Here is a development update on all current development projects going on in the Tempe area to the best of my knowledge. Feel free to add commentary to this post as I think it would be beneficial to compile the recent few pages into one post for others to find a summary of Tempe Projects.
1. Novus Innovation Corridor:
- Phase 1(Marina Heights): Complete
- Phase 2(Sun Devil Stadium): Remaining improvements to resume after
the 2018 season.
- Phase 3(NWC University/Rural): Site prep work, grading and drainage
underway. 777 Office (162k sq. ft.), Aspen Heights residential (262 units)
and retail (27k sq. ft.) portion to begin in early 2019.
- Phase 4: Wells Fargo + Multipurpose Arena: Proposals submitted for
design
2. Jefferson Town Lake Apartments
- 258 luxury apartments, 7 stories, north side of lake. First block complete
on north end, should be open and start leasing by end of 2018.
3. Aura Watermark Apartments
- 360 luxury apartments, 7 stories, north side of lake. Topping off their last
floor. They’re moving fast on this one.
4. Watermark Phase 1
- Office portion on 4th floor the last time I saw. North side Tempe town
lake.
5. 2100 Rio Corporate Park:
- Freedom Phase 1 complete, Phase 2 is beginning interior improvements,
phase 3 TBD
- Benchmark exterior shell looks finished, interior improvements underway
- The Cameron Apartments, 349 units, 4/5 floors. Framing their 2nd floor
- Retail portion along Rio, exterior looks nice, if tenants are in place I
expect an end of 2018 open.
- 2172 Office plan submitted to city for frontage piece along rio.
6. Grand @ Papago Park:
- Phase 1 complete with tenants in place.
- Phase 2: parking garage complete, Office on 4th and 5th floor moving
along nicely.
- Broadstone apartments, 300 units, utility work underway,
stairwell/elevator shafts are up.
- Water feature through project, construction seems to be beginning
7. Crescent Rio:
- Framing is moving along, looks like they are topping off and working on
exterior improvements
8. The Local:
- West side is looking good, I like the color scheme they have going
on, framing north end and working their way around.
9. The Union Development
- Both residential towers complete and leasing. Retail tenants are still
“coming soon”
- Hilton canopy hotel underway, crane is up and beams going vertical.
10. Mirabella
- Ox Blue camera shows them completing underground garage. Making
they're way to beginning first floor soon!
11. The Collective
- Nothing new to report here, not sure if a building permit has been filed for
review. Updates?
12. Westin Tempe
- Same thing here, fencing around site is up but Tempe development site
shows no updated info.
13. The Pier
- In Plan review for building permit. 586 residential units on south end of
lake. This has been slow moving for years now. Crossing my fingers on
this one.
14. Mill + Rio
- Looks like renovation is underway at Monti’s/ Hayden House. Hines took
over the development for the office portion. Not sure when we can expect
construction to start, but its getting going at least.
15. Gilbane Apache/Terrace
- Site has been completely demo’d no existing structures remain, They are
eager to get this one going. Fall 2020 projected delivery. New renderings
looks really nice.
16. Park Place
- Fencing is up, no demo work yet(probably due to complexity of the trailer
park) but in review for building permit. Fall 2020 Projected delivery
17. Tempe Crossroads
- Last thing I heard is they were approved by city council. Working on CD’s.
Might see a fence go up soon, Fall 2020 Delivery expected.
18. River at Eastline Village
- Construction underway, Stairwells are up, I believe this is lower income
housing (50 units)
19. Metro 101
- Framing their 2nd floors right now, looks like they are moving fast on it.
20. Millennium at Rio
- 260 apartment units with food court retail, I believe this is still moving
through city council
21. ITSB-7
- SWC of Rural/University. Demo work is complete, no more carwash/taco
shop. Hoping to see updated renderings from Architekton soon.
22. ASU Greek Village
- Complete and filled with students. (Majority still don’t like living there,
figures)
23. Alliance Broadstone Rio Salado
- Site has been demo’d 276 Units with 4 story walk up units, pretty large
site. (9 acres)
24. Office at Vista Del Lago Drive on Tempe Lake (400k Sq. Ft)
- Fencing is up at this location, lets see if something happens soon
25. Tempe Streetcar Project
- Last thing I heard is they are figuring out easement issues with owners
who may be affected. Not sure when project will start.
26. The Hayden
- Condo developer got bought out by Oakland for $5m, maybe only a hotel
now??
Thats all for now.