HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan


Reply

 
Thread Tools Display Modes
     
     
     
     
  #1  
Old Posted Feb 1, 2018, 4:00 PM
saskatoonborn saskatoonborn is offline
Registered User
 
Join Date: Aug 2013
Posts: 297
Quote:
Originally Posted by The Bess View Post
Colliers says that east tower at river landing is now 20% leased
Well thats disappointing if its anywhere near accurate. I guess thats why they havent come out with more information regarding tennants since July.
Reply With Quote
     
     
  #2  
Old Posted Feb 1, 2018, 9:17 PM
scotty c scotty c is offline
Registered User
 
Join Date: Nov 2012
Posts: 205
Quote:
Originally Posted by saskatoonborn View Post
Well thats disappointing if its anywhere near accurate. I guess thats why they havent come out with more information regarding tennants since July.
They must have an anchor tenant whose currently tied up in another lease. I’m sure they’ll have a big announcement closer to completion where they’ll unveil it. Makes sense to keep the number low now Incase any other large companies are tempted by the riverfront. Might be able to hook a key tenant for the other tower that way.
Reply With Quote
     
     
  #3  
Old Posted Feb 2, 2018, 1:48 AM
The Bess The Bess is offline
Registered User
 
Join Date: Apr 2008
Posts: 890
The 20% is for 2 tenants MLT Aikins and RBC securities, if the report is accurate it says that more tenants will be announced in Q1 2018
Reply With Quote
     
     
  #4  
Old Posted Feb 2, 2018, 3:18 AM
roryn1 roryn1 is offline
Registered User
 
Join Date: Jun 2016
Posts: 1,040
Quote:
Originally Posted by The Bess View Post
The 20% is for 2 tenants MLT Aikins and RBC securities, if the report is accurate it says that more tenants will be announced in Q1 2018
I’ve heard MLT (2 Floors at Saskatoon Square?), RBC (1 Floor a Time saskatoonSquare?), and EY (2 Floors at Saskatoon Square?). Seems like more than 20%?
Reply With Quote
     
     
  #5  
Old Posted Feb 2, 2018, 3:48 PM
saskatoonborn saskatoonborn is offline
Registered User
 
Join Date: Aug 2013
Posts: 297
Quote:
Originally Posted by roryn1 View Post
I’ve heard MLT (2 Floors at Saskatoon Square?), RBC (1 Floor a Time saskatoonSquare?), and EY (2 Floors at Saskatoon Square?). Seems like more than 20%?
EY? Where did you hear that one? I couldn't find it anywhere.
Reply With Quote
     
     
  #6  
Old Posted Feb 2, 2018, 4:51 PM
chris's Avatar
chris chris is offline
Registered User
 
Join Date: Oct 2001
Location: Miami, FL
Posts: 1,738
What is Downtown Saskatoon's height limit? How high can buildings go throughout the downtown?
__________________
Go Habs.
Reply With Quote
     
     
  #7  
Old Posted Feb 2, 2018, 5:08 PM
Echoes's Avatar
Echoes Echoes is offline
Registered User
 
Join Date: Oct 2006
Location: Saskatoon, SK
Posts: 4,518
It's permitted as high as 95 m on the site where this project is. Throughout much of the rest of the downtown the limit is 76 m, but there is a height bonusing mechanism to allow buildings higher than that (with no real upper limit), provided certain amenities are provided and pending airport approvals.
__________________
SASKATOON PHOTO TOURS
2013: [Part I] [Part II] | [2014] | [2016] | [2022-25]
Reply With Quote
     
     
  #8  
Old Posted Feb 2, 2018, 5:20 PM
North_Regina_Boy North_Regina_Boy is offline
Registered User
 
Join Date: Mar 2010
Location: Regina, SK (formerly Saskatoon)
Posts: 1,474
Does anyone here wish the City could turn 19th and 3rd into a roundabout? Make that whole area cohesive and make a nice entrance to downtown.
Reply With Quote
     
     
  #9  
Old Posted Feb 2, 2018, 8:29 PM
Echoes's Avatar
Echoes Echoes is offline
Registered User
 
Join Date: Oct 2006
Location: Saskatoon, SK
Posts: 4,518
19th St from 2nd Ave to the Broadway Bridge needs to be redone to better tie in River Landing to Downtown.
__________________
SASKATOON PHOTO TOURS
2013: [Part I] [Part II] | [2014] | [2016] | [2022-25]
Reply With Quote
     
     
  #10  
Old Posted Feb 3, 2018, 1:05 AM
mitchellk12's Avatar
mitchellk12 mitchellk12 is offline
Moderator
 
Join Date: Sep 2015
Location: Nanaimo, British Columbia
Posts: 676
Quote:
Originally Posted by Echoes View Post
19th St from 2nd Ave to the Broadway Bridge needs to be redone to better tie in River Landing to Downtown.
Do you think that will happen? Aside from that...what your meaning on redone better? I see it as more walkability/transit friendly.
Reply With Quote
     
     
  #11  
Old Posted Feb 3, 2018, 1:31 AM
alt_center alt_center is offline
Registered User
 
Join Date: Aug 2017
Location: Saskatoon
Posts: 328
I think a roundabout at 3rd and 19th would be fantastic. There is a lot of room at that intersection. I hope when the construction is done they do something in that vicinity. The number of dead trees in that area (and River Landing itself) is appalling. It makes the whole area look rundown and uncared for.

Feb 2 2018 pics:



^^^^ Starting to look tall. I was wondering what, if anything, they might do about the blemishes on the exposed concrete ceilings. Well it looks like they tried powerwashing the lower floor ceilings in the last few days (although it can't be seen in this picture). I'm not sure how exactly that is done in -20C weather, but I can see they tried doing something. They still look pretty bad. But I imagine they want to do something before the glazing starts going on because then it will be really hard to properly clean.



^^^^ Condo 18th floor forms going up. Also it looks like half a 15th floor on the hotel. I thought it was topped out but I guess I was wrong. It might just be a mechanical room but clearly there is a 15th "floor".

Reply With Quote
     
     
  #12  
Old Posted Feb 7, 2018, 7:26 PM
The Bess The Bess is offline
Registered User
 
Join Date: Apr 2008
Posts: 890
On the Alt website it does state that it is 15 floors

https://www.groupegermain.ca/en/hotels/alt
Reply With Quote
     
     
  #13  
Old Posted Feb 7, 2018, 7:32 PM
The Bess The Bess is offline
Registered User
 
Join Date: Apr 2008
Posts: 890
But the meewasin review shows 15 as most likely mechanical floor as you stated.

https://meewasin.com/assets/upload/resou...hitectural%20review-MVA_%208.5%20X11.pdf
Reply With Quote
     
     
  #14  
Old Posted Feb 10, 2018, 3:10 AM
alt_center alt_center is offline
Registered User
 
Join Date: Aug 2017
Location: Saskatoon
Posts: 328
Thanks for the links Bess

Friday Feb 9 Pictures:



^^^^ This week they started interior walls in the Condo



^^^^ Last week I mentioned the blemishes on the ceilings. The above picture shows attempts to clean the 4th and 5th floor ceilings.



^^^^ Almost no progress on the concrete this week. Looks like lots of no parking signs for Saturday morning. Perhaps they are going to attempt to pour the 18th floor tomorrow (Sat).



^^^^ The excavators have not moved since last weekend.
Reply With Quote
     
     
  #15  
Old Posted Feb 11, 2018, 1:29 AM
The Bess The Bess is offline
Registered User
 
Join Date: Apr 2008
Posts: 890
I wonder if those blemishes were from something they put on the forms
Reply With Quote
     
     
  #16  
Old Posted Feb 11, 2018, 10:35 AM
Ricopedra Ricopedra is offline
Registered User
 
Join Date: Nov 2008
Posts: 729
If you're worried about the concrete finish before it's finished look at the first-floor ceiling/second-floor floor, from what you can see in the (appreciated) pic above, to get a better indication of the finished product. Even the second-floor ceiling isn't done yet. 'Nuff said;>)
Reply With Quote
     
     
  #17  
Old Posted Feb 15, 2018, 1:53 AM
The Bess The Bess is offline
Registered User
 
Join Date: Apr 2008
Posts: 890
Not really worried more curious about what caused it, by the way nice pic's Alt
Reply With Quote
     
     
  #18  
Old Posted Feb 15, 2018, 5:59 AM
Ricopedra Ricopedra is offline
Registered User
 
Join Date: Nov 2008
Posts: 729
Yea, the concrete takes the 'form' of the forms as it settles and dries, following and filling any lines and such and becoming a bit like the bottom of a cake, as it cures. That's my observation. Any concrete folks? Cheers, and Happy Chinese New Year!
Reply With Quote
     
     
  #19  
Old Posted Feb 16, 2018, 6:13 PM
Ricopedra Ricopedra is offline
Registered User
 
Join Date: Nov 2008
Posts: 729
Photo by Gustavo Valencia on flickr: https://flic.kr/p/24mvdkg




Gee, I'm already missing Alt's weekly update!>(

Last edited by Ricopedra; Feb 17, 2018 at 6:50 PM.
Reply With Quote
     
     
  #20  
Old Posted Feb 18, 2018, 3:55 AM
dsmmace dsmmace is offline
Registered User
 
Join Date: Jun 2012
Location: Saskatoon
Posts: 423
Concrete by nature does not have a consistent color, nor should you expect it to unless a color dye is introduced. So many variables...moisture, slight mixing differences (inconsistency), temperature, sun exposure, placing methods, UV exposure being a HUGE factor.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump



Forum Jump


All times are GMT. The time now is 7:29 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.