Quote:
Originally Posted by gaviscon
Maybe possible if we reach first or second floor by the end of this year?
The floorplate of the hotel is pretty small. Construction should accelerate once we reach ground level
|
The hotel floorplate includes the new block on the corner with Beatty, and two floors behind the heritage building facade above the ground floor retail / restaurant space. Before they proposed to add more hotel space earlier this year, it was expected that completion would be September 2026. That seems optimistic, as they're only just getting to ground level with parkade construction, and the revised design with greater height hasn't even been rezoned yet - the consultation period only ended last week.