  #61  
Old Posted Jul 8, 2018, 9:42 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,061
Underground parking level for 10s moving along well. The office building concrete core for elevators and stairs is nearly done and structural steel is up to second floor now.

Structural steel skeleton should be installed by end of July if they keep this pace.
Reply With Quote
     
     
  #62  
Old Posted Jul 9, 2018, 1:49 AM
rml rml is offline
Registered User
 
Join Date: Feb 2017
Location: London
Posts: 46
beers and shoes

Quote:
Originally Posted by kaiserLDN View Post
Nice. Looking forward to the pics. Pretty cool development.
I had a beer in the brew and shoes that is there that other day. great idea although i don't know if sustainable. hopefully it is

I also saw they are doing a farmers market in there now, that is a good idea i think.

anyone else know what is going in there?
Reply With Quote
     
     
  #63  
Old Posted Jul 24, 2018, 10:13 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,061
Steel girders upto the 4th fl level now installed on office building. Parking levels for 10s building still under heavy work with the west side now showing above ground level.
Reply With Quote
     
     
  #64  
Old Posted Aug 3, 2018, 10:33 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,061
Steel not done yet but this week they installed the concrete pre-cast floor slabs up to the 3 floor on the office building. They are also above ground now on part of the apartment building.
Reply With Quote
     
     
  #65  
Old Posted Aug 13, 2018, 12:33 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,061
4th fl concrete floor slabs installed now on office building.
Reply With Quote
     
     
  #66  
Old Posted Sep 7, 2018, 10:58 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,061
Major portion of ground floor for apartment building and parking now done.
Reply With Quote
     
     
  #67  
Old Posted Sep 12, 2018, 10:38 AM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,061
Roof being installed this week on the office building. Apartment building 1st floor level very active this week with concrete pours.
Reply With Quote
     
     
  #68  
Old Posted Sep 20, 2018, 7:10 PM
Djeffery Djeffery is offline
Registered User
 
Join Date: Oct 2017
Location: London
Posts: 4,761
Sewer work is starting towards the east side of the site, by the Oxford and Commissioners intersection.
Reply With Quote
     
     
  #69  
Old Posted Sep 25, 2018, 9:34 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,061
Structural steel being installed for mech penthouse on 4s office building. Would expect the exterior walls to start soon.
Reply With Quote
     
     
  #70  
Old Posted Sep 26, 2018, 3:32 PM
MrSlippery519 MrSlippery519 is offline
Registered User
 
Join Date: Dec 2010
Posts: 1,105
^^^ some of that has already began on the backside facing away from Oxford. If people want some updated pictures I can walk over there this weekend.

The new apartments are starting floor # 2 as of last night, I am quite excited to see how that turns out with the curved corner of the building. That is the 10 story building which they say wont be finished until April 2020 which does not make much sense.
Reply With Quote
     
     
  #71  
Old Posted Oct 7, 2018, 12:21 AM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,061
Good progress on the 4s office building 1st floor exterior walls. Even internal walls being installed around the elevator entrances on the 2nd floor.
Reply With Quote
     
     
  #72  
Old Posted Oct 22, 2018, 11:34 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,061
2nd floor nearly done on apt building. Work continues on interior and exterior wall framing for office building.
Reply With Quote
     
     
  #73  
Old Posted Oct 30, 2018, 12:18 AM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,061
Reply With Quote
     
     
  #74  
Old Posted Nov 6, 2018, 1:34 AM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,061
3rd floor posts and walls now being poured on 10s.
Reply With Quote
     
     
  #75  
Old Posted Nov 24, 2018, 11:42 AM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,061
4th Floor slab pour started.
Reply With Quote
     
     
  #76  
Old Posted Dec 6, 2018, 12:40 AM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,061
4th floor wall forms and posts well along on west side of residential tower.
Reply With Quote
     
     
  #77  
Old Posted Dec 12, 2018, 12:16 AM
Djeffery Djeffery is offline
Registered User
 
Join Date: Oct 2017
Location: London
Posts: 4,761
Picture from a couple weeks ago looking south towards the office and residential building.

Reply With Quote
     
     
  #78  
Old Posted Jan 11, 2019, 12:02 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,061
5th fl posts and wall now started on the residential tower. The office building almost all enclosed now. Exterior coverings and windows will likely be starting soon.
Reply With Quote
     
     
  #79  
Old Posted Jan 11, 2019, 4:44 PM
Djeffery Djeffery is offline
Registered User
 
Join Date: Oct 2017
Location: London
Posts: 4,761
I do believe when I drove by the other day that I saw the west crane has been taken down. The one on the right side of the picture above, that appears to have been working the parking garage
Reply With Quote
     
     
  #80  
Old Posted Jan 17, 2019, 4:44 PM
MrSlippery519 MrSlippery519 is offline
Registered User
 
Join Date: Dec 2010
Posts: 1,105
Yes only 1 crane now, the parking area one was taken down.

They are up to the 5th level now on the apartment building so we should start to see the setbacks. Seems odd they are saying this wont be finished until 2020, the pace has been quite fast so far and while interior work will take a lot of time I find it hard to imagine another year or more to finish
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > London > Projects & Construction Updates
Forum Jump



Forum Jump


All times are GMT. The time now is 6:57 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.