HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Atlantic Provinces


Reply

 
Thread Tools Display Modes
     
     
  #7481  
Old Posted Nov 28, 2023, 6:49 PM
Monctoncore Monctoncore is offline
Registered User
 
Join Date: Dec 2012
Posts: 1,271
It’s good to see this, St.George street has some lovely business’s on it, but it gets very little attention. It fits as a secondary Main St. I want to see more development along it and between it and Main.
Reply With Quote
     
     
  #7482  
Old Posted Nov 28, 2023, 8:07 PM
lirette lirette is offline
Registered User
 
Join Date: Nov 2015
Posts: 1,062
Quote:
Originally Posted by MonctonRad View Post
From today's T&T:





Full article:
https://tj.news/city-hall/st-george-street-upgrades-will-take-several-years-city (paywall)

The entire length of St. George from King to Vaughan Harvey will be rebuilt. Work isn't expected to begin until 2026.
I've been parking on St George since Avenir Centre opened, if they proceed with this, one thing they really need to do is improve the lighting on some of the side streets. Even Highfield which is a major street is nearly pitch blackat night. The street lights on some of these side streets seem to do very little.

I'd love to see St George become a more bustling version of what it is. One of the downsides of downtown Moncton compared to say Saint John, is lack of anything outside of Main St.
Reply With Quote
     
     
  #7483  
Old Posted Nov 29, 2023, 1:13 AM
MonctonRad's Avatar
MonctonRad MonctonRad is offline
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 41,034


CBC article about the upcoming work on St. George Street:

Moncton plans to rebuild St. George Street, add bike lanes, cut on-street parking
City says work on downtown street expected to start in 2026 and continue several years

Shane Magee · CBC News · Posted: Nov 28, 2023 4:17 PM AST | Last Updated: 5 hours ago
https://www.cbc.ca/news/canada/new-bruns...street-construction-bike-lanes-1.7042017

This article includes a couple of interesting explanatory graphics:


The city plans several phases for the St. George Street work, starting with storm water pipes in 2024 near Jones Lake and in 2025 along Main Street. (City of Moncton)


The plans call for separated bike lanes along St. George Street from Vaughan Harvey Boulevard to Church Street, where it would become a multi-use path on one side of the road. (City of Moncton/EXP)

Sorry lirette, but you're going to have to find some other place to park your car:

Quote:
The plans would slash on-street parking from 134 spaces to 59.
I would image almost all the lost parking spaces will be west of Church Street, where the plan is for unidirectional protected biking lanes on both sides of the street. This is also the main commercial section of St. George Street. I imagine local small business owners will be most displeased.
__________________
Go 'Cats Go
Reply With Quote
     
     
  #7484  
Old Posted Nov 29, 2023, 2:59 AM
Colouratura Colouratura is offline
Registered User
 
Join Date: Jul 2013
Posts: 79
I wonder though how businesses on St. George will feel about less parking on front of their businesses? I don't shop along there much because of that and I don't walk the area on foot because of being approached by people on the street.

Unrelated...
I saw an ad on Facebook Marketplace for 2 floors of business space on Main St. It is the space where Bayside Barbers currently is. Says available Feb 2024.
Reply With Quote
     
     
  #7485  
Old Posted Nov 29, 2023, 4:11 PM
jonny golden jonny golden is online now
Registered User
 
Join Date: May 2019
Posts: 2,923
Baton Rouge - There's a mobile crane working on site and the structural steel is taking shape. They're making good progress. It'll be quite the transformation from what was there before.
I won't say anything about all the vacant Aquilini land that's available behind this project though. I promise.
Reply With Quote
     
     
  #7486  
Old Posted Nov 29, 2023, 5:04 PM
Sandbagger Sandbagger is offline
Registered User
 
Join Date: Sep 2015
Posts: 223
Quote:
Originally Posted by lirette View Post
I've been parking on St George since Avenir Centre opened, if they proceed with this, one thing they really need to do is improve the lighting on some of the side streets. Even Highfield which is a major street is nearly pitch blackat night. The street lights on some of these side streets seem to do very little.
Agreed on this. I'm really hoping they also take the opportunity to bury the power lines from Vaughn Harvey to Botsford which would make a huge difference visually. Even up to Lutz or the train tracks would be great.
Reply With Quote
     
     
  #7487  
Old Posted Nov 29, 2023, 5:11 PM
MonctonRad's Avatar
MonctonRad MonctonRad is offline
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 41,034
Quote:
Originally Posted by Sandbagger View Post
Agreed on this. I'm really hoping they also take the opportunity to bury the power lines from Vaughn Harvey to Botsford which would make a huge difference visually. Even up to Lutz or the train tracks would be great.
The burial of the power lines (at least on St. George Street) is a given.

lirette is entirely correct about the poor quality of the street lighting on side streets in the downtown core, including Highfield which should be a major connector between St. George & Main. This is frankly a civic embarrasment and should be immediately addressed.

As for the loss of on street parking on St. George, I wonder if the local businesses could pressure the city into building a small parking garage in the neighbourhood to make up for this. The lot where Wesley United Church formerly stood is still vacant................
__________________
Go 'Cats Go
Reply With Quote
     
     
  #7488  
Old Posted Nov 29, 2023, 5:29 PM
jnaygull jnaygull is offline
Registered User
 
Join Date: Jun 2023
Posts: 183
Quote:
Originally Posted by MonctonRad View Post
The burial of the power lines (at least on St. George Street) is a given.

lirette is entirely correct about the poor quality of the street lighting on side streets in the downtown core, including Highfield which should be a major connector between St. George & Main. This is frankly a civic embarrasment and should be immediately addressed.

As for the loss of on street parking on St. George, I wonder if the local businesses could pressure the city into building a small parking garage in the neighbourhood to make up for this. The lot where Wesley United Church formerly stood is still vacant................
I think the premise of the added biking lanes is to make the St George area more pedestrian. I doubt the city will be building parking garages anytime soon anywhere in the city. That being said, a future developer may be encouraged to include excess underground parking themed into whatever new developments are built in that area.
Reply With Quote
     
     
  #7489  
Old Posted Nov 29, 2023, 9:12 PM
MonctonRad's Avatar
MonctonRad MonctonRad is offline
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 41,034
Quote:
Originally Posted by jonny golden View Post
Baton Rouge - There's a mobile crane working on site and the structural steel is taking shape. They're making good progress. It'll be quite the transformation from what was there before.
I won't say anything about all the vacant Aquilini land that's available behind this project though. I promise.
I drove by there today on the strength of your post to see what is going on, and can confirm that the first of the structural steel, closest to the Crowne Plaza itself has been installed. As previously suspected and announced on the forum, this building will indeed be two storey. The rumour is a sports bar format on the ground level and fine dining on the second level.
__________________
Go 'Cats Go
Reply With Quote
     
     
  #7490  
Old Posted Nov 29, 2023, 9:39 PM
jonny golden jonny golden is online now
Registered User
 
Join Date: May 2019
Posts: 2,923
Quote:
Originally Posted by MonctonRad View Post
I drove by there today on the strength of your post to see what is going on, and can confirm that the first of the structural steel, closest to the Crowne Plaza itself has been installed. As previously suspected and announced on the forum, this building will indeed be two storey. The rumour is a sports bar format on the ground level and fine dining on the second level.
Just the business from the hotel itself should really help this restaurant flourish, and of course the business generated by the Avenir center on game nights.

Although two floors doesn't seem large scale, it'll make a much bigger impact than if it was only one storey.
Reply With Quote
     
     
  #7491  
Old Posted Nov 29, 2023, 10:44 PM
Monctoncore Monctoncore is offline
Registered User
 
Join Date: Dec 2012
Posts: 1,271
Quote:
Originally Posted by jonny golden View Post
Just the business from the hotel itself should really help this restaurant flourish, and of course the business generated by the Avenir center on game nights.

Although two floors doesn't seem large scale, it'll make a much bigger impact than if it was only one storey.
It will also look better than what was there before. I just hope they don’t go suburban with the look. I wish there were renders
Reply With Quote
     
     
  #7492  
Old Posted Nov 30, 2023, 2:37 PM
jonny golden jonny golden is online now
Registered User
 
Join Date: May 2019
Posts: 2,923
The new Baton Rouge (two floors) will absolutely be an improvement over the run down building that was there before. It's also nice to see new life being breathed into the old bus terminal next door. It's great to see that this block will have a new vibrancy to it

There's also the new building under construction on the grubby vacant lot at the corner of Vaughan Harvey & Main. When all of these projects are completed, the neighbourhood around the Avenir Center will be much improved.

Should I mention the elephant in the room? The vacant Crombie building at 1222 Main Street.
Reply With Quote
     
     
  #7493  
Old Posted Nov 30, 2023, 9:05 PM
MonctonRad's Avatar
MonctonRad MonctonRad is offline
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 41,034
Finally, Finally, we have official confirmation:



We have known about this, and talked about this on SSP for over two years now. It's a relief to finally see the truth has been revealed officially.

Summer 2024 is only 7-8 months away. They have a lot of work to do!!!

Let's see some actual renders!!!
__________________
Go 'Cats Go
Reply With Quote
     
     
  #7494  
Old Posted Nov 30, 2023, 9:15 PM
Monctoncore Monctoncore is offline
Registered User
 
Join Date: Dec 2012
Posts: 1,271
It was shared by the GM of the hotel, so maybe he will share them, or keep it private. We will see!
Reply With Quote
     
     
  #7495  
Old Posted Dec 1, 2023, 9:31 PM
MonctonRad's Avatar
MonctonRad MonctonRad is offline
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 41,034
They have nearly completed paving and curbing the reconstructed Westmorland Street downtown. It should be opening within the week.
__________________
Go 'Cats Go
Reply With Quote
     
     
  #7496  
Old Posted Dec 2, 2023, 3:10 PM
MonctonRad's Avatar
MonctonRad MonctonRad is offline
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 41,034
They have finished pouring a very solid looking concrete pad in front of the old bus station (soon to be "The Bunker" golf simulator and sports bar). This is destined to be an outdoor patio for the business. I love how they have saved the existing trees on the property and will incorporate them into the patio area.


Thanks to Jeff Boucher for sending me the photo

You can see the structural steel going up for the Baton Rouge in the background. The synergy between The Bunker and Baton Rouge next door will be fantastic!

Just think about it:
- Monck 10
- Carrabbas
- Baton Rouge
- The Bunker

Would any of these businesses exist without the Avenir Centre?

- Hyatt Place Hotel
- Hilton Garden Inn

Would either of these two hotels exist without the Avenir Centre???

I hope the naysayers from about 8-10 years ago are ashamed of themselves......
__________________
Go 'Cats Go
Reply With Quote
     
     
  #7497  
Old Posted Dec 2, 2023, 4:15 PM
Monctoncore Monctoncore is offline
Registered User
 
Join Date: Dec 2012
Posts: 1,271
I’m curious, it must be an outdoor patio area, because they left the trees. Maybe more than just a indoor golf bar?
Reply With Quote
     
     
  #7498  
Old Posted Dec 2, 2023, 4:40 PM
MonctonRad's Avatar
MonctonRad MonctonRad is offline
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 41,034
Quote:
Originally Posted by Monctoncore View Post
I’m curious, it must be an outdoor patio area, because they left the trees. Maybe more than just a indoor golf bar?
The Bunker in Ottawa also serves a limited menu in addition to the bar itself. Perhaps the Moncton location is going to be a little more ambitious. Maybe they are going to try and cater to Avenir Centre traffic too. This would make sense.
__________________
Go 'Cats Go
Reply With Quote
     
     
  #7499  
Old Posted Dec 2, 2023, 4:51 PM
David_99's Avatar
David_99 David_99 is offline
Registered User
 
Join Date: Nov 2008
Posts: 850
Quote:
Originally Posted by MonctonRad View Post
I hope the naysayers from about 8-10 years ago are ashamed of themselves......
Yeah, what a “white elephant” that Avenir turned out to be! /s
Reply With Quote
     
     
  #7500  
Old Posted Dec 2, 2023, 11:30 PM
BlackYear's Avatar
BlackYear BlackYear is offline
Registered User
 
Join Date: Jan 2009
Posts: 1,275
Quote:
Originally Posted by MonctonRad View Post

I hope the naysayers from about 8-10 years ago are ashamed of themselves......
Naysayers: "Avenir still has no parking. Millions lost and wasted. There was nothing wrong with the Coliseum with all that free parking. They could have placed Carrabbas, Baton Rouge and the fake golfing in Highfield Square where there was plenty lease space available and lots of FREE parking. City dropped the ball."

Yup, they're drinking their Coors Light on a Saturday night and are complaining about everything. No vision for the future, no aspirations in upgrading their beer choices.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Atlantic Provinces
Forum Jump



Forum Jump


All times are GMT. The time now is 1:39 AM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.