manitoba border to Roblin. Coupled with the repaving of 83 from Roblin to Russell that’s a pretty nice chunk of Manitoba highway.

Last edited by VANRIDERFAN; Aug 3, 2021 at 7:33 PM.
Reply With Quote
     
     
  #1014  
Old Posted Aug 1, 2021, 5:28 AM
1ajs's Avatar
1ajs 1ajs is online now
ʇɥƃıuʞ -*ʞpʇ*-
 
Join Date: Jul 2005
Location: lynn lake
Posts: 26,065
would also help if contractors would stop paving during rain and wait for ground to dry.... causiing lots issues up here with stuff failing befor its finished
Reply With Quote
     
     
  #1015  
Old Posted Aug 3, 2021, 1:47 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 14,316
Quote:
Originally Posted by anthonyk View Post
The new chip seal on WB #1 east of Winnipeg sure looks nice and all but man is it ever loud on the tires!!
I drove that highway again this weekend (my diabetic cat gets kenneled in Ste Anne..... yes...)

It is quite loud! Hopefully will quite down after wear.
Reply With Quote
     
     
  #1016  
Old Posted Aug 3, 2021, 7:32 PM
VANRIDERFAN's Avatar
VANRIDERFAN VANRIDERFAN is offline
Registered User
 
Join Date: Jan 2007
Location: Regina
Posts: 5,267
Quote:
Originally Posted by bomberjet View Post
I drove that highway again this weekend (my diabetic cat gets kenneled in Ste Anne..... yes...)

It is quite loud! Hopefully will quite down after wear.
It never does. Sorry.
Reply With Quote
     
     
  #1017  
Old Posted Aug 3, 2021, 7:52 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 14,316
It seems like something that should be reserved for lesser highways. They should've left it alone and did a mill and fill in a coupe years.
Reply With Quote
     
     
  #1018  
Old Posted Aug 4, 2021, 4:58 PM
BuildUpWpg BuildUpWpg is offline
Registered User
 
Join Date: Nov 2014
Posts: 467
Quote:
Originally Posted by bomberjet View Post
It seems like something that should be reserved for lesser highways. They should've left it alone and did a mill and fill in a coupe years.
I guess we will never get used to MIT's low and inconsistent standards on our highways. One of my more recent gripes is that some secondary highways have a decent gravel shoulder with a white painted line along side of it, while many provincial trunk highways have sections that barely have a shoulder and the white painted lines are sporadic, if they exists at all. My car's lane keeping assist system really hates this.
Reply With Quote
     
     
  #1019  
Old Posted Aug 10, 2021, 7:22 PM
anthonyk anthonyk is offline
Registered User
 
Join Date: Dec 2020
Location: SE Manitoba
Posts: 292
Anyone have an idea on when the 16@1 roundabout work will start? Drove by yesterday and there wasn't any equipment on site and it looks as though nothing has begun.
Reply With Quote
     
     
  #1020  
Old Posted Aug 10, 2021, 7:38 PM
esquire's Avatar
esquire esquire is offline
Registered User
 
Join Date: Oct 2001
Posts: 37,483
Quote:
Originally Posted by anthonyk View Post
Anyone have an idea on when the 16@1 roundabout work will start? Drove by yesterday and there wasn't any equipment on site and it looks as though nothing has begun.
Maybe if no one ever mentions it, the roundabout idea will eventually be forgotten and MI can resume planning for an actual grade separated interchange at that intersection?

Otherwise we can probably look forward to this being a regular event, except with semis

Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump



Forum Jump


All times are GMT. The time now is 7:08 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.