Quote:
Originally Posted by 1487
Old city is on fire right about now.
|
Fewer and fewer surface parking lots all the time. Really nice to see. There are also 2 projects on the 100 block of Arch right near the 200 block project by PMC that summers posted. Astoban is renovating and adding floors to an existing building, and there is ground-up construction going up right next to it:
http://astoban.com/property/
The developer of the ground up construction is BPGS. I think about a 7 story building, with a delivery date for September 2018.