HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Hamilton > Downtown & City of Hamilton


Reply

 
Thread Tools Display Modes
     
     
  #861  
Old Posted Jun 5, 2023, 2:12 PM
atnor atnor is offline
Registered User
 
Join Date: Sep 2015
Posts: 396
Quote:
Originally Posted by TheHonestMaple View Post
What did he do this time?
See above, my post was late but everything insertnamehere is spot on.
Reply With Quote
     
     
  #862  
Old Posted Jun 13, 2023, 2:09 PM
johnnyhamont's Avatar
johnnyhamont johnnyhamont is offline
Registered User
 
Join Date: Dec 2015
Posts: 1,115
Photo from the weekend


Joe
Reply With Quote
     
     
  #863  
Old Posted Jul 13, 2023, 5:22 PM
PaperSun PaperSun is offline
Registered User
 
Join Date: Dec 2022
Posts: 147
Walked by this one yesterday, sorry didn't grab a picture. Structure is gone there was a bit of scrap metal left in the corner that they were loading to haul away. There was a massive dirt/gravel pile that they were filling the hole up and seemed to be grading to a certain point the site.

I know this one has underground parking and I have no construction experience so wasn't sure why they have to fill the site up before they begin digging the underground parking. For example the picture above my post here, that hole/ditch has been filled up.
Reply With Quote
     
     
  #864  
Old Posted Jul 13, 2023, 5:45 PM
Innsertnamehere's Avatar
Innsertnamehere Innsertnamehere is offline
Registered User
 
Join Date: Jan 2010
Location: Hamilton
Posts: 12,736
Quote:
Originally Posted by PaperSun View Post
Walked by this one yesterday, sorry didn't grab a picture. Structure is gone there was a bit of scrap metal left in the corner that they were loading to haul away. There was a massive dirt/gravel pile that they were filling the hole up and seemed to be grading to a certain point the site.

I know this one has underground parking and I have no construction experience so wasn't sure why they have to fill the site up before they begin digging the underground parking. For example the picture above my post here, that hole/ditch has been filled up.
they backfill the basements of demolished buildings so that caisson drill rigs can work before excavation starts.

This article explains the process of digging a condo garage:

https://urbantoronto.ca/news/2022/11...ng-built.50070

You basically need these large caisson drill rigs to drill deep holes in the ground to drop steel rods, called piles, which can then be used to "shore" up the walls of the excavation as it gets deeper:


https://urbantoronto.ca/news/2022/11...ng-built.50070

The end result is this:


https://urbantoronto.ca/news/2022/11...ng-built.50070

You can see the vertical steel rods which the shoring rigs place before excavation begins, with wooden slats placed between each pile as excavation progresses.

The caisson drill rigs need a flat surface to drive the piles however, so old basements are always temporarily backfilled while this work occurs before being excavated again.

If you don't backfill and install the piles, the pit walls would collapse inwards after a certain depth.

There is another element, tie-backs, which also happens as construction progresses involving the drilling of steel cables into the earth beside shored walls to support them.. These cables are then abandoned underground after construction is complete.

This some times causes issues...


There are a couple of variations of this process which can address different conditions, but that's the basics of it.
Reply With Quote
     
     
  #865  
Old Posted Jul 13, 2023, 5:46 PM
PaperSun PaperSun is offline
Registered User
 
Join Date: Dec 2022
Posts: 147
Awesome, thanks for the explanation!
Reply With Quote
     
     
  #866  
Old Posted Jul 13, 2023, 5:56 PM
Innsertnamehere's Avatar
Innsertnamehere Innsertnamehere is offline
Registered User
 
Join Date: Jan 2010
Location: Hamilton
Posts: 12,736
No problem! A fun Hamilton-related fact is that the largest provider of caisson drill rigs in Ontario, Bauer Equipment, is actually based in Stoney Creek.
Reply With Quote
     
     
  #867  
Old Posted Jul 13, 2023, 7:15 PM
urban_planner urban_planner is offline
Registered User
 
Join Date: Feb 2009
Posts: 822
They did the same thing at 75 James South.
__________________
I think its the best city of its size on earth.
Reply With Quote
     
     
  #868  
Old Posted Jul 13, 2023, 7:52 PM
ScreamingViking's Avatar
ScreamingViking ScreamingViking is offline
Ham-burgher
 
Join Date: Jun 2013
Location: Hamilton
Posts: 7,397
And the surface of this one is along the "ridge" of the sandbar that runs diagonally across the core, all the way from Burlington Heights. Bedrock will probably be deeper than other sites downtown.

Technical info is always welcome. Thank you!
Reply With Quote
     
     
  #869  
Old Posted Jul 16, 2023, 3:09 PM
TheHonestMaple's Avatar
TheHonestMaple TheHonestMaple is offline
Registered User
 
Join Date: Aug 2016
Posts: 1,833
This one also has the train tunnel immediately adjacent, which should keep things interesting. I'm really excited to watch this one go up, they are probably going to be the nicest looking buildings in Hamilton!
Reply With Quote
     
     
  #870  
Old Posted Jul 16, 2023, 8:28 PM
King&James's Avatar
King&James King&James is offline
Registered User
 
Join Date: Mar 2013
Location: Hamilton
Posts: 1,321
Oh oh, train tunnel, is this where CN pulls out a yellow card and holds up another development at well beyond the 11th hour?!
Reply With Quote
     
     
  #871  
Old Posted Jul 16, 2023, 8:40 PM
mikevbar1 mikevbar1 is offline
Registered User
 
Join Date: Dec 2017
Posts: 216
Quote:
Originally Posted by King&James View Post
Oh oh, train tunnel, is this where CN pulls out a yellow card and holds up another development at well beyond the 11th hour?!
Well, it's CP this time, who usually give the public sector a harder time in general... But believe me, I'm sure the tunnel is something that CP would like people to keep quiet about. Their tunnel is, in quite a few ways, knowingly a net negative for the public. Being only one track limits GO service, it's super hard to modify, etc. And it's not like development directly impacts a yard or anything. If they have any issues, then they ought to be prepared to modify or upgrade the tunnel to mitigate things, not the city or a developer! CN can at least say they are generous with the amount of trains they let through. CP doesn't really have as much good faith to go around with anyone, lol.
__________________
Steeltowner & Urban Planning Undergrad.
Reply With Quote
     
     
  #872  
Old Posted Jul 22, 2023, 11:08 PM
urban_planner urban_planner is offline
Registered User
 
Join Date: Feb 2009
Posts: 822
Shoring rigs on site

__________________
I think its the best city of its size on earth.
Reply With Quote
     
     
  #873  
Old Posted Jul 25, 2023, 7:09 PM
SteelTown's Avatar
SteelTown SteelTown is online now
It's Hammer Time
 
Join Date: Mar 2004
Location: Hamilton
Posts: 20,304
Since shoring is happening, an update

Television city condos | 109 m | 32 & 32 fl | Approved -> Television city condos | 109 m | 32 & 32 fl | Under Construction
Reply With Quote
     
     
  #874  
Old Posted Jul 25, 2023, 7:50 PM
King&James's Avatar
King&James King&James is offline
Registered User
 
Join Date: Mar 2013
Location: Hamilton
Posts: 1,321
Quote:
Originally Posted by SteelTown View Post
Since shoring is happening, an update

Television city condos | 109 m | 32 & 32 fl | Approved -> Television city condos | 109 m | 32 & 32 fl | Under Construction
Wow, 5 1/2 years after the first post, been a long time acoming ....and we probably have another 2.5 years to go
Reply With Quote
     
     
  #875  
Old Posted Jul 25, 2023, 8:19 PM
Innsertnamehere's Avatar
Innsertnamehere Innsertnamehere is offline
Registered User
 
Join Date: Jan 2010
Location: Hamilton
Posts: 12,736
With 5 levels of underground, I would be surprised to see this done in 2.5 years. More like 3.5. We'll be lucky to see this at grade come fall 2024.
Reply With Quote
     
     
  #876  
Old Posted Jul 25, 2023, 9:02 PM
PaperSun PaperSun is offline
Registered User
 
Join Date: Dec 2022
Posts: 147
Photos taken July 25


Reply With Quote
     
     
  #877  
Old Posted Jul 30, 2023, 7:36 AM
Markus83's Avatar
Markus83 Markus83 is offline
Registered User
 
Join Date: May 2015
Location: Hamilton
Posts: 478
Taken a few days ago.
Reply With Quote
     
     
  #878  
Old Posted Aug 19, 2023, 2:24 PM
TheHonestMaple's Avatar
TheHonestMaple TheHonestMaple is offline
Registered User
 
Join Date: Aug 2016
Posts: 1,833
I wanted to bring these images back up to the top.



Reply With Quote
     
     
  #879  
Old Posted Aug 21, 2023, 12:23 AM
Davis137's Avatar
Davis137 Davis137 is offline
Registered User
 
Join Date: Aug 2008
Posts: 2,357
Man, if those 2 towers look even close to those renders, they will be stunning...
Reply With Quote
     
     
  #880  
Old Posted Aug 21, 2023, 11:41 AM
TheHonestMaple's Avatar
TheHonestMaple TheHonestMaple is offline
Registered User
 
Join Date: Aug 2016
Posts: 1,833
Quote:
Originally Posted by Davis137 View Post
Man, if those 2 towers look even close to those renders, they will be stunning...
Brad Lamb creates quality developments. This is a copy paste job of his King Charlotte project in Toronto, it looks to be anyway.

Lamb gets a lot of flack on this forum for some reason, but the truth is he's a great developer that cares about Toronto/Hamilton and wants to see the city progress. I'm very happy he got into Hamilton, even though the backwards city staff sent him running after a few years. He ditched most of his projects here, this is the only one that remains.

Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Hamilton > Downtown & City of Hamilton
Forum Jump



Forum Jump


All times are GMT. The time now is 2:11 AM.

     
SkyscraperPage.com - Privacy Statement - Top