Quote:
Originally Posted by migol24
does anyone think they'll finish by november? it's already june they don't even look half-way done.
|
There aren't many permanent structures on the track, and they've mostly all been topped out, so it really comes down to paving and getting the entrances/parking lots/fencing done. The paving seems to be something they can do relatively quickly, judging by what they've done so far.
The majority of the grandstands will be the temporary kind, like they use on street courses. They still need to construct permanent grandstands at T1 and T15, at least according to their plan.
Also, technically they have to be ready for inspection on Sept 25, not November. That means all the race-critical stuff has to be done by then. Things like the amphitheater/tower and landscaping won't have to be done by that date. I suppose those things could even be put off til after the race.
I expect they'll get it done. They aren't even working 24x7 or 7 days a week yet. So they can always do that if they really have to catch up (if they have the $$$ for all the overtime).