I'm going to try to get some pictures and a real update done as soon as I get back to Calgary in a week and a half, but here's a rundown of what I've seen so far.
-The new CSE at CBU looks like it's going to be a fairly impressive addition to the University. It's a different take on architecture for CBU, one of the bonuses of young universities not have a "everything must look the same" policy on new buildings.
- The Membertou Hotel is on the second floor, and there's site clearing activity on the new access road (Churchill Dr) near the hospital end for a new development, though I'm not sure what yet.
- The new senior's residence is topped out at Harbourview (can't remember the name and too lazy to look back a couple of posts at the moment), and it looks to be only 3 floors.
- There's equipment on site for the new overpass at George St, but that's the only clue so far that the Hwy 125 twinning project is moving into it's final stage.
- I'm disappointed with the fitness centre on Prince St. It looks ok from the side directly facing Prince St even though it's only 1 storey, but coming down the hill from George St (a very visible side that should have been better considered obviously), the first thing you see is corrugated steel siding.
- And at the opposite end of the spectrum, the YMCA is onto the front side (Charlotte St) renovations, and includes wood cladding. This one just got a whole lot sexier.
- The Vista heights renovations are using that baby blue colour for the outside cladding. I'm still not a huge fan, but it does actually look a whole lot better than the old stuff.
- Garth Wilson Dr (SPAR Rd Power Centre) is now open. I'd expect development to move in the same fashion it has been there, with the same company running both the Mayflower Mall and the Power Centre. Grand Lake Crossings looks nearly full (only got a glance at it) and looks like your typical strip mall. This area is more interesting for the increased retail offerings in the area than for architectural value. In other words, it's your typical power centre.
That's it for now. I'll add stuff as I see it, but I'm only here until Wednesday, unfortunately. After that it's back to Fredericton for a week. I already spent a couple of days there, hoping to get pictures but I'll save my synopsis until I get a chance to see more. Unfortunately, I'm a lot less mobile there than I am here.