HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada


Reply

 
Thread Tools Display Modes
     
     
  #61  
Old Posted Apr 23, 2015, 2:50 PM
caltrane74's Avatar
caltrane74 caltrane74 is offline
gettin' rich!
 
Join Date: Aug 2002
Location: Toronto
Posts: 34,192
Thank god, the TTC didn't get rid of the streetcars. The NEW Machines are almost as comfortable as subways, just slower. We got lucky here!!!
Reply With Quote
     
     
  #62  
Old Posted Apr 24, 2015, 2:41 PM
SkahHigh's Avatar
SkahHigh SkahHigh is offline
More transit please
 
Join Date: Jul 2013
Location: Montreal
Posts: 3,794
Encouraging news from Montreal (finally)

Two days ago at the National Assembly, we learned from Municipal Affairs minister Pierre Moreau that the Blue line extension project office will release it's final report in December 2015, and that part of funding might come from the Caisse. At that time, we will learn what mode will be used (Metro, tram-train, elevated light rail).

Here's a reminder of what the extension towards Anjou looks like:


http://i2.wp.com/lenavet.ca/wp-conte...ize=1110%2C453
Reply With Quote
     
     
  #63  
Old Posted Apr 24, 2015, 3:05 PM
Metro-One's Avatar
Metro-One Metro-One is offline
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 17,058
Why would they switch technologies? Is it not just a 5 station extension of the existing line, and therefore should have the exact same technology?
__________________
Bridging the Gap
Check out my Flickr: https://www.flickr.com/photos/306346...h/29495547810/ and Youtube channel https://www.youtube.com/channel/UCV0...lhxXFxuAey_q6Q
Reply With Quote
     
     
  #64  
Old Posted Apr 24, 2015, 3:10 PM
SkahHigh's Avatar
SkahHigh SkahHigh is offline
More transit please
 
Join Date: Jul 2013
Location: Montreal
Posts: 3,794
Quote:
Originally Posted by Metro-One View Post
Why would they switch technologies? Is it not just a 5 station extension of the existing line, and therefore should have the exact same technology?
They wouldn't switch. The government wants the most effective and less expensive system available. If that means a tram line going East and connecting at Saint-Michel station to serve more people at a lesser price they might consider it. The idea of imposing a transfer is pretty stupid though.

The extension was announced by the PQ in 2012 and is now being delayed with the Liberals. Although I think something will be completed before the end of 2020.
Reply With Quote
     
     
  #65  
Old Posted Apr 24, 2015, 3:18 PM
esquire's Avatar
esquire esquire is offline
Registered User
 
Join Date: Oct 2001
Posts: 37,483
Quote:
Originally Posted by Metro-One View Post
Why would they switch technologies? Is it not just a 5 station extension of the existing line, and therefore should have the exact same technology?
+1

That seems a bit half-assed and a good way to discourage ridership. Why not reduce the extension by one stop and use the savings to make it a Metro extension instead of one of the other modes?
Reply With Quote
     
     
  #66  
Old Posted Apr 24, 2015, 3:23 PM
1overcosc's Avatar
1overcosc 1overcosc is offline
Registered User
 
Join Date: Jun 2013
Location: Eastern Ontario
Posts: 11,877
Toronto did exactly the same thing on the Sheppard route... the subway only goes to Don Mills thanks to the austerity cuts of the 1990s, and the extension is going to be an LRT. Then again, in Toronto it makes more sense considering ridership numbers and the fact that the Sheppard subway was a mistake in the first place (by contrast, the Blue line is a solid metro route).
Reply With Quote
     
     
  #67  
Old Posted Apr 24, 2015, 3:24 PM
SkahHigh's Avatar
SkahHigh SkahHigh is offline
More transit please
 
Join Date: Jul 2013
Location: Montreal
Posts: 3,794
Quote:
Originally Posted by esquire View Post
+1

That seems a bit half-assed and a good way to discourage ridership. Why not reduce the extension by one stop and use the savings to make it a Metro extension instead of one of the other modes?
I'm asking myself the same question... The AMT was already conducting studies, so I think the MTQ only asked them to study the impact of others modes. I believe it'll be done underground though.

And yes, the government is trying to fix it's finances. Hence the Caisse having to invest in future transit projects. The reconstruction of the Turcot Interchange will cost 5 billion itself, so the MTQ doesn't have as much money as Ontario to invest in public transit.
Reply With Quote
     
     
  #68  
Old Posted Apr 24, 2015, 3:24 PM
1overcosc's Avatar
1overcosc 1overcosc is offline
Registered User
 
Join Date: Jun 2013
Location: Eastern Ontario
Posts: 11,877
The model Quebec has chosen for its transit management--having the Caisse fund it--is probably incompatible with the P3 model the federal government is demanding as a condition for access to the new transit fund. Setting the stage for another Federal-Quebec showdown?
Reply With Quote
     
     
  #69  
Old Posted Apr 24, 2015, 3:26 PM
1overcosc's Avatar
1overcosc 1overcosc is offline
Registered User
 
Join Date: Jun 2013
Location: Eastern Ontario
Posts: 11,877
Is the Pie-IX corridor still supposed to be BRT (or SRB, as it's called in Quebec)? I thought I heard they were thinking about switching to LRT.
Reply With Quote
     
     
  #70  
Old Posted Apr 24, 2015, 3:32 PM
SkahHigh's Avatar
SkahHigh SkahHigh is offline
More transit please
 
Join Date: Jul 2013
Location: Montreal
Posts: 3,794
Quote:
Originally Posted by 1overcosc View Post
Is the Pie-IX corridor still supposed to be BRT (or SRB, as it's called in Quebec)? I thought I heard they were thinking about switching to LRT.
It's supposed to be BRT but it should be switched to LRT, IMO. The ridership potential on that line is huge. They should also at least do a one station extension of the Blue line so the BRT/LRT can connect effectively with the Metro system.
Reply With Quote
     
     
  #71  
Old Posted Apr 24, 2015, 5:16 PM
Aylmer's Avatar
Aylmer Aylmer is offline
Still optimistic
 
Join Date: Nov 2007
Location: Montreal (C-D-N) / Ottawa (Aylmer)
Posts: 5,384
Quote:
Originally Posted by esquire View Post
+1

That seems a bit half-assed and a good way to discourage ridership. Why not reduce the extension by one stop and use the savings to make it a Metro extension instead of one of the other modes?
There's another element at play here - the Orange line is already past capacity, so we can't add more passengers at Jean Talon. What they should do instead is build the metro out to Pie IX and build LRT from Downtown to Laval via René Lévesque and Pie IX with a spur turning off at Jean Talon to Anjou. You avoid a costly metro extension under bungalows and duplexes, you provide direct service for more people and you avoid burdening the Orange Line any more than It already is. Probably cost less too.

EDIT:

Something similar to this:



Or this, plus an extension all the way downtown

__________________
I've always struggled with reality. And I'm pleased to say that I won.
Reply With Quote
     
     
  #72  
Old Posted Apr 24, 2015, 5:41 PM
SkahHigh's Avatar
SkahHigh SkahHigh is offline
More transit please
 
Join Date: Jul 2013
Location: Montreal
Posts: 3,794
^great alternatives. I saw the tram one (2nd proposal) a few months ago and thought it was a good idea. Unfortunately this isn't an official proposal made by the STM or the AMT...

What we do know is, massive transit investments are coming to Montreal in the next five years. We know at least 50km of LRT (two new lines) will be built, plus the BRT on Pie-IX and a possible Blue line extension.

Last edited by SkahHigh; Apr 27, 2015 at 9:05 PM.
Reply With Quote
     
     
  #73  
Old Posted Apr 30, 2015, 12:41 PM
Metro-One's Avatar
Metro-One Metro-One is offline
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 17,058
Here is a great update of the Evergreen Line east of the tunneled section.

I really like the use of wood, adds a nice West Coast character to the stations. I also really like the variety in super structures.

For me such grade separated projects feel so much more urban / metropolis as far as rail projects go.


Quote:
Originally Posted by nname View Post
Took a walk last Sunday along the eastern portion of Evergreen Line:

Lafrage Lake-Douglas Station






Guideway between Lafrage and Lincoln


Coquitlam Central Station






Guideway along Aberdeen Ave. This section was still under construction when I was here 2 months ago, but its now completed.


East end of VSF. This was only a pile of dirt two months ago.


Inlet Centre Station with glasses and escalators installed.


Moody Centre Station




West of Moody Centre, column for future Moray-Clarke connector?




I don't think you can get this close to the track elsewhere in the system?


Not sure if this is the site for future station in west Port Moody.


Elevated guideway east of north tunnel portal.


North portal plus the new route for Trans-Canada Trail beside the guideway.
__________________
Bridging the Gap
Check out my Flickr: https://www.flickr.com/photos/306346...h/29495547810/ and Youtube channel https://www.youtube.com/channel/UCV0...lhxXFxuAey_q6Q
Reply With Quote
     
     
  #74  
Old Posted Apr 30, 2015, 12:59 PM
eemy's Avatar
eemy eemy is offline
Closed account
 
Join Date: Aug 2006
Posts: 4,456
Does anyone know what the expected life span is for the elevated structures on the Skytrain?
Reply With Quote
     
     
  #75  
Old Posted Apr 30, 2015, 1:07 PM
Metro-One's Avatar
Metro-One Metro-One is offline
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 17,058
100 years, but I am sure when the time comes they can be maintained for longer, like every other bridge structure in the world.

The West Coast climate is also much more forgivable in general for such structures than pretty much anywhere else in Canada.
__________________
Bridging the Gap
Check out my Flickr: https://www.flickr.com/photos/306346...h/29495547810/ and Youtube channel https://www.youtube.com/channel/UCV0...lhxXFxuAey_q6Q
Reply With Quote
     
     
  #76  
Old Posted Apr 30, 2015, 2:41 PM
1overcosc's Avatar
1overcosc 1overcosc is offline
Registered User
 
Join Date: Jun 2013
Location: Eastern Ontario
Posts: 11,877
Quote:
Originally Posted by Metro-One View Post
100 years, but I am sure when the time comes they can be maintained for longer, like every other bridge structure in the world.

The West Coast climate is also much more forgivable in general for such structures than pretty much anywhere else in Canada.
They've actually used this in Ottawa as a way to explain to the public why the city went underground instead of elevated--Ottawa's climate would drive maintenance costs through the roof on elevated structures.
Reply With Quote
     
     
  #77  
Old Posted Apr 30, 2015, 4:39 PM
SFUVancouver's Avatar
SFUVancouver SFUVancouver is offline
Registered User
 
Join Date: Dec 2006
Location: Hamilton
Posts: 6,419
Quote:
Originally Posted by jeremy_haak View Post
Does anyone know what the expected life span is for the elevated structures on the Skytrain?
I recall someone telling me once that all SkyTrain structures are built to something like a 70/100 rule: 70 year design life, 100+ year structural life. As the system approaches the end of its design life they will need to do substantial upgrades but the thing itself still has several decades of structural life left in it.
__________________
VANCOUVER | Beautiful, Multicultural | Canada's Pacific Metropolis
Reply With Quote
     
     
  #78  
Old Posted Apr 30, 2015, 4:54 PM
MoreTrains MoreTrains is offline
Registered User
 
Join Date: Oct 2014
Posts: 858
Quote:
Originally Posted by 1overcosc View Post
They've actually used this in Ottawa as a way to explain to the public why the city went underground instead of elevated--Ottawa's climate would drive maintenance costs through the roof on elevated structures.
But not too much underground.
Reply With Quote
     
     
  #79  
Old Posted Apr 30, 2015, 5:16 PM
1overcosc's Avatar
1overcosc 1overcosc is offline
Registered User
 
Join Date: Jun 2013
Location: Eastern Ontario
Posts: 11,877
Quote:
Originally Posted by MoreTrains View Post
But not too much underground.
Ottawa is mostly right on the ground level with separation at intersections. But where that's not possible, it's going underground instead of being elevated.
Reply With Quote
     
     
  #80  
Old Posted May 1, 2015, 12:21 AM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 25,108
O-Train Confederation Line stations (roughly):

Elevated: 2
Ground/Underpass: 11
Trench: 8
Underground: 6
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada
Forum Jump



Forum Jump


All times are GMT. The time now is 7:51 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.