Quote:
Originally Posted by freerover
Anyway, I think an interesting question is what the priorities are if more federal funds are available. I would say extending the orange line to Tech Ridge and Slaughter, then all the small stuff that got cut (red line improvements, green line extension, BRT lines etc.) and then the gold line LRT would be my lowest priority.
|
I believe that by the "contract with the voters" the gold line would take priority over any additional red/green expansions, at least for any federal funds matched by Project Connect local taxes*. The Gold Line is in the overall 10B plan, it just got delayed from the 7B plan. Extra red line work (full double tracking) and green line to Elgin aren't even in the 10B plan (and honestly CoA money shouldn't go towards the Manor to Elgin segment).
*They did say (at the time they cut the red line double tracking from Project Connect) that there was the possibility to go for a future "core capacity" upgrade money from the feds. I'm not sure if the new bill expands that any, and even if so, presumably there would need to be some local match and a different source of that.
CapMetro, in its own budget (separate from project connect) did start the process of saving money for the Green line segment to Manor. There's not a lot there yet, and it probably would have to wait until after the first green segment, so it's probably not a good project for federal funds yet.