Quote:
Originally Posted by Chadillaccc
This is a great post. I totally agree. I think that no matter what, we have to get it right the first time, getting it right means undergound at least to 24 Avenue. Centre Street is already the backbone of northern Calgary (while Macleod is the backbone of Southern Calgary), we're just not a huge city yet. The Calgary Region expects a population of over 3 million by 2070 though, so that definitely correlates to what you were saying.
|
I don't really know which option I like best at this point. These are ideas I have had and haven't heard convincing answers to them (not that I disagree either, these are just thoughts).
I see two big assumptions everyone seems to already have made but we should be careful of:
- Grade-separation is the only way to have an efficient, high-capacity transit line
- The SE-LRT and Centre Street LRT must be connected
1.
Some grade separation is inevitable on major cross-streets (i.e. 16th Ave, McKnight, downtown etc.) but I don't know if I am sold on the argument that it is required entirely to have the speed, reliability and functionality that is required. Is it worth the expense? What else could we get if the price was half as much for not-grade-separating everything?
It's easy to conflate grade-separation and dedicated Right of Way. If we didn't hold auto-traffic to such a gold standard along this already primarily transit route what options could we do? It seems transit projects get dramatically inflated in price because we must do everything we can to avoid impacting car traffic.
We don't have good examples of these that I know of in North America - 36th Street is not a contender obviously - but many, many cities in Europe have high-capacity tram networks at the surface level, allowing full movement of pedestrians across, but reduce auto crossings to a minimum. You get nearly the same capacity and speed, but with significantly lower costs.
If you save $1 billion, could you build a similar tram to MRU - Currie Barracks - downtown for example? Would that be worth making a Airport Trail to Downtown route 5 minutes longer?
2.
The biggest reason I have heard for connecting the two is so they can share maintenance facilities, which is a great idea. What about passengers though? Is there much demand for a Centre Street to SE commute or will most get off in downtown? What if the SE LRT terminates at Eau Claire or 7th Avenue? Is maintenance facilities reason enough alone? If we don't integrate them, could there be other alternatives we could do?
All pie-in-the-sky ideas to be sure, but it seems there is risk of waiting forever to get really expensive & great transit, rather than getting a lot more cheaper and good transit that could potentially open up much more of the city to the transit lifestyle.
Not that expensive and great transit wouldn't be awesome