Quote:
Originally Posted by Sir Conga
You might be right, I really have no idea. Keep in mind though, that a lot of those shots are only a week apart. I just live so close that it's easy to keep updating, even when not much has happened.
|
To put this into perspective...a 6000+ tower floor plate should be turned around in some around 7 to 10 days...now a smaller scale building will take longer, site constraints, size etc play into it... but it strikes me as a floor is taking a helluva lot more than it should, especially considering the dynamics of the structure of that building are about as simplistic as it can get.