Old Posted Nov 28, 2013, 7:15 AM
Wooster's Avatar
Wooster Wooster is offline
Round Head
 
Join Date: Nov 2003
Posts: 12,689
Quote:
Originally Posted by DizzyEdge View Post
What would be the route through downtown of connected lines?
Could still be 2nd SW via 10th Avenue.
     
     
  #7162  
Old Posted Nov 28, 2013, 7:23 AM
DizzyEdge's Avatar
DizzyEdge DizzyEdge is offline
My Spoon Is Too Big
 
Join Date: Oct 2006
Location: Calgary
Posts: 9,162
Would be interesting to have an elevated station at the east edge of olympic plaza with escalator down to grade to connect with 7th ave and then 2nd escalator underground to tunnel connection to city hall underground station for 8th ave.

Oh wait it was originally going to be 2nd st W not E to Eau Claire wasn't it.. hmm.
__________________
Concerned about protecting Calgary's built heritage?
www.CalgaryHeritage.org
News - Heritage Watch - Forums
     
     
  #7163  
Old Posted Nov 28, 2013, 8:07 AM
Policy Wonk's Avatar
Policy Wonk Policy Wonk is offline
Inflatable Hippo
 
Join Date: Mar 2006
Location: Suburban Las Vegas
Posts: 4,015
Quote:
Originally Posted by Wooster View Post
With regard to the downtown segment and compromise, one question to folks, curious what people would think of the idea (just my own random thought) of going above grade through a segment of Beltline and Downtown? It would be much less expensive than underground, but would need to essentially sit at the plus 30 level. It would require probably 2-3 stations. I wonder whether it might be possible to retrofit or design some buildings that could tie in to such stations (to provide elevator infrastructure and such). It also has the potential to be a bit ugly, but maybe at the same time an interesting design opportunity?
Modern day elevated rail proposals have met a lot of opposition, (i.e. Oahu)

Quote:
One practical reason to connect the two legs is the desire to have only one transit garage, which is a big expense. I think it's also desirable to have both legs go into the heart of the downtown core (including touching 7th Avenue) for connections to other lines.
I seem to recall Oliver Bowen cost about $120m. Could the connections between 7th, 8th and 9th not be made with large indoor Plus 15 concourses with moving walkways? This is not a long distance.
__________________
Public Administration 101: Keep your mouth shut until obligated otherwise and don't get in public debates with housewives.
     
     
  #7164  
Old Posted Nov 28, 2013, 12:12 PM
mellbell416 mellbell416 is offline
Registered User
 
Join Date: Aug 2012
Posts: 165
Quote:
Originally Posted by mellbell416 View Post
Oh, that is just fabulous news! Getting a NC SE LRT is going to be a total gamechanger....Right now, I loooooove Shane Keating.

I am really looking forward to seeing how the plans get fleshed out - if money is only coming in 2015, does that mean that construction of the SETWAY only starts in 2016 or something?
Ok, I found an answer to my question:

Mayor Naheed Nenshi sided with the transit plan, and said construction could begin on the project next year or in 2015, depending on whether council found further dollars or a good borrowing plan to help fast-track the project.

http://www.calgaryherald.com/news/Counci...+southeast+transitway/9219709/story.html
     
     
  #7165  
Old Posted Nov 28, 2013, 4:17 PM
MalcolmTucker MalcolmTucker is online now
Registered User
 
Join Date: May 2007
Posts: 11,595
A good day for the city for sure. Unless the federal government introduces a new transit plan outside of the building canada fund, getting matching funds for a specific project is only a matter of accounting.

Provincially there will likely be the second tranche of green trip in the project time frame, and the province has begun looking at consolidating municipal grants to make them more flexible.
     
     
  #7166  
Old Posted Nov 28, 2013, 4:39 PM
Colin's Avatar
Colin Colin is offline
Registered User
 
Join Date: Aug 2007
Location: Calgary
Posts: 364
Quote:
Originally Posted by Wooster View Post
One practical reason to connect the two legs is the desire to have only one transit garage, which is a big expense. I think it's also desirable to have both legs go into the heart of the downtown core (including touching 7th Avenue) for connections to other lines.

With regard to the downtown segment and compromise, one question to folks, curious what people would think of the idea (just my own random thought) of going above grade through a segment of Beltline and Downtown? It would be much less expensive than underground, but would need to essentially sit at the plus 30 level. It would require probably 2-3 stations. I wonder whether it might be possible to retrofit or design some buildings that could tie in to such stations (to provide elevator infrastructure and such). It also has the potential to be a bit ugly, but maybe at the same time an interesting design opportunity?

Design is still very early days, and funding availability will certainly drive alignment and other decisions on this.
So something similar to the L line in Chicago?
     
     
  #7167  
Old Posted Nov 28, 2013, 5:20 PM
sim sim is offline
Registered User
 
Join Date: Aug 2008
Posts: 863
From the Construction Thread:

Quote:
Originally Posted by Policy Wonk View Post
I'm baffled by it. There would never be enough transfers between discrete NC and SE lines to justify combining them at the cost of a mile long urban tunnel.
You got a little bit of an endogeneity problem in your equation there: How can you know the know the number of transfers that would take place when in the second case there would be no transfers?

Either your wording is incorrect, or you are sitting on an OD matrix that might allude to this being a likelihood. I'd wager a guess that there is actually a fairly significant amount of trips that have an OD pair closely along this diametrical (combined) alignment.

In any case, it's not just about these exact trips. It's about building a functional, well connected network that even further down the road acts in a way that is much greater than the sum of its parts: The ability to get from near anywhere to near anywhere with 1 transfer. This piece of infrastructure would be a large piece of that puzzle.

Or we could have moving sidewalks (sorry)
     
     
  #7168  
Old Posted Nov 28, 2013, 5:43 PM
Allan83 Allan83 is offline
BANNED
 
Join Date: Nov 2012
Location: Calgary
Posts: 1,410
Yay for the green line! I think a transitway is a very good solution for this route. It may not be quite as nice a ride as an LRT, but in a city where both transitways and LRTs exist I think people will come to see that it’s still a pretty good option, and a whole lot better than the standard bone shakers.
     
     
  #7169  
Old Posted Nov 28, 2013, 5:48 PM
fusili's Avatar
fusili fusili is offline
Retrofit Urbanist
 
Join Date: Sep 2007
Posts: 6,692
Quote:
Originally Posted by Wooster View Post
One practical reason to connect the two legs is the desire to have only one transit garage, which is a big expense. I think it's also desirable to have both legs go into the heart of the downtown core (including touching 7th Avenue) for connections to other lines.

With regard to the downtown segment and compromise, one question to folks, curious what people would think of the idea (just my own random thought) of going above grade through a segment of Beltline and Downtown? It would be much less expensive than underground, but would need to essentially sit at the plus 30 level. It would require probably 2-3 stations. I wonder whether it might be possible to retrofit or design some buildings that could tie in to such stations (to provide elevator infrastructure and such). It also has the potential to be a bit ugly, but maybe at the same time an interesting design opportunity?

Design is still very early days, and funding availability will certainly drive alignment and other decisions on this.
I would not be averse to such a study. Using 10th and 2nd could still work, but 2nd has a whole bunch of +15s.

Policy Wonk's idea of using the CP ROW could very well be a very cost effective way of getting the SE line into downtown. Stations could be at 4ST SE, Centre Street (threre are platforms there already), 4th ST SW, 8th ST SW and 11th ST SW. If that was the case, 2nd street becomes less needed for a NC alignment coming into the downtown.
__________________
Not everything that can be counted counts, and not everything that counts can be counted.
     
     
  #7170  
Old Posted Nov 28, 2013, 6:51 PM
Fuzz's Avatar
Fuzz Fuzz is offline
Registered User
 
Join Date: Dec 2011
Posts: 1,421
Would CP really give up part of their ROW? What is the likelihood of that?

What about stations? Would the train be on the outside 2 lines? otherwise I'm not sure how stations would work...
     
     
  #7171  
Old Posted Nov 28, 2013, 6:57 PM
Chadillaccc's Avatar
Chadillaccc Chadillaccc is offline
ARTchitecture
 
Join Date: Feb 2011
Location: Cala Ghearraidh
Posts: 22,842
I just think the whole idea of not connecting them and especially using a low density railway ROW is really small town thinking, tantamount to the South Line in the 80s when Calgary was less than half a million people.
__________________
Strong & Free

Mohkínstsis — 1.6 million people at the Foothills of the Rocky Mountains, 400 high-rises, a 300-metre SE to NW climb, over 1000 kilometres of pathways, with 20% of the urban area as parkland.
     
     
  #7172  
Old Posted Nov 28, 2013, 7:07 PM
mersar's Avatar
mersar mersar is offline
Registered User
 
Join Date: May 2006
Location: Calgary, AB
Posts: 10,083
Quote:
Originally Posted by Fuzz View Post
Would CP really give up part of their ROW? What is the likelihood of that?

What about stations? Would the train be on the outside 2 lines? otherwise I'm not sure how stations would work...
Unlikely, and it would cost many tens of millions of dollars (possibly into the hundreds of millions) even if they were interested.

The stations would also be quite complicated, at best you'd do a side load with an elevated crossing joining the two platforms (so its at least level to downtown or the beltline for each platform), at worst centre load and force every person to go up and over either the CP and/or LRT tracks depending on the direction they are coming from, and down to the platform. Or go below ground with virtually the same pattern.
__________________

Live or work in the Beltline? Check out the Official Beltline web site here
     
     
  #7173  
Old Posted Nov 28, 2013, 9:13 PM
DizzyEdge's Avatar
DizzyEdge DizzyEdge is offline
My Spoon Is Too Big
 
Join Date: Oct 2006
Location: Calgary
Posts: 9,162
Quote:
Originally Posted by MalcolmTucker View Post
A good day for the city for sure. Unless the federal government introduces a new transit plan outside of the building canada fund, getting matching funds for a specific project is only a matter of accounting.

Provincially there will likely be the second tranche of green trip in the project time frame, and the province has begun looking at consolidating municipal grants to make them more flexible.
Are you saying that it's pretty much in the bag that they city will have 1040 million to build this?
__________________
Concerned about protecting Calgary's built heritage?
www.CalgaryHeritage.org
News - Heritage Watch - Forums
     
     
  #7174  
Old Posted Nov 28, 2013, 9:22 PM
Chadillaccc's Avatar
Chadillaccc Chadillaccc is offline
ARTchitecture
 
Join Date: Feb 2011
Location: Cala Ghearraidh
Posts: 22,842
Is that how much both subway portions will cost together?
__________________
Strong & Free

Mohkínstsis — 1.6 million people at the Foothills of the Rocky Mountains, 400 high-rises, a 300-metre SE to NW climb, over 1000 kilometres of pathways, with 20% of the urban area as parkland.
     
     
  #7175  
Old Posted Nov 28, 2013, 9:22 PM
MalcolmTucker MalcolmTucker is online now
Registered User
 
Join Date: May 2007
Posts: 11,595
Quote:
Originally Posted by DizzyEdge View Post
Are you saying that it's pretty much in the bag that they city will have 1040 million to build this?
The City of Calgary builds too much new infrastructure to get a 1/3rd match from the federal government on all projects. So it doesn't really matter which projects get the match, since the City will always be getting its full allocation. The provincial funds would have to come from MSI freed up by the Green Trip announcement (I am not really sure on the accounting around it), phase two green trip or by out year MSI/ other grants (like the airport tunnel).
     
     
  #7176  
Old Posted Nov 28, 2013, 9:28 PM
DizzyEdge's Avatar
DizzyEdge DizzyEdge is offline
My Spoon Is Too Big
 
Join Date: Oct 2006
Location: Calgary
Posts: 9,162
The main thing I've been trying to wrap my head around is whether this will be built in usable stages, or if the announcement just means that in 2024 it will open.
__________________
Concerned about protecting Calgary's built heritage?
www.CalgaryHeritage.org
News - Heritage Watch - Forums
     
     
  #7177  
Old Posted Nov 28, 2013, 9:32 PM
mersar's Avatar
mersar mersar is offline
Registered User
 
Join Date: May 2006
Location: Calgary, AB
Posts: 10,083
Quote:
Originally Posted by DizzyEdge View Post
The main thing I've been trying to wrap my head around is whether this will be built in usable stages, or if the announcement just means that in 2024 it will open.
I don't think anyone, even those down at city hall, know that yet. From the perspective of efficiency it may be best to do it all at once as a single multi-year contract perhaps, but the fact that now the funding is 'secured' means it may be possible to borrow money against that future funding to get it done sooner than that date (or 2025, which is actually 10 years from when the fund starts getting money into it)
__________________

Live or work in the Beltline? Check out the Official Beltline web site here
     
     
  #7178  
Old Posted Nov 28, 2013, 9:34 PM
DizzyEdge's Avatar
DizzyEdge DizzyEdge is offline
My Spoon Is Too Big
 
Join Date: Oct 2006
Location: Calgary
Posts: 9,162
Quote:
Originally Posted by mersar View Post
I don't think anyone, even those down at city hall, know that yet. From the perspective of efficiency it may be best to do it all at once as a single multi-year contract perhaps, but the fact that now the funding is 'secured' means it may be possible to borrow money against that future funding to get it done sooner than that date (or 2025, which is actually 10 years from when the fund starts getting money into it)
That would be ideal. Borrow and get it done now. I was unclear what was happening on Centre St. Rush hour transit/2 person lane converted to permanent transit only lane?
__________________
Concerned about protecting Calgary's built heritage?
www.CalgaryHeritage.org
News - Heritage Watch - Forums
     
     
  #7179  
Old Posted Nov 28, 2013, 9:36 PM
fusili's Avatar
fusili fusili is offline
Retrofit Urbanist
 
Join Date: Sep 2007
Posts: 6,692
Quote:
Originally Posted by DizzyEdge View Post
The main thing I've been trying to wrap my head around is whether this will be built in usable stages, or if the announcement just means that in 2024 it will open.
It means that they are allocating the 52 million each year until that year. Actual build out will be a separate story
__________________
Not everything that can be counted counts, and not everything that counts can be counted.
     
     
  #7180  
Old Posted Nov 28, 2013, 9:45 PM
Chadillaccc's Avatar
Chadillaccc Chadillaccc is offline
ARTchitecture
 
Join Date: Feb 2011
Location: Cala Ghearraidh
Posts: 22,842
I agree it would be good to build both downtown subway segments at the same time. It would certainly save a lot of headaches once they decide which one is going to go under the other, as they will have to dig pretty deep for that, and will probably have to build the deeper section first. The problem is having Stephen Avenue businesses shut down for years, unless they bore, which I doubt they will do.
__________________
Strong & Free

Mohkínstsis — 1.6 million people at the Foothills of the Rocky Mountains, 400 high-rises, a 300-metre SE to NW climb, over 1000 kilometres of pathways, with 20% of the urban area as parkland.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Calgary > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 7:43 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.