I expect things will be much the same, anybody expecting miracles will be disappointed. We all like to pride ourselves on such a successful LRT system, but it was all built under the former provincial government.

And if I'm wrong - great!
     
     
  #9602  
Old Posted May 7, 2015, 12:27 AM
MalcolmTucker MalcolmTucker is offline
Registered User
 
Join Date: May 2007
Posts: 11,592
Yeah, it isn't like there is a money tree, or in The Onion sense, a money hole.
     
     
  #9603  
Old Posted May 7, 2015, 5:10 PM
Socguy Socguy is offline
Registered User
 
Join Date: May 2008
Posts: 494
No, there's not a money tree but there is priorities in how the government spends money. Under the old regime untold millions were parceled out to Conservative voters and their pet projects in the rural areas of the Provence.

Considering that the NDP rode to power largely on the strength of the urban vote and considering that the priorities of that vote are changing in favor of things like transit (woefully underfunded by previous administrations), it would not surprise me to see a renewed commitment from the Provence to those priorities.
     
     
  #9604  
Old Posted May 7, 2015, 6:15 PM
shogged's Avatar
shogged shogged is offline
someone
 
Join Date: Oct 2007
Location: Calgary
Posts: 453
Quote:
Originally Posted by Socguy View Post
No, there's not a money tree but there is priorities in how the government spends money. Under the old regime untold millions were parceled out to Conservative voters and their pet projects in the rural areas of the Provence.

Considering that the NDP rode to power largely on the strength of the urban vote and considering that the priorities of that vote are changing in favor of things like transit (woefully underfunded by previous administrations), it would not surprise me to see a renewed commitment from the Provence to those priorities.
Great example of this is the hospital in Swan Hills. Town has a population of less than 2k and was built a MASSIVE hospital in exchange for the chemical dump site they put nearby. Today, the hospital barely has one doctor, the former operating room (lol!) is a bedroom for the makeshift EMS bay, and the vast majority of beds sit empty day after day. The busiest part of the hospital remains the private dental clinic that took over the space formerly used by the physio clinic. Best part, the road to the hospital named after Ken Kowalski who was the health minister and MLA for the area at the time of the deal

Last edited by shogged; May 7, 2015 at 6:27 PM.
     
     
  #9605  
Old Posted May 7, 2015, 6:29 PM
MalcolmTucker MalcolmTucker is offline
Registered User
 
Join Date: May 2007
Posts: 11,592
I have been in the room when the NDP opposed cutting funding for rural roads (like the bridges and culvert program) and rural hospitals.

It isn't like the NDP will close the hospital and sell the building. Gotta find things with real savings to direct money elsewhere. They are already counting on about $250 million in redirected savings to pay for other things like Education and PSE.
     
     
  #9606  
Old Posted May 7, 2015, 6:30 PM
lubicon's Avatar
lubicon lubicon is offline
Suburban dweller
 
Join Date: Jun 2003
Location: Calgary - our road planners are as bad as yours Edmonton
Posts: 5,047
Will be interesting to see how the proposed federal infrastructure spending (based on P3 funding of projects) jives with the NDP's likely reluctance to go P3 for anything. Those two funding models do not seem compatable.
__________________
Two things are infinite: the universe and human stupidity; and I'm not sure about the the universe.

Albert Einstein
     
     
  #9607  
Old Posted May 7, 2015, 6:42 PM
UofC.engineer's Avatar
UofC.engineer UofC.engineer is offline
Laura Palmer
 
Join Date: Nov 2010
Location: Twin Peaks, Calgary, AB
Posts: 1,033
Quote:
Originally Posted by lubicon View Post
Will be interesting to see how the proposed federal infrastructure spending (based on P3 funding of projects) jives with the NDP's likely reluctance to go P3 for anything. Those two funding models do not seem compatable.
Forgive my ignorance, why would any government be against P3 funding for infrastructure programs? What are the usual pro's and con's of a P3 funding model? Seems legit to me.

http://www.p3canada.ca/about-p3s/frequently-asked-questions/
     
     
  #9608  
Old Posted May 7, 2015, 6:44 PM
MalcolmTucker MalcolmTucker is offline
Registered User
 
Join Date: May 2007
Posts: 11,592
Well, profit = bad, so it must cost more, because of either cutting corners, lower standards, or other bad reasons, not because of value engineering, more efficient all in one contracting avoiding change orders and scope creep, or making long term choices to optimize capital cost versus maintenance cost.
     
     
  #9609  
Old Posted May 7, 2015, 11:43 PM
J-D J-D is offline
Registered User
 
Join Date: Mar 2010
Posts: 231
Quote:
Originally Posted by MalcolmTucker View Post
Well, profit = bad, so it must cost more, because of either cutting corners, lower standards, or other bad reasons, not because of value engineering, more efficient all in one contracting avoiding change orders and scope creep, or making long term choices to optimize capital cost versus maintenance cost.
There have been some very successful P3 projects, and some bad P3 projects. It's not a blanket success story.
     
     
  #9610  
Old Posted May 8, 2015, 2:07 AM
MalcolmTucker MalcolmTucker is offline
Registered User
 
Join Date: May 2007
Posts: 11,592
^ Of course! The big dig was the model of bad!
     
     
  #9611  
Old Posted May 8, 2015, 4:30 AM
sim sim is offline
Registered User
 
Join Date: Aug 2008
Posts: 863
Quote:
Originally Posted by MalcolmTucker View Post
^ Of course! The big dig was the model of bad!
Are you suggesting this to be the only one? I do notice that you seem to be a rather big proponent. I'll comment only in the realm of transportation. Here the success and economic efficiencies (especially if looking beyond project costs alone) of P3s is very mixed. I'd be hesitant to proclaim them as a mechanism that is cost effective and promoting them as something jurisdictions should always be considering...
     
     
  #9612  
Old Posted May 9, 2015, 3:16 PM
mwalker_mw mwalker_mw is offline
Registered User
 
Join Date: Apr 2008
Posts: 287
Quote:
Originally Posted by J-D View Post
There have been some very successful P3 projects, and some bad P3 projects. It's not a blanket success story.
There have been some VERY, VERY bad P3 projects as well. Just complete, utter crap.

P3 only works if the initial specification and requirements are airtight, otherwise you end up with a slum-lord overseeing a poorly assembled cardboard box.

Not to mention the importance of having someone with a clue oversee deficiencies and final sign off - seems to be the current standard is 'if it looks like the building is there - check-mark - done!'.... aesthetics, finishes and functional building systems be damned.
     
     
  #9613  
Old Posted May 10, 2015, 6:30 PM
J-D J-D is offline
Registered User
 
Join Date: Mar 2010
Posts: 231
Anyone in the know on the status of the new C-Trains that were ordered for 4 car trains? Wondering if the late 2015 - mid 2016 timeline is still considered accurate.
     
     
  #9614  
Old Posted May 10, 2015, 9:45 PM
CTrainDude CTrainDude is offline
Registered User
 
Join Date: Mar 2007
Posts: 517
Quote:
Originally Posted by J-D View Post
Anyone in the know on the status of the new C-Trains that were ordered for 4 car trains? Wondering if the late 2015 - mid 2016 timeline is still considered accurate.
The first of the new LRVs arrive late October of early November. 4 car trains start running officially in late December.
     
     
  #9615  
Old Posted May 11, 2015, 4:47 PM
UofC.engineer's Avatar
UofC.engineer UofC.engineer is offline
Laura Palmer
 
Join Date: Nov 2010
Location: Twin Peaks, Calgary, AB
Posts: 1,033
Looks like the Lynwood/Millican station has moved to the bottom of the hill. The new alignment adds another grade crossing at Millican road. I prefer the old alignment better.

http://www.calgary.ca/Transportation/TI/...line/green-line-ogden-revised-routes.pdf
     
     
  #9616  
Old Posted May 11, 2015, 8:13 PM
ByeByeBaby's Avatar
ByeByeBaby ByeByeBaby is offline
Crunchin' the numbers.
 
Join Date: Mar 2009
Location: T2R, YYC, 403, CA-AB.
Posts: 791
Quote:
Originally Posted by UofC.engineer View Post
Looks like the Lynwood/Millican station has moved to the bottom of the hill. The new alignment adds another grade crossing at Millican road. I prefer the old alignment better.

http://www.calgary.ca/Transportation/TI/...line/green-line-ogden-revised-routes.pdf
It was always at the bottom of the hill, the station just moved towards Millican Road.

I hope that whoever wrote that the proposed mass transit station "would provide access to the baseball diamonds at Pop Davies Park" is on suicide watch. Sure, there's billions of dollars being spent, but we are providing mass transit access to three rec league baseball diamonds now! All we need for this to truly be justified as a station is a change to the rules of baseball so that each team fields 2500 people.
     
     
  #9617  
Old Posted May 11, 2015, 8:34 PM
UofC.engineer's Avatar
UofC.engineer UofC.engineer is offline
Laura Palmer
 
Join Date: Nov 2010
Location: Twin Peaks, Calgary, AB
Posts: 1,033
Also noteworthy, the city has created a new page on their website dedicated to the SW BRT.

http://www.calgary.ca/Transportation/TI/Pages/Transit-projects/Southwest-Transitway.aspx
     
     
  #9618  
Old Posted May 11, 2015, 9:47 PM
Full Mountain's Avatar
Full Mountain Full Mountain is offline
YIMBY
 
Join Date: Aug 2008
Posts: 2,938
Quote:
Originally Posted by ByeByeBaby View Post
It was always at the bottom of the hill, the station just moved towards Millican Road.

I hope that whoever wrote that the proposed mass transit station "would provide access to the baseball diamonds at Pop Davies Park" is on suicide watch. Sure, there's billions of dollars being spent, but we are providing mass transit access to three rec league baseball diamonds now! All we need for this to truly be justified as a station is a change to the rules of baseball so that each team fields 2500 people.
Using the fields as part of the justification for that station, leaves me scratching my head.

What I really don't get is why is the station shown ~400ft long (assuming the bus shown is ~40ft long)? I get that we are building for upgradability, but it's likely that the concrete will need complete replacement before the demand necessitates LRT. This happened in a way to some of the current LRT platforms where significant lifecycle driven deck work had to be completed around the time the four car extensions were being done. If you do anything put in the foundations and conduit for underground utilities and leave them caped below grade, like they did with the foundations for the platform extensions.

__________________
Incremental Photo - @PhotogX_1

Disclaimer: All opinions expressed are my own not those of any affiliated organizations.
     
     
  #9619  
Old Posted May 11, 2015, 10:19 PM
CalgaryAlex's Avatar
CalgaryAlex CalgaryAlex is offline
Registered User
 
Join Date: Sep 2014
Location: Calgary
Posts: 617
Quote:
Originally Posted by Full Mountain View Post
Using the fields as part of the justification for that station, leaves me scratching my head.

What I really don't get is why is the station shown ~400ft long (assuming the bus shown is ~40ft long)? I get that we are building for upgradability, but it's likely that the concrete will need complete replacement before the demand necessitates LRT. This happened in a way to some of the current LRT platforms where significant lifecycle driven deck work had to be completed around the time the four car extensions were being done. If you do anything put in the foundations and conduit for underground utilities and leave them caped below grade, like they did with the foundations for the platform extensions.[/IMG]
Are they doing this so that if somehow they magically get a ton of money from the Provincial/Federal governments, they can get on with the LRT upgrade as soon as possible?

Also, I hope a whole bunch of the single detached homes around that station get gobbled up by a developer to introduce more density around the station.
     
     
  #9620  
Old Posted May 12, 2015, 4:36 PM
YYCguys YYCguys is offline
Registered User
 
Join Date: Sep 2006
Posts: 2,624
Quote:
Originally Posted by UofC.engineer View Post
Also noteworthy, the city has created a new page on their website dedicated to the SW BRT.

http://www.calgary.ca/Transportation/TI/Pages/Transit-projects/Southwest-Transitway.aspx
So let me get this straight....a transitway, according to the above link, is " a road or lane system dedicated exclusively to transit service.", yet the only dedicated lanes envisioned, according to the map in the link, are from Crowchild/Glenmore to Southland/14th. Why mixed traffic along the rest of the route? That would be more BRT than transitway, no?
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Calgary > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 4:53 AM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.